← Back
BuildNYC
Two family frame
72-36 243RD STREET
QUEENS · BIN 4172719
💬 Discuss this project
1950Year Built
2Stories
B2Building Class
R4-1Zoning
2,444 sfGross Floor Area
2Units
Two family frame · 2,553 sf lot · 0.96 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPhotovoltaic solar electric generation array installation1p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Momentum Solar109/16/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
G & R Electl ContractorsElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV Sia9281109/16/2026
Building Lifecycle
09/30/2026
Permit expired, never signed off — Solar
The city's record still shows this permit as issued, with no sign-off on its filing
Q01460846-I1-SL
09/23/2026
Permit issued — Solar
Q01460846-I1-SL
09/16/2026
Filed — Alteration
Installation of solar panels, Roof Top, Grid Tied, railed, (30) Modules, (12.3) kW System Size
Q01460846-I1
09/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
09/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
8 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedMomentum Solar09/23/2026
2 projects · most recent 09/16/2026
General Wiring
FiledStatusContractorScope
09/16/2026Permit IssuedIsland Electric—
03/08/2022CompleteG & R Electl ContractorsGeneral Wiring
1 project · most recent 09/16/2026
FiledStatusContractorScope
09/16/2026Permit IssuedMomentum Solar—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/16/2026Fire-Resistant Penetrations and JointsMina Makarspecial
09/16/2026Structural Stability – Alterations of existing buildingsMina Makarspecial
09/16/2026Energy Code Compliance InspectionsMina Makarprogress
09/16/2026FinalMina Makarprogress
09/16/2026Air barrier - visual inspectionMina Makarenergy_progress
6 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account