← Back
Predominantly retail with other uses
718 MANHATTAN AVENUE
BROOKLYN · BIN 3065654
💬 Discuss this project
1931Year Built
2Stories
K4Building Class
C4-3AZoning
4,125 sfGross Floor Area
4Units
8 Open Violations ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: MR ARIEL CORP · 2,500 sf lot · 1.65 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbing
Floor 14p · 3 filings · 20 docs
4 jobs · most recent 05/25/2023
General Wiring
FiledStatusContractorScope
05/25/2023CompleteFIBERTEK DATA & ELEC CORPGeneral Wiring
05/02/2023CompleteLENS ELECTRIC, INCGeneral Wiring
11/15/2019CompleteACCURATE ELEC'L CORP.—
05/23/2018Permit IssuedWCK ELECTRIC CORP.—
Building Lifecycle
All (59)Filed (5)Permit Issued (3)Signed Off (3)Violation (22)Inspection (2)Objection (6)Special Inspection (18)
08/04/2023
Signed off — Alteration
PAA P1 is filed to change record of altering gross floor area of the bldg from more than 50% to no more than 50% of the gross floor area of the bldg for this interior renovation of the existing store, and amend plans. INTERIOR RENOVATION OF EXIST STORE
B00592308-I1
08/04/2023
Signed off — Alteration
B00592314-I1
08/04/2023
Signed off — Alteration
PAA P1 IS FILED TO REMOVE THE GAS METER ROOM FROM 1ST FLOOR LAYOUT TO MATCH THE GC B00592308 LAYOUT. FRESH AIR INTAKE TO THE 1ST FLOOR STORE TO REMAIN. CONSTRUCT A DUCTLESS MINI-SPLIT HVAC SYSTEM AND FRESH AIR INTAKE IN CONJUNCTION WITH GC B00592308.
B00592320-I1
07/24/2023
Violation issued (ECB, closed)
Construction
07/21/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/21/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/27/2023
Permit issued — Plumbing
B00592314-I1-PL
05/22/2023
Permit issued — Mechanical Systems
B00592320-I1-MS
05/17/2023
Permit issued — General Construction
B00592308-I1-GC
04/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERGEY DRABKIN
04/06/2023
Special inspection requirement — Lighting controls
SERGEY DRABKIN
04/06/2023
Special inspection requirement — Interior lighting power
SERGEY DRABKIN
04/06/2023
Special inspection requirement — Energy Code Compliance Inspections
SERGEY DRABKIN
04/06/2023
Special inspection requirement — Final
SERGEY DRABKIN
04/06/2023
Special inspection requirement — Fire-Resistance Rated Construction
SERGEY DRABKIN
04/05/2023
Objection raised — Energy
04/05/2023
Objection resolved — Addressed
04/05/2023
Objection raised — Scope
04/05/2023
Objection resolved — Addressed
04/05/2023
Special inspection requirement — Ventilation and air distribution system
SERGEY DRABKIN
04/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERGEY DRABKIN
04/05/2023
Special inspection requirement — Mechanical Systems
SERGEY DRABKIN
04/05/2023
Special inspection requirement — Final
SERGEY DRABKIN
04/05/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
SERGEY DRABKIN
04/05/2023
Special inspection requirement — HVAC-R and service water heating system controls
SERGEY DRABKIN
04/02/2023
Filed — Alteration
PAA P1 is filed to change record of altering gross floor area of the bldg from more than 50% to no more than 50% of the gross floor area of the bldg for this interior renovation of the existing store, and amend plans. INTERIOR RENOVATION OF EXIST STORE
B00592308-P1
04/02/2023
Filed — Alteration
PAA P1 IS FILED TO REMOVE THE GAS METER ROOM FROM 1ST FLOOR LAYOUT TO MATCH THE GC B00592308 LAYOUT. FRESH AIR INTAKE TO THE 1ST FLOOR STORE TO REMAIN. CONSTRUCT A DUCTLESS MINI-SPLIT HVAC SYSTEM AND FRESH AIR INTAKE IN CONJUNCTION WITH GC B00592308.
B00592320-P1
04/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERGEY DRABKIN
04/02/2023
Special inspection requirement — Ventilation and air distribution system
SERGEY DRABKIN
04/02/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
SERGEY DRABKIN
04/02/2023
Special inspection requirement — HVAC-R and service water heating system controls
SERGEY DRABKIN
04/02/2023
Special inspection requirement — Final
SERGEY DRABKIN
04/02/2023
Special inspection requirement — Mechanical Systems
SERGEY DRABKIN
12/16/2022
Violation issued (ECB, closed)
Construction
02/06/2022
Objection resolved — Addressed
01/31/2022
Objection raised — Scope
01/21/2022
Filed — Alteration
B00592314-I1
01/21/2022
Filed — Alteration
PAA P1 IS FILED TO REMOVE THE GAS METER ROOM FROM 1ST FLOOR LAYOUT TO MATCH THE GC B00592308 LAYOUT. FRESH AIR INTAKE TO THE 1ST FLOOR STORE TO REMAIN. CONSTRUCT A DUCTLESS MINI-SPLIT HVAC SYSTEM AND FRESH AIR INTAKE IN CONJUNCTION WITH GC B00592308.
