← Back
Two family converted from one family
72-16 45 AVENUE
QUEENS · BIN 4031996
💬 Discuss this project
1901Year Built
2Stories
B3Building Class
R5Zoning
1,408 sfGross Floor Area
2Units
0 Open Violations
Two family converted from one family · 1,815 sf lot · 0.78 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 14p · 1 filing · 20 docs
Cellar8p · 2 filings · 20 docs
Basement4p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/05/2023$710K—— → —$504/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEI ARCHITECT PLLC304/02/2025
HAYM S. GROSS, ARCHITECT308/30/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BRITZ ENTERPRISES INC.603/21/2026
ALPHA HOME DESIGN LLC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&L CONSTRUCTION DEVELOPGeneral Contractor303/21/2026
CL ELECTRICAL CORPElectrical103/22/2026
BIG APPLE PLBG & HTG CO IPlumbing107/08/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEHDI GHAZI, P.E. P.C.7129304/02/2025
RIKE TECH ASSOCIATES LLC2965308/30/2023
Building Lifecycle
All (48)Filed (6)Permit Issued (3)Signed Off (3)Violation (2)Inspection (11)Objection (4)Special Inspection (19)
10/01/2025
Signed off — Alteration CO
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01011526-I1
09/26/2025
Signed off — Alteration
REPLACE OIL BOILER WITH 1 GAS BOILER & HWH. CONNECT TO EXISTING CHIMNEY. RUN APPROX 30'X1" GAS PIPING. GAS CARD NEEDED. 1 AO SMITH XCV50200 MEA#376-04E 40,000BTU's & 1 BURNHAM MEA #154-93E SIN4LNILE2 INPUT BTU:105,000, OUTPUT BTU:87,000 @ cellar;
Q00850719-I1
08/14/2025
Signed off — Alteration CO
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01011526-S2
07/22/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/07/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/18/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/18/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/18/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/16/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/14/2025
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
04/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
04/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
04/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
04/14/2025
Special inspection requirement — Maintenance information
MEHDI GHAZI
04/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
04/02/2025
Filed — Alteration CO
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01011526-P1
04/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
04/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
04/02/2025
Special inspection requirement — Maintenance information
MEHDI GHAZI
04/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
04/02/2025
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
04/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
11/21/2024
Permit issued — Plumbing
Q01011526-S2-PL
11/14/2024
Permit issued — General Construction
Q01011526-I1-GC
08/14/2024
Objection resolved — Addressed
08/07/2024
Objection resolved — Addressed
07/24/2024
Objection raised — Zoning
07/24/2024
Objection raised — Mechanical
07/12/2024
Filed — Alteration CO
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01011526-S2
04/02/2024
Violation issued (ECB, closed)
Construction
03/01/2024
Filed — Alteration CO
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01011526-I1
02/27/2024
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
02/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
02/27/2024
Special inspection requirement — Fire-Resistance Rated Construction
MEHDI GHAZI
02/27/2024
Special inspection requirement — Interior lighting power
MEHDI GHAZI
02/27/2024
Special inspection requirement — Metering
MEHDI GHAZI
11/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/26/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/22/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/14/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/11/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYED RIZVI
08/30/2023
Filed — Alteration
REPLACE OIL BOILER WITH 1 GAS BOILER & HWH. CONNECT TO EXISTING CHIMNEY. RUN APPROX 30'X1" GAS PIPING. GAS CARD NEEDED. 1 AO SMITH XCV50200 MEA#376-04E 40,000BTU's & 1 BURNHAM MEA #154-93E SIN4LNILE2 INPUT BTU:105,000, OUTPUT BTU:87,000 @ cellar;
Q00850719-P2
08/21/2023
Filed — Alteration
REPLACE OIL BOILER WITH 1 GAS BOILER & HWH. CONNECT TO EXISTING CHIMNEY. RUN APPROX 30'X1" GAS PIPING. GAS CARD NEEDED. 1 AO SMITH XCV50200 MEA#376-04E 40,000BTU's & 1 BURNHAM MEA #154-93E SIN4LNILE2 INPUT BTU:105,000, OUTPUT BTU:87,000 @ cellar;
Q00850719-P1
08/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYED RIZVI
08/09/2023
Permit issued — Plumbing
Q00850719-I1-PL
03/28/2023
Filed — Alteration
REPLACE OIL BOILER WITH 1 GAS BOILER & HWH. CONNECT TO EXISTING CHIMNEY. RUN APPROX 30'X1" GAS PIPING. GAS CARD NEEDED. 1 AO SMITH XCV50200 MEA#376-04E 40,000BTU's & 1 BURNHAM MEA #154-93E SIN4LNILE2 INPUT BTU:105,000, OUTPUT BTU:87,000 @ cellar;
Q00850719-I1
06/10/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC11/21/2024
DOB NOWGeneral ConstructionPermit IssuedL&L CONSTRUCTION DEVELOP11/14/2024
DOB NOWPlumbingSigned-offBIG APPLE PLBG & HTG CO I08/09/2023
1 project · most recent 04/02/2025
Gas Water/Sanitary
FiledStatusContractorScope
04/02/2025Signed-offROCK E SMALL PLBG&HTG INCGas, Water/Sanitary
3 projects · most recent 07/09/2025
General Wiring
FiledStatusContractorScope
07/09/2025CompleteCL ELECTRICAL CORPGeneral Wiring
12/08/2024CompleteCL ELECTRICAL CORPGeneral Wiring
08/29/2023CompleteYORK ELEC'L CONTR'S INC.—
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
07/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/07/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/18/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/18/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/16/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/26/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/14/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/11/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/10/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
04/14/2025Energy Code Compliance InspectionsMEHDI GHAZIprogress
04/14/2025HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
04/14/2025HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
04/14/2025HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
04/14/2025Maintenance informationMEHDI GHAZIenergy_progress
04/14/2025Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
04/02/2025HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
04/02/2025HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
04/02/2025Maintenance informationMEHDI GHAZIenergy_progress
04/02/2025Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
04/02/2025Energy Code Compliance InspectionsMEHDI GHAZIprogress
04/02/2025HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
02/27/2024Energy Code Compliance InspectionsMEHDI GHAZIprogress
02/27/2024Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
02/27/2024Fire-Resistance Rated ConstructionMEHDI GHAZIprogress
02/27/2024Interior lighting powerMEHDI GHAZIenergy_progress
02/27/2024MeteringMEHDI GHAZIenergy_progress
08/31/2023Fire-Resistant Penetrations and JointsSYED RIZVIspecial
08/11/2023Fire-Resistant Penetrations and JointsSYED RIZVIspecial
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026Q00850719-P2Request digital key ↗
08/25/2026Q00850719-P1Request digital key ↗
08/25/2026Q00850719-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01011526-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/20/2026Q01011526-S2Open ↗
08/13/2026Q00850719-P2Open ↗
08/13/2026Q00850719-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/30/2026Q01011526-I1Open ↗
08/30/2026Q01011526-I1Open ↗
08/29/2026Q01011526-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/30/2026Q01011526-I1Open ↗
08/29/2026Q01011526-P1Open ↗
08/26/2026Q00850719-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01011526-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026Q01011526-S2Open ↗
08/13/2026Q01011526-P1Open ↗
08/13/2026Q01011526-I1Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification1
08/13/2026Q01011526-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01011526-I1Open ↗