Big box retail (e.g., Costco, BJs)
71-01 25 AVENUE
QUEENS · BIN 4307280
💬 Discuss this project
2001Year Built
2Stories
K8Building Class
M1-1Zoning
100,944 sfGross Floor Area
2Units
LL97 Covered1 Open Violation ▸FDNY Report ↗
Big box retail (e.g., Costco, BJs) · Owner of record: BCC II, LLC · 189,196 sf lot · 0.53 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 2 filings · 20 docs
Floor 1Under Construction33p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BDG CONSTRUCTION5607/08/2026
LAGUARDIA CORPORATE CENTER ASSOC103/21/2026
BDG GROUP503/21/2026
HOME DEPOT USA INC EXPO303/21/2026
BDL ASSET MANAGEMENT203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SAL FATEEN ENGINEERING105/07/2025
WD PARTNERS, INC.1603/21/2025
CCPE109/11/2024
F.P.VILLANO CONSULTING ENGINEER LLC107/20/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.3603/21/2026
LOUIS STRIAR203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
R.L. SPENCER, INCGeneral Contractor1107/08/2026
THE SET-UP GROUP, LLCGeneral Contractor303/21/2026
ABSOLUTE SPECIAL INSPTNPlumbing203/22/2026
ABSOLUTE SPECIAL INSPTNFire Protection107/08/2026
JUST PLUMBING INDUSTRIESPlumbing107/08/2026
SIGNSTAR NYCScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMARACON TESTING & INSPEC58421003/07/2025
Building Lifecycle
All (91)Filed (19)Permit Issued (11)Signed Off (9)Violation (4)Inspection (12)Objection (6)Special Inspection (30)
08/03/2026
Signed off — Alteration CO
FILING HEREWITH SPRINKLER WORK AS PER PLANS.
Q01083986-S1
09/26/2025
Signed off — Alteration
FILILING HEREWITH INSTALLATION OF GENERATOR.
Q01168630-I1
09/02/2025
Signed off — Alteration
FILING HEREWITH INSTALLATION OF RACKING SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01200693-I1
08/22/2025
Permit issued — General Construction
Q01200693-I1-GC
08/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/21/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/17/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/17/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/07/2025
Filed — Alteration
FILING HEREWITH INSTALLATION OF RACKING SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01200693-I1
04/07/2025
Signed off — Alteration CO
FILING HEREWITH SPRINKLER WORK AS PER PLANS.
Q01083986-S2
03/28/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/25/2025
Permit issued — Boiler Equipment
Q01168630-I1-BE
03/21/2025
Filed — Alteration CO
FILING HEREWITH SPRINKLER WORK AS PER PLANS.
Q01083986-P7
03/17/2025
Signed off — Alteration CO
FILING HEREWITH SPRINKLER WORK AS PER PLANS.
Q01083986-S3
03/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/07/2025
Filed — Alteration
FILILING HEREWITH INSTALLATION OF GENERATOR.
Q01168630-P1
03/07/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
CONNIE PISANI
03/05/2025
Signed off — Alteration
Q01021398-I1
03/05/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
CONNIE PISANI
03/04/2025
Signed off — Alteration CO
FILING HEREWITH SPRINKLER WORK AS PER PLANS.
Q01083986-S4
02/24/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
CONNIE PISANI
02/24/2025
Special inspection requirement — Fenestration areas
CONNIE PISANI
02/24/2025
Special inspection requirement — Air barrier - visual inspection
CONNIE PISANI
02/24/2025
Special inspection requirement — Fenestration air leakage
CONNIE PISANI
02/21/2025
Filed — Alteration CO
FILING HEREWITH SPRINKLER WORK AS PER PLANS.
Q01083986-P6
02/18/2025
Filed — Alteration CO
FILING HEREWITH SPRINKLER WORK AS PER PLANS.
Q01083986-P3
02/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
CONNIE PISANI
02/18/2025
Special inspection requirement — Structural Steel - Details
CONNIE PISANI
02/18/2025
Special inspection requirement — Concrete - Cast-In-Place
CONNIE PISANI
02/18/2025
Special inspection requirement — Final
CONNIE PISANI
02/13/2025
Filed — Alteration CO
FILING HEREWITH SPRINKLER WORK AS PER PLANS.
Q01083986-P4
02/13/2025
Filed — Alteration CO
FILING HEREWITH SPRINKLER WORK AS PER PLANS.
Q01083986-P5
02/13/2025
Filed — Alteration CO
FILING HEREWITH SPRINKLER WORK AS PER PLANS.
