← Back
Three families
72-22 BURCHELL AVENUE
QUEENS · Rockaway Beach-Arverne-Edgemere · BIN 4303184
💬 Discuss this project
1915Year Built
2.75Stories
C0Building Class
R4AZoning
2,648 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · Owner of record: BRONX IN.VESTMENT GROUP I INC. · 3,000 sf lot · 0.88 FAR built · Flood zone AE
Locations of Work
Architecture
Floor 11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRONX IN.VESTMENT GROUP I INC.1103/22/2026
BRONX INVESTMENT GROUP 1 INC.503/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/09/2016$190K—CAMMANS POND REALTY INC. → BRONX IN.VESTMENT GROUP I INC.$72/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SION CONSULTING ENGINEERING PC211/27/2023
JAHMAL SABAHA PE CONSULTING ENGR103/02/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SION CONSULTING ENGINEERING P C403/21/2026
KMS DRAFTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLUMB-IT MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SION CONSULTING ENG. PC1108211/27/2023
AA BUILDING & INSPECTION1519103/02/2022
Building Lifecycle
All (79)Filed (3)Permit Issued (1)Signed Off (1)Violation (52)Inspection (5)Special Inspection (17)
03/06/2026
Violation issued (HPD, closed)
C
02/29/2024
Violation issued (HPD, closed)
C
02/29/2024
Violation issued (HPD, closed)
C
01/16/2024
Signed off — Alteration
THIS APPLIACATION FILED TO REMOVE THE BOILER ROOM FROM THE CELLAR AND INSTALL 2 NEW COMBI BOILER ON THE FIRST FLOOR
Q00676452-S1
12/14/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/13/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/13/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/07/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
sion hourizadeh
12/07/2023
Special inspection requirement — Maintenance information
sion hourizadeh
12/07/2023
Special inspection requirement — HVAC-R and service water heating equipment
sion hourizadeh
12/07/2023
Special inspection requirement — HVAC-R and service water heating system controls
sion hourizadeh
12/07/2023
Special inspection requirement — Energy Code Compliance Inspections
sion hourizadeh
12/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
sion hourizadeh
11/27/2023
Filed — Alteration
THIS APPLIACATION FILED TO REMOVE THE BOILER ROOM FROM THE CELLAR AND INSTALL 2 NEW COMBI BOILER ON THE FIRST FLOOR
Q00676452-P1
11/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
sion hourizadeh
11/24/2023
Special inspection requirement — Energy Code Compliance Inspections
sion hourizadeh
11/24/2023
Special inspection requirement — HVAC-R and service water heating system controls
sion hourizadeh
11/24/2023
Special inspection requirement — Maintenance information
sion hourizadeh
11/24/2023
Special inspection requirement — HVAC-R and service water heating equipment
sion hourizadeh
11/24/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
sion hourizadeh
11/16/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/20/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/06/2023
Permit issued — Plumbing
Q00676452-S1-PL
06/13/2023
Filed — Alteration
THIS APPLIACATION FILED TO REMOVE THE BOILER ROOM FROM THE CELLAR AND INSTALL 2 NEW COMBI BOILER ON THE FIRST FLOOR
Q00676452-S1
03/29/2023
Violation issued (HPD, closed)
A
02/09/2023
Violation issued (HPD, closed)
C
02/09/2023
Violation issued (HPD, closed)
B
02/09/2023
Violation issued (HPD, closed)
B
02/09/2023
Violation issued (HPD, closed)
B
11/16/2022
Violation issued (HPD, closed)
I
09/13/2022
Violation issued (HPD, closed)
C
09/13/2022
Violation issued (HPD, closed)
C
09/13/2022
Violation issued (HPD, closed)
B
09/13/2022
Violation issued (HPD, closed)
A
09/13/2022
Violation issued (HPD, closed)
A
09/13/2022
Violation issued (HPD, closed)
B
09/13/2022
Violation issued (HPD, closed)
A
09/13/2022
Violation issued (HPD, closed)
B
09/13/2022
Violation issued (HPD, closed)
B
09/13/2022
Violation issued (HPD, closed)
A
09/13/2022
Violation issued (HPD, closed)
C
09/13/2022
Violation issued (HPD, closed)
A
09/13/2022
Violation issued (HPD, closed)
C
09/13/2022
Violation issued (HPD, closed)
A
09/13/2022
Violation issued (HPD, closed)
B
09/13/2022
Violation issued (HPD, closed)
A
03/04/2022
Violation issued (HPD, closed)
A
03/04/2022
Violation issued (HPD, closed)
I
03/02/2022
Filed — Alteration
THIS APPLIACATION FILED TO REMOVE THE BOILER ROOM FROM THE CELLAR AND INSTALL 2 NEW COMBI BOILER ON THE FIRST FLOOR
Q00676452-I1
03/02/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
03/02/2022
Special inspection requirement — Maintenance information
Younes Abouyaala
03/02/2022
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
03/02/2022
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
03/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/10/2021
Violation issued (ECB, closed)
Construction
04/15/2021
Violation issued (HPD, closed)
A
01/14/2021
Violation issued (ECB, closed)
Construction
02/29/2020
Violation issued (ECB, closed)
Construction
12/28/2019
Violation issued (ECB, closed)
Construction
11/01/2019
Violation issued (HPD, closed)
I
