← Back
Walk-up cooperative
720 WEST 11 STREET
MANHATTAN · BIN 1083556
💬 Discuss this project
1939Year Built
5Stories
C6Building Class
C1-6AZoning
118,350 sfGross Floor Area
100Units
LL97 CoveredRent Stabilized23 Open Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: WVH HOUSING CORPORATION · 39,334 sf lot · 3.01 FAR built · Flood zone AE
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Roof4p · 1 filing · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 58p · 1 filing · 20 docs
Floor 4
Floor 3
Floor 2Under Construction2p · 1 filing · 7 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AKAM ASSOCIATES1907/08/2026
TOPLINE NYC INC.503/22/2026
NYC HOUSING DEVELOP103/22/2026
ROCK GROUP NY CORP103/21/2026
WVH DEVELOPMENT503/21/2026
WEST VILLAGE HOUSING103/21/2026
WVH HOUSING CORPORATION203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DANIEL O'CONNOR ARCHITECTS203/25/2026
CAROL MARYAN ARCHITECT, PC412/10/2024
ASR ENGINEERING PC106/05/2024
COWLEY ENGINEERING, PC103/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES103/21/2026
CLARKE CONSTRUCTION CONSULTANTS403/21/2026
THERESA VOLTAGGIO103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MASON CONSTRUCTION SERVICGeneral Contractor303/21/2026
TOPLINE NYC INCGeneral Contractor303/21/2026
ZKC NY LLCGeneral Contractor207/08/2026
ABSOLUTE PLBG HTG & MECHPlumbing107/08/2026
BENJAMIN DREBINElectrical103/21/2026
URBAN MECHANICAL CORPPlumbing106/27/2026
RICHARD NEUElectrical103/21/2026
FATU, INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DANIEL O'CONNOR ARCHITECT1730103/25/2026
CAROL MARYAN ARCHITECT4233312/10/2024
COWLEY ENGINEERING186103/04/2024
Building Lifecycle
All (61)Filed (8)Permit Issued (7)Signed Off (4)Violation (21)Inspection (5)Objection (2)Special Inspection (14)
07/15/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/25/2026
Permit issued — Plumbing
M01372984-S1-PL
04/28/2026
Permit issued — General Construction
M01372984-I1-GC
04/05/2026
Objection raised — Scope
04/05/2026
Objection resolved — Addressed
03/25/2026
Filed — Alteration
INTERIOR ALTERATIONS IN APARTMENT 2B INCLUDING REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01372984-S1
03/25/2026
Filed — Alteration
INTERIOR ALTERATIONS IN APARTMENT 2B INCLUDING REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01372984-I1
03/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel O'Connor
04/22/2025
Signed off — Alteration
M00885538-I1
01/03/2025
Signed off — Alteration
M00881649-I1
01/02/2025
Signed off — Alteration
M00881649-S2
12/19/2024
Special inspection requirement — Final
Carol Maryan
12/19/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Carol Maryan
12/19/2024
Special inspection requirement — Maintenance information
Carol Maryan
12/19/2024
Special inspection requirement — Mechanical Systems
Carol Maryan
12/10/2024
Filed — Alteration
M00881649-P1
07/17/2024
Signed off — Alteration
M00881649-S1
07/09/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/28/2024
Permit issued — General Construction
M00885538-I1-GC
06/06/2024
Permit issued — Sidewalk Shed
M01061488-I1-SH
06/05/2024
Filed — Alteration
M01061488-I1
05/23/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/04/2024
Filed — Alteration
M00885538-I1
01/09/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/02/2023
Permit issued — Plumbing
M00881649-S1-PL
10/30/2023
Permit issued — General Construction
M00881649-I1-GC
10/30/2023
Permit issued — Mechanical Systems
M00881649-S2-MS
05/31/2023
Filed — Alteration
M00881649-I1
05/31/2023
Filed — Alteration
M00881649-S2
05/31/2023
Filed — Alteration
M00881649-S1
05/26/2023
Special inspection requirement — Masonry
Carol Maryan
05/26/2023
Special inspection requirement — Fire-Resistance Rated Construction
Carol Maryan
05/26/2023
Special inspection requirement — Final
Carol Maryan
05/26/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Carol Maryan
05/26/2023
Special inspection requirement — Fenestration air leakage
Carol Maryan
05/26/2023
Special inspection requirement — Air barrier - visual inspection
Carol Maryan
05/26/2023
Special inspection requirement — Insulation placement and R values
Carol Maryan
05/26/2023
Special inspection requirement — Lighting in dwelling units
Carol Maryan
05/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Carol Maryan
03/09/2017
Violation issued (HPD, open)
A
03/09/2017
Violation issued (HPD, open)
A
03/09/2017
Violation issued (HPD, open)
A
03/09/2017
Violation issued (HPD, open)
B
03/09/2017
Violation issued (HPD, open)
B
03/09/2017
Violation issued (HPD, open)
B
03/09/2017
Violation issued (HPD, open)
A
03/09/2017
Violation issued (HPD, open)
A
03/02/2017
Violation issued (HPD, open)
A
06/03/2004
Violation issued (HPD, closed)
A
07/15/2003
Violation issued (ECB, closed)
Construction
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/20/1998
Violation issued (HPD, closed)
