← Back
Two family frame
72 EAST 7 STREET
BROOKLYN · BIN 3122844
💬 Discuss this project
1899Year Built
2.5Stories
B2Building Class
R5BZoning
1,974 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two family frame · Owner of record: MTEK PARK LLC · 2,000 sf lot · 0.99 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Floor 2Under Construction24p · 1 filing · 20 docs
Floor 1Under Construction23p · 1 filing · 20 docs
CellarUnder Construction29p · 1 filing · 20 docs
1 job · most recent 09/15/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/15/2026Permit IssuedPRIMROSE SERVICE INCHeating and Air Conditioning Systems
Heat / Cool
Apower AP3M24HP230VMO 24,000 BTU · Condensing Unit ×1
APF60HP230VAO-R32 48,000 BTU · Condensing Unit ×3
APF48HP230VAI-R32 48,000 BTU · Condensing Unit ×2
Gree LIV36HP230V1R32AO 34,000 BTU · Condensing Unit ×3
1 job · most recent 09/15/2026
Sprinkler System
FiledStatusContractorScope
09/15/2026Permit IssuedDYNAMIC PLBNG & SPRKR CORSprinkler System
1 job · most recent 09/15/2026
Gas Water/Sanitary
FiledStatusContractorScope
09/15/2026Permit IssuedM & M PIPING AND HEATINGGas, Water/Sanitary
1 job · most recent 10/26/2025
General Wiring
FiledStatusContractorScope
10/26/2025CompleteAMERICAN POWER ELECT CONSGeneral Wiring
Building Lifecycle
All (81)Filed (14)Permit Issued (6)Violation (5)Inspection (12)Objection (14)Special Inspection (30)
09/28/2026
Permit issued — Sprinklers
B01221710-S2-EW-SP
09/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SIMON JIANG
09/17/2026
Special inspection requirement — Maintenance information
CALVIN TRAN
09/17/2026
Special inspection requirement — Mechanical Systems
SIMON JIANG
09/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
CALVIN TRAN
09/17/2026
Special inspection requirement — Energy Code Compliance Inspections
CALVIN TRAN
09/17/2026
Special inspection requirement — Final
CALVIN TRAN
09/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
CALVIN TRAN
09/17/2026
Special inspection requirement — Duct leakage testing, insulation and design
CALVIN TRAN
09/17/2026
Special inspection requirement — Heating Systems
SIMON JIANG
09/17/2026
Special inspection requirement — Shutoff dampers
CALVIN TRAN
09/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
CALVIN TRAN
09/15/2026
Filed — Alteration CO
REMOVED & REINSTALL PLUMBING SYSTEM THROUGHOUT EXISTING ONE (1) FAMILY, 2-STORY WITH ATTIC & CELLAR IN CONJUNCTION WITH ALT1 JOB # B01221710-I1
B01221710-A2
09/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
CALVIN TRAN
09/15/2026
Special inspection requirement — Maintenance information
CALVIN TRAN
09/15/2026
Special inspection requirement — Shutoff dampers
CALVIN TRAN
09/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
CALVIN TRAN
09/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
CALVIN TRAN
09/15/2026
Special inspection requirement — Final
CALVIN TRAN
09/15/2026
Special inspection requirement — Energy Code Compliance Inspections
CALVIN TRAN
09/15/2026
Special inspection requirement — Mechanical Systems
SIMON JIANG
09/15/2026
Special inspection requirement — Heating Systems
SIMON JIANG
09/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SIMON JIANG
09/15/2026
Special inspection requirement — Duct leakage testing, insulation and design
CALVIN TRAN
09/11/2026
Permit issued — General Construction
B01221710-I1-GC
08/12/2026
Filed — Alteration CO
REMOVED & REINSTALL PLUMBING SYSTEM THROUGHOUT EXISTING ONE (1) FAMILY, 2-STORY WITH ATTIC & CELLAR IN CONJUNCTION WITH ALT1 JOB # B01221710-I1
B01221710-A1
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SIMON JIANG
08/11/2026
Special inspection requirement — Insulation placement and R values
CALVIN TRAN
08/11/2026
Special inspection requirement — Energy Code Compliance Inspections
CALVIN TRAN
