← Back
Three families
72-38 CALDWELL AVENUE
QUEENS · Maspeth · BIN 4063850
💬 Discuss this project
1955Year Built
3Stories
C0Building Class
R4Zoning
3,036 sfGross Floor Area
3Units
Rent Stabilized9 Open Violations ▸
Three families · Owner of record: 75-38 CALDWELL AVENUE, LLC · 2,200 sf lot · 1.38 FAR built · Flood zone X
Locations of Work
PlumbingFire Protection
Floor 31p · 1 filing · 4 docs
Floor 21p · 1 filing · 4 docs
Floor 13p · 2 filings · 11 docs
Cellar2p · 2 filings · 11 docs
Site & exterior1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CORATO1 PIZZA RESTAURANT507/08/2026
75-38 CALDWELL AVENUE, LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AUTOMATED DESIGN ENGINEERING, PLLC101/27/2020
CD ARCHITECT STUDIO, LLP101/13/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CD ARCHITECT STUDIO203/21/2026
NOEL BUILDING CONSULTING INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW ERA MECH SERVICE INCFire Protection107/08/2026
NEW ERA MECHANICAL SER INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AUTOMATED DESIGN CONSULTA895101/27/2020
CD ARCHITECT STUDIO, LLP2573101/13/2020
Building Lifecycle
All (27)Filed (2)Permit Issued (2)Signed Off (2)Violation (16)Special Inspection (5)
04/15/2024
Violation issued (HPD, closed)
A
03/29/2023
Violation issued (HPD, closed)
A
03/04/2022
Violation issued (HPD, closed)
A
12/01/2021
Violation issued (HPD, open)
B
12/01/2021
Violation issued (HPD, open)
B
12/01/2021
Violation issued (HPD, open)
B
12/01/2021
Violation issued (HPD, open)
B
08/02/2021
Violation issued (HPD, open)
B
08/02/2021
Violation issued (HPD, closed)
C
08/02/2021
Violation issued (HPD, open)
B
08/02/2021
Violation issued (HPD, open)
B
08/02/2021
Violation issued (HPD, open)
B
08/02/2021
Violation issued (HPD, open)
B
08/02/2021
Violation issued (HPD, closed)
B
08/02/2021
Violation issued (HPD, closed)
C
08/02/2021
Violation issued (HPD, closed)
B
04/08/2021
Signed off — Alteration
Install sprinkler system per the plans filed herewith and in conjunction with NB#421797256. The system is hydraulically calculated. There is no change in use occupancy or egress.
Q00295136-I1
01/25/2021
Signed off — Alteration
REPLACE EXISTING BATHROOMS FIXTURES WITH NEW FIXTURES, NEW KITCHEN SINK AND GAS RANGE AT FIRST FLOOR AND INSTALL ONE ADDITIONAL GAS METER IN THE CELLAR AS PER PLANS SUBMITTED HERETO.
Q00250507-I1
08/26/2020
Permit issued — Plumbing
Q00250507-I1-PL
08/21/2020
Permit issued — Sprinklers
Q00295136-I1-EW-SP
01/27/2020
Filed — Alteration
Install sprinkler system per the plans filed herewith and in conjunction with NB#421797256. The system is hydraulically calculated. There is no change in use occupancy or egress.
Q00295136-I1
01/13/2020
Filed — Alteration
REPLACE EXISTING BATHROOMS FIXTURES WITH NEW FIXTURES, NEW KITCHEN SINK AND GAS RANGE AT FIRST FLOOR AND INSTALL ONE ADDITIONAL GAS METER IN THE CELLAR AS PER PLANS SUBMITTED HERETO.
Q00250507-I1
01/13/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Peter D'Angelo
01/13/2020
Special inspection requirement — Energy Code Compliance Inspections
Peter D'Angelo
01/10/2020
Special inspection requirement — Sprinkler Systems
Gregory Mortman
11/04/2019
Special inspection requirement — HVAC and service water heating equipment
Peter D'Angelo
11/04/2019
Special inspection requirement — HVAC and service water heating system controls
Peter D'Angelo
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offNEW ERA MECHANICAL SER IN08/26/2020
DOB NOWSprinklersSigned-offNEW ERA MECH SERVICE INC08/21/2020
BIS—ISSUEDNARULA DEVELOPMENT CORP08/13/2020
1 project · most recent 08/07/2020
General Wiring
FiledStatusContractorScope
08/07/2020CompleteERIC & NG ELEC'L, INC.General Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/13/2020Fire-Resistant Penetrations and JointsPeter D'Angelospecial
01/13/2020Energy Code Compliance InspectionsPeter D'Angeloprogress
01/10/2020Sprinkler SystemsGregory Mortmanspecial
11/04/2019HVAC and service water heating equipment Peter D'Angeloenergy_progress
11/04/2019HVAC and service water heating system controls Peter D'Angeloenergy_progress
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Plumbing1
08/28/2026Q00250507-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/28/2026Q00295136-I1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
01/23/2020421797256Open ↗
01/21/2020421797256Open ↗
01/14/2020421797256Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/18/2020421797256Open ↗
▸BISWORK PERMIT APPLICATION1
08/13/2020421797256Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
04/28/2021421797256Open ↗
▸BISVERIFY TAX LOT1
01/26/2021421797256Open ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026Q00250507-I1Open ↗
08/29/2026Q00250507-I1Open ↗
08/29/2026Q00250507-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/28/2026Q00295136-I1Open ↗
08/13/2026Q00250507-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026Q00250507-I1Open ↗
08/28/2026Q00295136-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
10/24/2019421797256Open ↗
▸Trade Schedules & Equipment1
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
01/26/2021421797256Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
10/24/2019421797256Open ↗
▸BISTenant Protection Plan and Notes1
10/24/2019421797256Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/28/2026Q00295136-I1Open ↗
08/13/2026Q00250507-I1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
12/31/2020421797256Open ↗
08/13/2020421797256Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/28/2021421797256Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/24/2019421797256Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
12/31/2020421797256Open ↗
08/13/2020421797256Open ↗
▸Approvals, Objections & Sign-offs3
▸BISSCHEDULE A - OCCUPANCY / USE2
01/14/2020421797256Open ↗
10/24/2019421797256Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/14/2020421797256Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
01/26/2021421797256Open ↗
01/14/2020421797256Open ↗
10/24/2019421797256Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
01/26/2021421797256Open ↗
01/03/2020421797256Open ↗
▸BISEFILING COVER SHEET1
10/24/2019421797256Open ↗
▸Other Documents2
▸BISPLOT DIAGRAM2
04/28/2021421797256Open ↗
01/23/2020421797256Open ↗