RoofUnder Construction18p · 7 filings · 20 docs
ElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems
PROPOSED PLUMBING WORK AT CELLAR AND FIRST FLOOR AS PER PLAN.NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
9 documents
Installation of new sprinkler/standpipe systems as shown on plans in conjunction with NB job # 420666283
On file for this project
20 documents · 3 drawing sheets
Plumbing work as shown on plans in conjunction with NB job # 420666283. Work to include installation of plumbing fixtures and related piping for the entire building.
On file for this project
33 documents · 4 drawing sheets
Latest 3 of 7 filings on this floor.
Bulkhead11p · 3 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Plumbing work as shown on plans in conjunction with NB job # 420666283. Work to include installation of plumbing fixtures and related piping for the entire building.
On file for this project
33 documents · 8 drawing sheets
Mechanical work as shown in plans in conjunction with NB filing job # 420666283 (filed to add additional equipment to the scope of work).
On file for this project
71 documents · 2 drawing sheets
Structural work in conjunction with new building application # 420666283
On file for this project
10 documents · 1 drawing sheet
Floor 1212p · 4 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Installation of new sprinkler/standpipe systems as shown on plans in conjunction with NB job # 420666283
On file for this project
20 documents · 4 drawing sheets
Plumbing work as shown on plans in conjunction with NB job # 420666283. Work to include installation of plumbing fixtures and related piping for the entire building.
On file for this project
33 documents · 6 drawing sheets
Mechanical work as shown in plans in conjunction with NB filing job # 420666283 (filed to add additional equipment to the scope of work).
On file for this project
71 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 1115p · 4 filings · 20 docs
ArchitectureCivilFire ProtectionMechanicalPlumbingStructuralOther
Installation of new sprinkler/standpipe systems as shown on plans in conjunction with NB job # 420666283
On file for this project
20 documents · 7 drawing sheets
Plumbing work as shown on plans in conjunction with NB job # 420666283. Work to include installation of plumbing fixtures and related piping for the entire building.
On file for this project
33 documents · 4 drawing sheets
Mechanical work as shown in plans in conjunction with NB filing job # 420666283 (filed to add additional equipment to the scope of work).
On file for this project
71 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 103p · 2 filings · 20 docs
PlumbingStructural
Plumbing work as shown on plans in conjunction with NB job # 420666283. Work to include installation of plumbing fixtures and related piping for the entire building.
On file for this project
33 documents · 2 drawing sheets
Structural work in conjunction with new building application # 420666283
On file for this project
10 documents · 1 drawing sheet
Floor 915p · 5 filings · 20 docs
ArchitectureCivilFire ProtectionGeneralMechanicalPlumbingStructural
Installation of new sprinkler/standpipe systems as shown on plans in conjunction with NB job # 420666283
On file for this project
20 documents · 7 drawing sheets
Plumbing work as shown on plans in conjunction with NB job # 420666283. Work to include installation of plumbing fixtures and related piping for the entire building.
On file for this project
33 documents · 4 drawing sheets
Mechanical work as shown in plans in conjunction with NB filing job # 420666283 (filed to add additional equipment to the scope of work).
On file for this project
71 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 822p · 3 filings · 20 docs
CivilFire ProtectionMechanicalPlumbing
Installation of new sprinkler/standpipe systems as shown on plans in conjunction with NB job # 420666283
On file for this project
20 documents · 13 drawing sheets
Plumbing work as shown on plans in conjunction with NB job # 420666283. Work to include installation of plumbing fixtures and related piping for the entire building.
On file for this project
33 documents · 5 drawing sheets
Mechanical work as shown in plans in conjunction with NB filing job # 420666283 (filed to add additional equipment to the scope of work).
On file for this project
71 documents · 4 drawing sheets
Floor 77p · 2 filings · 20 docs
MechanicalPlumbingStructural
Plumbing work as shown on plans in conjunction with NB job # 420666283. Work to include installation of plumbing fixtures and related piping for the entire building.
On file for this project
33 documents · 5 drawing sheets
Mechanical work as shown in plans in conjunction with NB filing job # 420666283 (filed to add additional equipment to the scope of work).
