← Back
Over six families without stores
Lower East Side III (NYCHA)
720 EAST 9 STREET · East Village · BIN 1084876
💬 Discuss this project
1994Year Built
4Stories
C1Building Class
R8BZoning
64,907 sfGross Floor Area
59Units
LL97 Covered6 Open Violations 1 unresolved · 5 paperwork only ▸
Over six families without stores · Owner of record: NYC HOUSING AUTHORITY · 42,689 sf lot · 1.52 FAR built · Flood zone X500
Locations of Work
MechanicalPlumbing
Floor 14p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA807/08/2026
NYC HOUSING AUTHORITY103/22/2026
NEW YORK CITY HOUSING AUT303/22/2026
SHAHEEN CONSTRUCTION203/21/2026
GRENADIER REALTY203/21/2026
BILLY CONTRACTORS103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.209/21/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOSEPHINE THE PLUMBER LLCPlumbing407/08/2026
ABE HIMELFARBElectrical103/21/2026
CHETRAM, RISHIRAMElectrical103/21/2026
QUINTANA, DAVIDElectrical103/21/2026
Building Lifecycle
All (72)Filed (2)Permit Issued (4)Violation (60)Inspection (5)Special Inspection (1)
04/22/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/08/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/28/2023
Permit issued — Boiler Equipment
M08002330-I1-BE
11/28/2023
Permit issued — Plumbing
M08002344-I1-PL
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/11/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/23/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/20/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/24/2022
Permit issued — Boiler Equipment
M08002330-I1-BE
09/24/2022
Permit issued — Plumbing
M08002344-I1-PL
09/21/2022
Filed — Alteration
REPLACE (2) GAS-FIRED BOILERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M08002330-I1
09/21/2022
Filed — Alteration
CONNECT TO EXISTING GAS PIPING FOR TWO (2) REPLACEMENT GAS-FIRED BOILERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M08002344-I1
09/21/2022
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/12/2019
Violation issued (ECB, open)
Boilers
08/12/2019
Violation issued (ECB, open)
Boilers
08/12/2019
Violation issued (ECB, open)
Boilers
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/07/2016
Violation issued (HPD, closed)
B
07/07/2016
Violation issued (HPD, closed)
B
07/07/2016
Violation issued (HPD, closed)
B
07/07/2016
Violation issued (HPD, closed)
C
07/07/2016
Violation issued (HPD, closed)
B
07/07/2016
Violation issued (HPD, closed)
A
07/07/2016
Violation issued (HPD, closed)
C
07/07/2016
Violation issued (HPD, closed)
B
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/29/2011
Violation issued (ECB, closed)
Unknown
09/29/2011
Violation issued (ECB, closed)
Construction
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offJOSEPHINE THE PLUMBER LLC11/28/2023
DOB NOWPlumbingPermit IssuedJOSEPHINE THE PLUMBER LLC11/28/2023
DOB NOWBoiler EquipmentSigned-offJOSEPHINE THE PLUMBER LLC09/24/2022
DOB NOWPlumbingPermit IssuedJOSEPHINE THE PLUMBER LLC09/24/2022
BISOTISSUEDSHAHEEN CONSTRUCTION CORP08/04/2017
BISEQISSUEDBILLY CONTRACTORS INC08/30/2011
BISOTISSUEDDELIDAKIS CONSTR CO INC08/25/2011
BISEQISSUEDBILLY CONTRACTORS INC06/23/2011
BISOTISSUEDDELIDAKIS CONSTR CO INC06/16/2011
BIS—ISSUEDSPARROW CONSTRUCTION CORP.09/19/1996
BISPLISSUEDMEDCO PLUMBING INC08/16/1996
BISPLISSUEDMEDCO PLUMBING INC08/16/1996
BISEQISSUEDSPARROW CONSTRUCTION CORP.01/04/1996
BISEQISSUEDSPARROW CONSTRUCTION CORP.12/27/1995
BIS—ISSUEDSPARROW CONSTRUCTION CORP.09/13/1995
BISEQISSUEDSPARROW CONSTRUCTION CORP.09/13/1995
BIS—ISSUEDSPARROW CONSTRUCTION CORP.09/13/1995
BISEQISSUEDSPARROW CONSTRUCTION CORP.12/22/1994
BISEQISSUEDSPARROW CONSTRUCTION CORP.12/22/1994
BISEQISSUEDSPARROW CONSTRUCTION CORP.09/06/1994
BISEQISSUEDSPARROW CONSTRUCTION CORP.09/06/1994
BIS—ISSUEDSPARROW CONSTRUCTION CORP.09/06/1994
BISPLISSUEDMEDCO PLUMBING INC04/08/1994
BISPLISSUEDMEDCO PLUMBING INC04/08/1994
BISEQISSUEDSPARROW CONSTRUCTION CORP.12/16/1993
BIS—ISSUEDSPARROW CONSTRUCTION CORP.11/15/1993
BIS—ISSUEDSPARROW CONSTRUCTION CORP.11/12/1993
1 project · most recent 09/21/2022
Gas
FiledStatusContractorScope
09/21/2022Permit IssuedJOSEPHINE THE PLUMBER LLCGas
1 project · most recent 07/25/2022
FiledStatusContractorScope
07/25/2022Permit IssuedROBERT CHIMENTI31 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/22/2024Pass-Final Boiler Equipment InspectionPassView ↗
12/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/11/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/23/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/20/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
09/21/2022HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
09/01/2026M08002344-I1Request digital key ↗
09/01/2026M08002330-I1Request digital key ↗
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION4
08/03/2017140677827Open ↗
09/09/2011120721870Open ↗
06/27/2011120738345Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
08/03/2017140677827Open ↗
06/27/2011120738345Open ↗
06/17/2011120721870Open ↗
▸Seals & Professional Certifications14
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
06/27/2011120738345Open ↗
06/17/2011120721870Open ↗
06/17/2011120721870Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
06/27/2011120738345Open ↗
06/27/2011120738345Open ↗
06/17/2011120721870Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
06/27/2011120738345Open ↗
06/17/2011120721870Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/01/2026M08002344-I1Open ↗
09/01/2026M08002330-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/03/2017140677827Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/03/2017140677827Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/03/2017140677827Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/23/2026M08002330-I1Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
08/03/2017140677827Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026M08002344-I1Open ↗
09/01/2026M08002330-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/27/2011120738345Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/17/2011120721870Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/03/2017140677827Open ↗
▸Approvals, Objections & Sign-offs4
▸BISADMINISTRATIVE OBJECTIONS2
06/27/2011120738345Open ↗
06/17/2011120721870Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026M08002344-I1Open ↗
08/13/2026M08002330-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
08/03/2017140677827Open ↗
06/17/2011120721870Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
06/27/2011120738345Open ↗
06/17/2011120721870Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/03/2017140677827Open ↗