← Back
BuildNYC
One story - permanent living quarter
72-25 PARK DRIVE EAST
QUEENS · BIN 4142275
💬 Discuss this project
1960Year Built
1Stories
A2Building Class
R2XZoning
1,650 sfGross Floor Area
1Units
4 Active Violations ▸FDNY Report ↗
One story - permanent living quarter · 5,900 sf lot · 0.28 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 20 docs
AtticUnder Construction19p · 1 filing · 20 docs
Floor 2Under Construction20p · 1 filing · 20 docs
Floor 1Under Construction21p · 1 filing · 20 docs
CellarUnder Construction20p · 1 filing · 20 docs
Site & exteriorUnder Construction39p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/24/2025$1.9M—Private party → Private party$1,152/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Gerald Caliendo Architects602/25/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Dmconsulting68601203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EJ Homes 45General Contractor407/08/2026
EJ Homes 45Scaffold105/15/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616502/25/2026
Building Lifecycle
08/25/2026
3307.2.1 at inspection of a proposed two-story building, an excavator was observed on site. Upon request, no permit for sidewalk crossing with…
ECB violation · open
08/25/2026
At inspection of a 2-story building at excavation phase, a 10-ft-deep excavation was observed without required protection, piling, or lagging,…
ECB violation · open
08/25/2026
At inspection of a proposed 2-story building at excavation, an 8-ft-deep excavation was observed at exp# 1 without a required guardrail system,…
ECB violation · open
08/25/2026
At inspection of a proposed 2-story building in excavation, exp# 2 was observed with a 10-ft-deep excavation lacking required piling and lagging.…
ECB violation · open
06/04/2026
Permit issued — Structural
Q01321104-S5-ST
54 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedEJ Homes 4506/04/2026
DOB NOWEarth WorkPermit IssuedEJ Homes 4506/04/2026
DOB NOWSupport of ExcavationPermit IssuedEJ Homes 4506/03/2026
DOB NOWMechanical SystemsPermit IssuedEJ Homes 4506/03/2026
DOB NOWConstruction FencePermit IssuedEJ Homes 4505/13/2026
1 project · most recent 02/25/2026
Heating Systems Ventilation Systems
FiledStatusContractorScope
02/25/2026Permit IssuedEJ Homes 45Heating Systems, Ventilation Systems
1 project · most recent 02/25/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/25/2026——Gas, Storm, Water/Sanitary
1 project · most recent 06/10/2026
General Wiring
FiledStatusContractorScope
06/10/2026Permit IssuedWCK ElectricGeneral Wiring
1 project · most recent 02/25/2026
FiledStatusContractorScope
02/25/2026Permit IssuedEJ Homes 45—
1 project · most recent 02/25/2026
Fence
FiledStatusContractorScope
02/25/2026Permit IssuedEJ Homes 45Fence
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
02/10/2026Concrete - Cast-In-PlaceSHAHRIAR QUAYYUMspecial
02/10/2026Concrete - Cast-In-PlaceSHAHRIAR QUAYYUMspecial
02/10/2026Excavations - Sheeting, Shoring, and BracingSHAHRIAR QUAYYUMspecial
01/12/2026Structural Stability – Alterations of existing buildingsSHAHRIAR QUAYYUMspecial
01/12/2026Structural Stability – Alterations of existing buildingsSHAHRIAR QUAYYUMspecial
01/05/2026FinalSHAHRIAR QUAYYUMprogress
01/05/2026Footing and FoundationJEFFREY BELLprogress
12/15/2025HVAC-R and service water heating equipmentJEFFREY BELLenergy_progress
12/15/2025Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
12/15/2025HVAC-R and service water piping design and insulationJEFFREY BELLenergy_progress
12/15/2025Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
12/15/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesSHAHRIAR QUAYYUMspecial
12/15/2025Energy Code Compliance InspectionsJEFFREY BELLprogress
12/15/2025Maintenance informationJEFFREY BELLenergy_progress
12/15/2025Permanent certificateJEFFREY BELLenergy_progress
12/15/2025HVAC-R and service water heating system controlsJEFFREY BELLenergy_progress
11/18/2025Maintenance informationJEFFREY BELLenergy_progress
11/18/2025HVAC-R and service water piping design and insulationJEFFREY BELLenergy_progress
11/18/2025HVAC-R and service water heating equipmentJEFFREY BELLenergy_progress
11/18/2025Ventilation and air distribution systemJEFFREY BELLenergy_progress
11/18/2025Protection of exposed foundation insulationJEFFREY BELLenergy_progress
11/18/2025Electric vehicle service equipment requirementsJEFFREY BELLenergy_progress
11/18/2025Exterior lighting powerJEFFREY BELLenergy_progress
11/18/2025Fenestration areasJEFFREY BELLenergy_progress
11/18/2025Fenestration air leakageJEFFREY BELLenergy_progress
Latest 25 of 46.
44 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account