Q01083986-P2
02/13/2025
Special inspection requirement — Shutoff dampers
CONNIE PISANI
02/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
CONNIE PISANI
02/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
CONNIE PISANI
02/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
CONNIE PISANI
02/13/2025
Special inspection requirement — Final
CONNIE PISANI
02/13/2025
Special inspection requirement — Mechanical Systems
CONNIE PISANI
02/13/2025
Special inspection requirement — Emergency and Standby Power Systems (Generator)
CONNIE PISANI
02/13/2025
Special inspection requirement — Duct leakage testing, insulation and design
CONNIE PISANI
02/10/2025
Special inspection requirement — Emergency and Standby Power Systems (Generator)
CONNIE PISANI
02/05/2025
Special inspection requirement — Air barrier - visual inspection
CONNIE PISANI
02/05/2025
Special inspection requirement — Fenestration areas
CONNIE PISANI
02/05/2025
Special inspection requirement — Fenestration air leakage
CONNIE PISANI
02/05/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
CONNIE PISANI
02/04/2025
Permit issued — Boiler Equipment
Q01168630-I1-BE
01/28/2025
Special inspection requirement — Final
CONNIE PISANI
01/28/2025
Special inspection requirement — Structural Steel - Details
CONNIE PISANI
01/28/2025
Special inspection requirement — Concrete - Cast-In-Place
CONNIE PISANI
01/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
CONNIE PISANI
01/21/2025
Filed — Alteration
FILILING HEREWITH INSTALLATION OF GENERATOR.
Q01168630-I1
01/08/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
12/30/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/20/2024
Filed — Alteration CO
FILING HEREWITH SPRINKLER WORK AS PER PLANS.
Q01083986-P1
12/20/2024
Special inspection requirement — Subgrade Inspections
CONNIE PISANI
12/20/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
CONNIE PISANI
12/20/2024
Special inspection requirement — Structural Steel - High Strength Bolting
CONNIE PISANI
12/13/2024
Filed — Alteration
Q01021398-P1
11/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offTHE SET-UP GROUP, LLC08/22/2025
DOB NOWBoiler EquipmentSigned-offAMERICAN BOILER & WELDING03/25/2025
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC02/04/2025
DOB NOWGeneral ConstructionPermit IssuedR.L. SPENCER, INC09/27/2024
DOB NOWStructuralSigned-offR.L. SPENCER, INC09/27/2024
DOB NOWPlumbingSigned-offJUST PLUMBING INDUSTRIES09/20/2024
DOB NOWMechanical SystemsSigned-offR.L. SPENCER, INC09/17/2024
DOB NOWSprinklersSigned-offABSOLUTE SPECIAL INSPTN09/13/2024
DOB NOWStructuralSigned-offR.L. SPENCER, INC07/11/2024
DOB NOWGeneral ConstructionSigned-offR.L. SPENCER, INC06/30/2024
DOB NOWSignSigned-offSIGNSTAR NYC07/27/2021
BIS—ISSUEDTRU ART SIGN CO INC02/13/2004
BISPLISSUEDASA OF NEW YORK INC01/23/2004
BIS—ISSUEDTRU-ART SIGN CO INC01/06/2004
BISSPISSUEDPAR FIRE PROTECTION LLC09/26/2003
BISPLISSUEDASA OF NEW YORK INC09/16/2003
BIS—ISSUEDBLUMENFELD DEVELO.GROUP,LTD./BDG06/06/2003
BISEQISSUEDBLUMENFELD DEVELO.GROUP,LTD./BDG06/04/2003
BISEQISSUEDMILRIC CONST.12/31/2001
BISOTISSUEDMILRIC CONST.09/19/2001
BISEQISSUEDMILRIC CONST.09/19/2001
BISOTISSUEDMILRIC CONSTRUCTION CORP.09/19/2001
BISPLISSUEDECONOMY P & H CO.,INC08/03/2001
BISEQISSUEDMILRIC CONST.04/04/2001
BISEQISSUEDMILRIC CONSTRUCTION CORP.04/04/2001
BISOTISSUEDMILRIC CONST.04/04/2001
BISOTISSUEDMILRIC CONSTRUCTION CORP.04/04/2001
1 project · most recent 03/21/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/21/2025Signed-offR.L. SPENCER, INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lennox LGH300U4 25 tons · Rooftop Unit ×4
LCH240U4 20 tons · Rooftop Unit ×2
LCH300U4 25 tons · Rooftop Unit ×2
LCM060U4E 5 tons · Rooftop Unit ×2
LGM092U4E 8 tons · Rooftop Unit ×2
Ventilation
N/A N/A 1,300 CFM · Exhaust Fan ×1
1 project · most recent 03/21/2025
Gas Water/Sanitary
FiledStatusContractorScope
03/21/2025Signed-offJUST PLUMBING INDUSTRIESGas, Water/Sanitary
1 project · most recent 01/06/2025
General Wiring
FiledStatusContractorScope
01/06/2025CompleteNOVA ELECTRIC LLCGeneral Wiring