On file for this project
71 documents · 3 drawing sheets
Floor 67p · 2 filings · 20 docs
MechanicalPlumbing
Plumbing work as shown on plans in conjunction with NB job # 420666283. Work to include installation of plumbing fixtures and related piping for the entire building.
On file for this project
33 documents · 4 drawing sheets
Mechanical work as shown in plans in conjunction with NB filing job # 420666283 (filed to add additional equipment to the scope of work).
On file for this project
71 documents · 3 drawing sheets
Floor 57p · 2 filings · 20 docs
MechanicalPlumbing
Plumbing work as shown on plans in conjunction with NB job # 420666283. Work to include installation of plumbing fixtures and related piping for the entire building.
On file for this project
33 documents · 5 drawing sheets
Mechanical work as shown in plans in conjunction with NB filing job # 420666283 (filed to add additional equipment to the scope of work).
On file for this project
71 documents · 3 drawing sheets
Floor 413p · 4 filings · 20 docs
ArchitectureLandscapeMechanicalPlumbingStructural
Plumbing work as shown on plans in conjunction with NB job # 420666283. Work to include installation of plumbing fixtures and related piping for the entire building.
On file for this project
33 documents · 5 drawing sheets
Filing for temporary sales office and model apartments to comply with BB 2010-002.
On file for this project
8 documents · 3 drawing sheets
Mechanical work as shown in plans in conjunction with NB filing job # 420666283 (filed to add additional equipment to the scope of work).
On file for this project
71 documents · 4 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 315p · 4 filings · 20 docs
ArchitectureCivilFire ProtectionMechanicalPlumbingStructural
Installation of new sprinkler/standpipe systems as shown on plans in conjunction with NB job # 420666283
On file for this project
20 documents · 6 drawing sheets
Plumbing work as shown on plans in conjunction with NB job # 420666283. Work to include installation of plumbing fixtures and related piping for the entire building.
On file for this project
33 documents · 5 drawing sheets
Mechanical work as shown in plans in conjunction with NB filing job # 420666283 (filed to add additional equipment to the scope of work).
On file for this project
71 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 219p · 6 filings · 20 docs
ArchitectureCivilFire ProtectionMechanicalPlumbingStructural
Installation of new sprinkler/standpipe systems as shown on plans in conjunction with NB job # 420666283
On file for this project
20 documents · 7 drawing sheets
Plumbing work as shown on plans in conjunction with NB job # 420666283. Work to include installation of plumbing fixtures and related piping for the entire building.
On file for this project
33 documents · 7 drawing sheets
Mechanical work as shown in plans in conjunction with NB filing job # 420666283 (filed to add additional equipment to the scope of work).
On file for this project
71 documents · 4 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 1Under Construction40p · 8 filings · 20 docs
ArchitectureCivilFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
PROPOSED PLUMBING WORK AT CELLAR AND FIRST FLOOR AS PER PLAN.NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
9 documents
NEW KITCHEN AND BATHROOM IN COMMERCIAL SPACE RETAIL D AS PER PLANS.
On file for this project
26 documents
BATHROOM FIT-OUT OF THE 1ST FLOOR COMMERCIAL SPACE SHOWN ON THE FLOOR PLANS. OCCUPANCY LOAD AND EGRESS TRAVEL IS REFLECTED/ FIELD UNDER THE NB APPLICATION #420666283. NO CHANGE TO OCCUPANCY, USE, AND EGRESS UNDER THIS APPLICATION.
On file for this project
7 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
CellarUnder Construction30p · 6 filings · 20 docs
ArchitectureCivilFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing
PROPOSED PLUMBING WORK AT CELLAR AND FIRST FLOOR AS PER PLAN.NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
9 documents
Installation of new sprinkler/standpipe systems as shown on plans in conjunction with NB job # 420666283
On file for this project
20 documents · 7 drawing sheets
Plumbing work as shown on plans in conjunction with NB job # 420666283. Work to include installation of plumbing fixtures and related piping for the entire building.
On file for this project
33 documents · 19 drawing sheets
Latest 3 of 6 filings on this floor.