ECB11/01/2022TIME OF INSPECTION AT 2 STORY ALTERATION SITE, I OBSERVED CONSTRUCTION PLYWOOD FENCE AND SIDEWALK SHED EXPO 1 AND 3 ON SITE/ INPLACE DURING ACTIVE PUBLIC SIDEWALK WITH PERMITS EXPIRED. UPON MY REVIEW ON BIS AND$1K due
ECB11/01/2022TIME OF INSPECTION AT 2 STORY ALTERATION SITE, I OBSERVED CONSTRUCTION PLYWOOD FENCE NOT MAINTAINED TO CODE/ SUBSECTION ( MASSIVE AMOUNT OF GRAFFITI AND ADS/POSTINGS, PLYWOOD FENCE FALLING APART & VIEWING PANEL$1K due
ECB11/04/2022SIDEWALK SHED LIGHTING BC3307.6.4.8@2 STORY INCOMPLETE ALT1 SITE EXPIRED PERMIT 9.7.22+NOT SIGNED OFF IN DOB RECORDS+DEMO AFFECT EXTERIOR I OBSERVE PEDESTRIAN PROTECTION SIDEWALK SHED IN PLACE UNDERSIDE DARK PANothing owed — awaiting certificate of correction
ECB09/29/2020FAILURE TO COMPLY WITH MANUFACTURER SPECIFICATIONS AT THE TIME OF MY INSPECTION I OBSERVED AN ACTIVE PROJECT WITH PERSONNEL ENGAGED IN DEMO OPERATIONS UTILIZING SUPPORTED SCAFFOLD THAT HAD BEEN ERECTED IN SEPERNothing owed — awaiting certificate of correction
ECB09/29/2020WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS.AT THE TIME OF MY INSPECTION OF AN ACTIVE 2 STORY PROJECT WHERE PERSONNEL WAS ENGAGED IN DEMO OPERATIONS,I OBSERVED SHORING THNothing owed — awaiting certificate of correction
ECB09/29/2020FAILURE TO FILE EVIDENCE OF COMPLIANCE WITH WORKERS COMP LAW AND/OR DISABILITY BENEFITS LAW.AT THE TIME OF MY INSPECTION I OBSERVED AN ACTIVE PROJECT WITH APPROX(5)MEN PERFORMING DEMO OPERATIONS.UPON RESEARCHINNothing owed — awaiting certificate of correction
ECB09/29/2020FAILURE TO MAINTAIN/DISPLAY ONSITE DOCUMENTS REQUIRED BY BC CHAPTER 33AT THE TIME OF INSPECITON,I OBSERVED AN ACTIVE PROJECT WHERE PERSONNELWAS ENGAGED IN DEMO OPERATIONS IN THE SAME BUILDING WHERE A BANK WAS MNothing owed — awaiting certificate of correction
Office only, 2-6 stories · Owner of record: DA BRONX LLC · 20,665 sf lot · 0.63 FAR built · Flood zone X