← Back
BuildNYC
Three families
72-38 CALDWELL AVENUE
QUEENS · Maspeth · BIN 4063850
💬 Discuss this project
1955Year Built
3Stories
C0Building Class
R4Zoning
3,036 sfGross Floor Area
3Units
Rent Stabilized9 Active Violations ▸
Three families · Owner of record: 75-38 Caldwell Avenue · 2,200 sf lot · 1.38 FAR built · Flood zone X
Locations of Work
PlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 3Hydraulically designed sprinkler system installation1p · 1 filing · 4 docs
Floor 2Hydraulically designed sprinkler system installation1p · 1 filing · 4 docs
Floor 1Hydraulically designed sprinkler system installation3p · 2 filings · 11 docs
CellarHydraulically designed sprinkler system installation2p · 2 filings · 11 docs
Site & exteriorHydraulically designed sprinkler system installation1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
75-38 Caldwell Avenue103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Automated Design Engineering101/27/2020
CD Architect Studio101/13/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CD Architect Studio203/21/2026
Noel Building Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
New Era Mechanical ServicesPlumbing107/08/2026
New Era Mechanical ServiceFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Automated Design Consulta895101/27/2020
CD Architect Studio2573101/13/2020
Building Lifecycle
04/15/2024
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
03/29/2023
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
03/04/2022
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
12/01/2021
§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE VANITY AT WASHBASIN IN THE BATHROOM LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT…
HPD violation · open
12/01/2021
§ 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE COPPER LINE AT BASEBOARD HEATER CRACKED AT WEST WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED…
HPD violation · open
27 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offNew Era Mechanical Services08/26/2020
DOB NOWSprinklersSigned-offNew Era Mechanical Service08/21/2020
BIS—ISSUEDNarula Development08/13/2020
1 project · most recent 08/07/2020
General Wiring
FiledStatusContractorScope
08/07/2020CompleteEric & NG ElectricalGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/13/2020Fire-Resistant Penetrations and JointsPeter D'Angelospecial
01/13/2020Energy Code Compliance InspectionsPeter D'Angeloprogress
01/10/2020Sprinkler SystemsGregory Mortmanspecial
11/04/2019HVAC and service water heating equipment Peter D'Angeloenergy_progress
11/04/2019HVAC and service water heating system controls Peter D'Angeloenergy_progress
39 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account