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC10/06/2023
BISOTISSUEDJ&J DESIGNS INC09/27/2023
BISOTISSUEDJ&J DESIGNS INC08/08/2023
BISOTISSUEDRAE MGMT INC06/02/2022
1 project · most recent 11/27/2023
Gas Water/Sanitary
FiledStatusContractorScope
11/27/2023Signed-offJVR PLBG AND HEATING INCGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/13/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/20/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
12/07/2023HVAC-R and service water piping design and insulationsion hourizadehenergy_progress
12/07/2023Maintenance informationsion hourizadehenergy_progress
12/07/2023HVAC-R and service water heating equipmentsion hourizadehenergy_progress
12/07/2023HVAC-R and service water heating system controlssion hourizadehenergy_progress
12/07/2023Energy Code Compliance Inspectionssion hourizadehprogress
12/07/2023Fire-Resistant Penetrations and Jointssion hourizadehspecial
11/24/2023Fire-Resistant Penetrations and Jointssion hourizadehspecial
11/24/2023Energy Code Compliance Inspectionssion hourizadehprogress
11/24/2023HVAC-R and service water heating system controlssion hourizadehenergy_progress
11/24/2023Maintenance informationsion hourizadehenergy_progress
11/24/2023HVAC-R and service water heating equipmentsion hourizadehenergy_progress
11/24/2023HVAC-R and service water piping design and insulationsion hourizadehenergy_progress
03/02/2022HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
03/02/2022Maintenance informationYounes Abouyaalaenergy_progress
03/02/2022HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
03/02/2022HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
03/02/2022Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
▾Documents — 79 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026Q00676452-S1Request digital key ↗
08/26/2026Q00676452-I1Request digital key ↗
08/26/2026Q00676452-P1Request digital key ↗
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION8
11/02/2023440655471Open ↗
04/24/2023440655471Open ↗
09/30/2021440655471Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION4
12/20/2023440655471Open ↗
11/01/2023440655471Open ↗
09/14/2023440655471Open ↗
Showing 3 of 4 on file for this type
▸BISLL104/19 REQUEST FOR EXECEPTION TO PERMIT RESTRICTION1
03/13/2024440655471Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISFLOOD ZONE COMPLIANCE1
01/12/2024440655471Open ↗
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature11
09/25/2026Q00676452-S1Open ↗
09/25/2026Q00676452-S1Open ↗
09/25/2026Q00676452-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026Q00676452-S1Open ↗
08/13/2026Q00676452-P1Open ↗
08/13/2026Q00676452-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/25/2026Q00676452-S1Open ↗
08/26/2026Q00676452-P1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/30/2021440655471Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/30/2021440655471Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
11/06/2019421909331Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
09/30/2021440655471Open ↗
11/06/2019421909331Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
09/30/2021440655471Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026Q00676452-I1Open ↗
08/13/2026Q00676452-P1Open ↗
08/13/2026Q00676452-S1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
09/30/2021440655471Open ↗
11/06/2019421909331Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
05/29/2024440655471Open ↗
06/01/2023440655471Open ↗
04/11/2022440655471Open ↗
Showing 3 of 5 on file for this type
▸BISNYCECC ANALYSIS1
12/23/2021440655471Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/29/2024440655471Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/12/2024440655471Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/06/2019421909331Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/30/2021440655471Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY5
01/12/2024440655471Open ↗
06/01/2023440655471Open ↗
04/11/2022440655471Open ↗
Showing 3 of 5 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/12/2024440655471Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/12/2024440655471Open ↗
▸BISMASONRY1
01/12/2024440655471Open ↗
▸Approvals, Objections & Sign-offs3
▸BISSUPERSEDING LETTER2
11/01/2023440655471Open ↗
11/01/2023440655471Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/30/2024440655471Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
09/30/2021440655471Open ↗
11/06/2019421909331Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/12/2024440655471Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION3
05/30/2024440655471Open ↗
11/08/2023440655471Open ↗
06/05/2023440655471Open ↗
▸BISBOROUGH INTAKE FORM3
12/20/2023440655471Open ↗
11/01/2023440655471Open ↗
12/17/2020421909331Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/30/2021440655471Open ↗
▸BISEFILING COVER SHEET1
11/06/2019421909331Open ↗
▸Other Documents3
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
03/21/2024440655471Open ↗
05/18/2022440655471Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
05/30/2024440655471Open ↗