08/11/2026
Special inspection requirement — Fenestration areas
CALVIN TRAN
08/11/2026
Special inspection requirement — Permanent certificate
CALVIN TRAN
08/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
CALVIN TRAN
08/11/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
CALVIN TRAN
08/11/2026
Special inspection requirement — Metering
CALVIN TRAN
08/07/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/18/2026
Filed — Alteration CO
REMOVED & REINSTALL PLUMBING SYSTEM THROUGHOUT EXISTING ONE (1) FAMILY, 2-STORY WITH ATTIC & CELLAR IN CONJUNCTION WITH ALT1 JOB # B01221710-I1
B01221710-P8
06/18/2026
Filed — Alteration CO
REMOVED & REINSTALL PLUMBING SYSTEM THROUGHOUT EXISTING ONE (1) FAMILY, 2-STORY WITH ATTIC & CELLAR IN CONJUNCTION WITH ALT1 JOB # B01221710-I1
B01221710-P9
05/28/2026
Filed — Alteration CO
REMOVED & REINSTALL PLUMBING SYSTEM THROUGHOUT EXISTING ONE (1) FAMILY, 2-STORY WITH ATTIC & CELLAR IN CONJUNCTION WITH ALT1 JOB # B01221710-I1
B01221710-P7
05/27/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
05/21/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/09/2026
Filed — Alteration CO
REMOVED & REINSTALL PLUMBING SYSTEM THROUGHOUT EXISTING ONE (1) FAMILY, 2-STORY WITH ATTIC & CELLAR IN CONJUNCTION WITH ALT1 JOB # B01221710-I1
B01221710-P5
02/23/2026
Filed — Alteration CO
REMOVED & REINSTALL PLUMBING SYSTEM THROUGHOUT EXISTING ONE (1) FAMILY, 2-STORY WITH ATTIC & CELLAR IN CONJUNCTION WITH ALT1 JOB # B01221710-I1
B01221710-P4
02/06/2026
Violation issued (ECB, closed)
Construction
02/06/2026
Violation issued (ECB, closed)
Construction
02/05/2026
Filed — Alteration CO
REMOVED & REINSTALL PLUMBING SYSTEM THROUGHOUT EXISTING ONE (1) FAMILY, 2-STORY WITH ATTIC & CELLAR IN CONJUNCTION WITH ALT1 JOB # B01221710-I1
B01221710-P3
02/04/2026
Filed — Alteration CO
REMOVED & REINSTALL PLUMBING SYSTEM THROUGHOUT EXISTING ONE (1) FAMILY, 2-STORY WITH ATTIC & CELLAR IN CONJUNCTION WITH ALT1 JOB # B01221710-I1
B01221710-P2
01/30/2026
Objection raised — Admin
01/30/2026
Objection resolved — Addressed
01/29/2026
Filed — Alteration CO
REMOVED & REINSTALL PLUMBING SYSTEM THROUGHOUT EXISTING ONE (1) FAMILY, 2-STORY WITH ATTIC & CELLAR IN CONJUNCTION WITH ALT1 JOB # B01221710-I1
B01221710-P1
01/22/2026
Violation issued (ECB, closed)
Construction
01/22/2026
Violation issued (ECB, closed)
Construction
01/20/2026
Violation issued (ECB, closed)
Construction
12/19/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/19/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
12/19/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/14/2025
Permit issued — Sprinklers
B01221710-S2-EW-SP
11/14/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
11/03/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
Latest 60 of 81 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MTEK2609/29/2026
PRIMROSE SERVICE203/22/2026
MTEK NYC LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/10/2025$1.5M—— → —$760/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CQ&J CORPORATION1409/15/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WM ARCH1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRIMROSE SERVICE INCGeneral Contractor309/13/2026
DYNAMIC PLBNG & SPRKR CORFire Protection209/29/2026
M & M PIPING AND HEATINGPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SIMON75551009/15/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedDYNAMIC PLBNG & SPRKR COR09/28/2026
DOB NOWGeneral ConstructionPermit IssuedPRIMROSE SERVICE INC09/11/2026
DOB NOWSprinklersPermit IssuedCITYWIDE PLBG, HTG &SPRKL11/14/2025
DOB NOWPlumbingPermit IssuedM & M PIPING AND HEATING10/23/2025
DOB NOWMechanical SystemsSigned-offPRIMROSE SERVICE INC10/14/2025
DOB NOWGeneral ConstructionPermit IssuedPRIMROSE SERVICE INC10/08/2025