1 project · most recent 03/21/2025
Steel Concrete
FiledStatusContractorScope
03/21/2025Signed-offR.L. SPENCER, INCSteel, Concrete
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
08/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/21/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/28/2025Pass-Final Boiler Equipment InspectionPassView ↗
03/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/08/2025Pass-Final PL - UndergroundPassView ↗
12/30/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/12/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/11/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 63
DateRequirementInspectorRole
03/07/2025Fuel-Oil Storage and Fuel-Oil Piping SystemsCONNIE PISANIspecial
03/05/2025Fuel-Oil Storage and Fuel-Oil Piping SystemsCONNIE PISANIspecial
02/24/2025Fenestration air leakageCONNIE PISANIenergy_progress
02/24/2025Fenestration and door U-factor and product ratingsCONNIE PISANIenergy_progress
02/24/2025Air barrier - visual inspectionCONNIE PISANIenergy_progress
02/24/2025Fenestration areasCONNIE PISANIenergy_progress
02/18/2025Structural Steel - DetailsCONNIE PISANIspecial
02/18/2025Concrete - Cast-In-PlaceCONNIE PISANIspecial
02/18/2025FinalCONNIE PISANIprogress
02/18/2025Structural Stability – Alterations of existing buildingsCONNIE PISANIspecial
02/13/2025Duct leakage testing, insulation and designCONNIE PISANIenergy_progress
02/13/2025Shutoff dampersCONNIE PISANIenergy_progress
02/13/2025HVAC-R and service water piping design and insulationCONNIE PISANIenergy_progress
02/13/2025HVAC-R and service water heating equipmentCONNIE PISANIenergy_progress
02/13/2025HVAC-R and service water heating system controlsCONNIE PISANIenergy_progress
02/13/2025Emergency and Standby Power Systems (Generator)CONNIE PISANIspecial
02/13/2025Mechanical SystemsCONNIE PISANIspecial
02/13/2025FinalCONNIE PISANIprogress
02/10/2025Emergency and Standby Power Systems (Generator)CONNIE PISANIspecial
02/05/2025Fenestration and door U-factor and product ratingsCONNIE PISANIenergy_progress
02/05/2025Fenestration air leakageCONNIE PISANIenergy_progress
02/05/2025Fenestration areasCONNIE PISANIenergy_progress
02/05/2025Air barrier - visual inspectionCONNIE PISANIenergy_progress
01/28/2025Structural Steel - DetailsCONNIE PISANIspecial
01/28/2025Structural Stability – Alterations of existing buildingsCONNIE PISANIspecial
Latest 25 of 63.
▾Documents — 81 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/27/2026Q00551500-I1Request digital key ↗
08/23/2026Q01008372-I1Request digital key ↗
08/22/2026Q01021398-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
01/08/2013420788099Open ↗
▸Seals & Professional Certifications46
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/22/2026Q01021398-P1Open ↗
08/22/2026Q01021398-I1Open ↗
08/21/2026Q01168630-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/28/2026Q01083986-P2Open ↗
09/23/2026Q01168630-I1Open ↗
09/01/2026Q01021398-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/29/2026Q00551500-I1Open ↗
09/28/2026Q01083986-P2Open ↗
09/28/2026Q01083986-P2Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/08/2013420788099Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026Q01083986-I1Open ↗
08/13/2026Q01083986-P4Open ↗
08/13/2026Q01083986-P1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
01/08/2013420788099Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/08/2013420788099Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/21/2026Q01083986-S1Open ↗
▸Inspections & Test Reports1
▸DOB NOWTR5 Test Report1
08/13/2026Q01021398-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
01/08/2013420788099Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
01/08/2013420788099Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
01/08/2013420788099Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification3
08/13/2026Q01083986-P4Open ↗
08/13/2026Q01083986-P1Open ↗
08/13/2026Q01083986-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice2
08/13/2026Q01021398-I1Open ↗
08/13/2026Q01008372-I1Open ↗