B00592320-I1
01/19/2022
Filed — Alteration
PAA P1 is filed to change record of altering gross floor area of the bldg from more than 50% to no more than 50% of the gross floor area of the bldg for this interior renovation of the existing store, and amend plans. INTERIOR RENOVATION OF EXIST STORE
B00592308-I1
03/16/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/09/2016
Violation issued (ECB, closed)
Unknown
10/02/2012
Violation issued (HPD, open)
B
10/02/2012
Violation issued (HPD, closed)
C
10/02/2012
Violation issued (HPD, open)
B
10/02/2012
Violation issued (HPD, open)
B
10/02/2012
Violation issued (HPD, open)
B
10/02/2012
Violation issued (HPD, open)
C
10/02/2012
Violation issued (HPD, open)
B
08/29/2012
Violation issued (HPD, open)
A
08/29/2012
Violation issued (HPD, open)
B
03/04/2008
Violation issued (ECB, closed)
Boilers
03/04/2008
Violation issued (ECB, closed)
Boilers
06/30/2006
Violation issued (ECB, closed)
Boilers
06/30/2006
Violation issued (ECB, closed)
Boilers
11/08/2004
Violation issued (ECB, closed)
Boilers
11/08/2004
Violation issued (ECB, closed)
Boilers
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/27/2002
Violation issued (ECB, closed)
Boilers
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MR ARIEL CORP303/22/2026
J RAFA CLEANERS INC303/22/2026
RAFAELS CLEANERS CORP303/22/2026
178 MANHATTAN AVE203/21/2026
178 ST203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CONSELA ENGINEERING P.C.504/02/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
IR CONTRACTING INCGeneral Contractor307/08/2026
ZONE PLUMBING & HEATING CPlumbing307/08/2026
LEONID SIMKINElectrical103/21/2026
WILLIAM MCGANNElectrical103/21/2026
YOUNG LIMElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONSELA ENGINEERING P.C.353504/02/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C06/27/2023
DOB NOWMechanical SystemsSigned-offIR CONTRACTING INC05/22/2023
DOB NOWGeneral ConstructionSigned-offIR CONTRACTING INC05/17/2023
BISMHISSUEDMETRO TECH MACHINERY INC08/27/2019
BISPLISSUEDPLUMBING & HTG DOCTOR INC09/12/2006
BIS—ISSUEDGLOBE PL & HTG09/12/2006
BISOTISSUEDMETROPOLITAN LAUNDRY MACHINERY09/25/2003
BISPLISSUEDA.M.N. CORPORATION05/29/2003
BISOTISSUEDSTORR BUILDING CONSTRUCTION04/21/2003
BISBLISSUEDMAGNUM PLUMBING & HEATING CORP.09/04/2002
BISOTISSUEDGOOD-WILL MECHANICAL CORP.08/12/2002
BISBLISSUEDSUNSET PLUMB & FIRE PROTECTION01/06/1995
BISPLISSUEDSUNSET PLUMB & FIRE PROTECTION01/06/1995
BISOTISSUEDEVANGELOS REPAIR SERVICE12/06/1994
BISMHISSUEDG & R GENERAL CONSTRUCTION01/27/1993
BISPLISSUEDGRO WIT PLG & HTG. INC01/27/1993
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/21/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/21/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
04/06/2023Fire-Resistant Penetrations and JointsSERGEY DRABKINspecial
04/06/2023Lighting controlsSERGEY DRABKINenergy_progress
04/06/2023Interior lighting powerSERGEY DRABKINenergy_progress
04/06/2023Energy Code Compliance InspectionsSERGEY DRABKINprogress
04/06/2023FinalSERGEY DRABKINprogress
04/06/2023Fire-Resistance Rated ConstructionSERGEY DRABKINprogress
04/05/2023Ventilation and air distribution systemSERGEY DRABKINenergy_progress
04/05/2023Fire-Resistant Penetrations and JointsSERGEY DRABKINspecial
04/05/2023Mechanical SystemsSERGEY DRABKINspecial
04/05/2023FinalSERGEY DRABKINprogress
04/05/2023HVAC-R and service water piping design and insulationSERGEY DRABKINenergy_progress
04/05/2023HVAC-R and service water heating system controlsSERGEY DRABKINenergy_progress
04/02/2023Fire-Resistant Penetrations and JointsSERGEY DRABKINspecial
04/02/2023Ventilation and air distribution systemSERGEY DRABKINenergy_progress
04/02/2023HVAC-R and service water piping design and insulationSERGEY DRABKINenergy_progress
04/02/2023HVAC-R and service water heating system controlsSERGEY DRABKINenergy_progress
04/02/2023FinalSERGEY DRABKINprogress
04/02/2023Mechanical SystemsSERGEY DRABKINspecial
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/31/2026B00592314-I1Request digital key ↗
08/31/2026B00592320-P1Request digital key ↗
08/31/2026B00592320-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISWORK PERMIT APPLICATION2
09/04/2019321957780Open ↗
09/04/2019321957780Open ↗
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026B00592308-I1Open ↗
09/01/2026B00592308-I1Open ↗
09/01/2026B00592308-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/31/2026B00592308-I1Open ↗
08/31/2026B00592308-P1Open ↗
08/31/2026B00592314-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B00592308-I1Open ↗
08/23/2026B00592320-I1Open ↗
08/23/2026B00592320-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/04/2019321957780Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/06/2019321957780Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/31/2026B00592314-I1Open ↗
08/31/2026B00592320-P1Open ↗
08/31/2026B00592320-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/20/2019321957780Open ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.3
08/31/2026B00592320-I1Open ↗
08/13/2026B00592314-I1Open ↗
08/13/2026B00592308-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/04/2019321957780Open ↗
▸Inspections & Test Reports1
▸BISHYDRO FLOW TEST LETTER1
08/20/2019321957780Open ↗
▸Approvals, Objections & Sign-offs1
▸BISSCHEDULE A - OCCUPANCY / USE1
08/06/2019321957780Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
06/12/2019321957780Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
06/12/2019321957780Open ↗