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
08/07/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/27/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
05/21/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/19/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/19/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/19/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/19/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/14/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
11/03/2025Pass-Final PL - UndergroundPassView ↗
02/23/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/20/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 91
DateRequirementInspectorRole
09/17/2026Mechanical SystemsSIMON JIANGspecial
09/17/2026Heating SystemsSIMON JIANGspecial
09/17/2026HVAC-R and service water heating equipmentCALVIN TRANenergy_progress
09/17/2026Duct leakage testing, insulation and designCALVIN TRANenergy_progress
09/17/2026HVAC-R and service water heating system controlsCALVIN TRANenergy_progress
09/17/2026Shutoff dampersCALVIN TRANenergy_progress
09/17/2026HVAC-R and service water piping design and insulationCALVIN TRANenergy_progress
09/17/2026Maintenance informationCALVIN TRANenergy_progress
09/17/2026Energy Code Compliance InspectionsCALVIN TRANprogress
09/17/2026FinalCALVIN TRANprogress
09/17/2026Fire-Resistant Penetrations and JointsSIMON JIANGspecial
09/15/2026FinalCALVIN TRANprogress
09/15/2026Fire-Resistant Penetrations and JointsSIMON JIANGspecial
09/15/2026Heating SystemsSIMON JIANGspecial
09/15/2026Mechanical SystemsSIMON JIANGspecial
09/15/2026Energy Code Compliance InspectionsCALVIN TRANprogress
09/15/2026HVAC-R and service water heating system controlsCALVIN TRANenergy_progress
09/15/2026HVAC-R and service water piping design and insulationCALVIN TRANenergy_progress
09/15/2026Duct leakage testing, insulation and designCALVIN TRANenergy_progress
09/15/2026Shutoff dampersCALVIN TRANenergy_progress
09/15/2026Maintenance informationCALVIN TRANenergy_progress
09/15/2026HVAC-R and service water heating equipmentCALVIN TRANenergy_progress
08/11/2026Fire-Resistant Penetrations and JointsSIMON JIANGspecial
08/11/2026Interior lighting powerCALVIN TRANenergy_progress
08/11/2026Fenestration air leakageCALVIN TRANenergy_progress
Latest 25 of 91.
▾Documents — 150 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/20/2026B01221710-S3Request digital key ↗
08/20/2026B01221710-S2Request digital key ↗
08/20/2026B01221710-S1Request digital key ↗
Showing 3 of 13 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZoning Exhibit form (1-5)5
08/20/2026B01221710-A1Open ↗
08/20/2026B01221710-P8Open ↗
08/13/2026B01221710-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/13/2026B01221710-P1Open ↗
08/13/2026B01221710-I1Open ↗
08/13/2026B01221710-P4Open ↗
▸Seals & Professional Certifications105
▸DOB NOWProgress Inspector Seal & Signature76
09/23/2026B01221710-A2Open ↗
09/23/2026B01221710-A2Open ↗
09/23/2026B01221710-A2Open ↗
Showing 3 of 76 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/23/2026B01221710-A2Open ↗
09/23/2026B01221710-A2Open ↗
09/23/2026B01221710-A2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/22/2026B01221710-A2Open ↗
08/20/2026B01221710-S2Open ↗
08/20/2026B01221710-S1Open ↗
Showing 3 of 14 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist5
08/20/2026B01221710-A1Open ↗
08/20/2026B01221710-P8Open ↗
08/13/2026B01221710-P4Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
09/22/2026B01221710-A2Open ↗
08/20/2026B01221710-S2Open ↗
08/20/2026B01221710-P3Open ↗
Showing 3 of 14 on file for this type
▸Other Documents5
▸DOB NOWProperty Ownership Certification5
08/20/2026B01221710-I1Open ↗
08/20/2026B01221710-P4Open ↗
08/20/2026B01221710-P8Open ↗
Showing 3 of 5 on file for this type