← Back
Five to six families
72 1/2 IRVING PLACE
MANHATTAN · BIN 1017898
💬 Discuss this project
1866Year Built
5Stories
C2Building Class
R8BZoning
4,466 sfGross Floor Area
6Units
Rent Stabilized3 Open Violations ▸
Five to six families · Owner of record: 72 1/2 IRVING PLACE PROPERTIES LLC · 1,387 sf lot · 3.22 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
72 1/2 IRVING PLACE PROPERTIES LLC103/22/2026
72 1 2 IRVING PLACE203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.206/16/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P C403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BELL FUEL OIL, LLCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851206/16/2023
Building Lifecycle
All (23)Filed (2)Permit Issued (2)Signed Off (2)Violation (5)Inspection (2)Special Inspection (10)
04/29/2026
Violation issued (HPD, open)
A
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/04/2025
Violation issued (HPD, open)
A
01/05/2024
Signed off — Alteration
REPLACE METER BAR AND GAS PIPING TO REPLACEMENT GAS BOILER AND WATER HEATER. REGISTER WATER HEATER.
M00884514-I1
01/05/2024
Signed off — Alteration
REPLACE GAS BOILER.
M00884464-I1
11/13/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/29/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/28/2023
Permit issued — Plumbing
M00884514-I1-PL
06/27/2023
Permit issued — Boiler Equipment
M00884464-I1-BE
06/16/2023
Filed — Alteration
REPLACE METER BAR AND GAS PIPING TO REPLACEMENT GAS BOILER AND WATER HEATER. REGISTER WATER HEATER.
M00884514-I1
06/16/2023
Filed — Alteration
REPLACE GAS BOILER.
M00884464-I1
06/15/2023
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
06/15/2023
Special inspection requirement — Maintenance information
LOUIS ARENA
06/02/2023
Special inspection requirement — Heating Systems
LOUIS ARENA
06/02/2023
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
06/02/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
06/02/2023
Special inspection requirement — Maintenance information
LOUIS ARENA
06/02/2023
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
06/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
06/02/2023
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
06/02/2023
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
03/15/2023
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAPPROVED ENERGY LLC06/28/2023
DOB NOWBoiler EquipmentSigned-offAPPROVED ENERGY LLC06/27/2023
BISOTISSUEDINTERIOR RENOVATIONS01/29/2004
BISPLISSUEDRO-SAL PLUMBING & HTG INC INC.05/19/1998
BIS—ISSUEDVELEZ ORGANIZATION03/02/1998
BISPLISSUEDKAY MECHINICAL INC.09/15/1995
BISPLISSUEDALUMNI PLG & HTG CORP05/14/1993
BIS—ISSUEDVELEZ ORGANIZATION &CONST.INC03/24/1993
BISSPISSUEDDC BUILDING SERVICES INC12/16/1991
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/29/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
06/15/2023Energy Code Compliance InspectionsLOUIS ARENAprogress
06/15/2023Maintenance informationLOUIS ARENAenergy_progress
06/02/2023Heating SystemsLOUIS ARENAspecial
06/02/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
06/02/2023HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
06/02/2023Maintenance informationLOUIS ARENAenergy_progress
06/02/2023HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
06/02/2023Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
06/02/2023HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
06/02/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/30/2026M00884514-I1Request digital key ↗
08/30/2026M00884464-I1Request digital key ↗
▸Applications & Permits2
▸DOB NOWLPC Approval/Permit2
08/13/2026M00884464-I1Open ↗
08/13/2026M00884514-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026M00884464-I1Open ↗
08/27/2026M00884514-I1Open ↗
08/27/2026M00884514-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/30/2026M00884514-I1Open ↗
08/13/2026M00884464-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026M00884464-I1Open ↗
08/27/2026M00884514-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/30/2026M00884514-I1Open ↗
08/13/2026M00884464-I1Open ↗