B
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offURBAN MECHANICAL CORP06/25/2026
DOB NOWGeneral ConstructionPermit IssuedFATU, INC04/28/2026
DOB NOWGeneral ConstructionSigned-offMASON CONSTRUCTION SERVIC06/28/2024
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC INC06/06/2024
DOB NOWPlumbingSigned-offABSOLUTE PLBG HTG & MECH11/02/2023
DOB NOWGeneral ConstructionSigned-offZKC NY LLC10/30/2023
DOB NOWMechanical SystemsSigned-offZKC NY LLC10/30/2023
BISEQISSUEDROCK GROUP NY CORP05/16/2017
BISPLISSUEDSO PLUMBING & HEATING INC05/05/2017
BISOTISSUEDK.J. REMODELING OF NY CO*04/21/2017
BISOTISSUEDTWO-TONE CONTRACTING CORP.03/28/2017
BISOTISSUEDTWO-TONE CONTRACTING CORP.09/12/2016
BISEQISSUEDEVEREST SCAFFOLDING INC05/07/2009
3 jobs · most recent 03/30/2026
General Wiring
FiledStatusContractorScope
03/30/2026Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
06/10/2024Permit IssuedRICHARD NEU—
11/01/2023Permit IssuedACCURATE ELEC'L CORP.General Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/15/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
03/16/2026Fire-Resistant Penetrations and JointsDaniel O'Connorspecial
12/19/2024FinalCarol Maryanprogress
12/19/2024HVAC-R and service water piping design and insulationCarol Maryanenergy_progress
12/19/2024Maintenance informationCarol Maryanenergy_progress
12/19/2024Mechanical SystemsCarol Maryanspecial
05/26/2023MasonryCarol Maryanspecial
05/26/2023Fire-Resistance Rated ConstructionCarol Maryanprogress
05/26/2023FinalCarol Maryanprogress
05/26/2023Fenestration and door U-factor and product ratingsCarol Maryanenergy_progress
05/26/2023Fenestration air leakageCarol Maryanenergy_progress
05/26/2023Air barrier - visual inspectionCarol Maryanenergy_progress
05/26/2023Insulation placement and R valuesCarol Maryanenergy_progress
05/26/2023Lighting in dwelling unitsCarol Maryanenergy_progress
05/26/2023Fire-Resistant Penetrations and JointsCarol Maryanspecial
▾Documents — 101 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/27/2026M00885538-I1Request digital key ↗
08/27/2026M01061488-I1Request digital key ↗
08/25/2026M00881649-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION7
07/31/2018122772268Open ↗
05/30/2017123065342Open ↗
05/17/2017123065342Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION5
05/15/2017140634712Open ↗
04/25/2017123065342Open ↗
04/11/2017122772268Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications38
▸DOB NOWProgress Inspector Seal & Signature10
08/28/2026M00881649-I1Open ↗
08/28/2026M00881649-I1Open ↗
08/28/2026M00881649-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026M01061488-I1Open ↗
08/25/2026M00881649-S2Open ↗
08/25/2026M00881649-S1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
08/30/2018122772268Open ↗
11/15/2017123065342Open ↗
04/25/2017123065342Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/28/2026M00881649-I1Open ↗
08/28/2026M00881649-I1Open ↗
08/24/2026M01372984-S1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
04/24/2017123065342Open ↗
06/20/2016122772268Open ↗
05/08/2009120031811Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
05/15/2017140634712Open ↗
04/24/2017123065342Open ↗
06/20/2016122772268Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/15/2017140634712Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/15/2017140634712Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/08/2009120031811Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
05/30/2017123065342Open ↗
05/17/2017123065342Open ↗
04/24/2017123065342Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
04/24/2017123065342Open ↗
06/20/2016122772268Open ↗
05/15/2017140634712Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/25/2026M00881649-P1Open ↗
08/25/2026M00881649-S2Open ↗
08/25/2026M00881649-S1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
04/24/2017123065342Open ↗
06/20/2016122772268Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/08/2009120031811Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
08/30/2018122772268Open ↗
11/15/2017123065342Open ↗
04/25/2017123065342Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
08/30/2018122772268Open ↗
11/15/2017123065342Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
05/15/2017140634712Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
05/15/2017140634712Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
08/30/2018122772268Open ↗
11/15/2017123065342Open ↗
03/30/2017122772268Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
05/08/2009120031811Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
08/30/2018122772268Open ↗
07/31/2018122772268Open ↗
11/15/2017123065342Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms8
▸BISBOROUGH INTAKE FORM3
08/30/2018122772268Open ↗
07/18/2018122772268Open ↗
11/15/2017123065342Open ↗
▸BISEFILING COVER SHEET2
04/24/2017123065342Open ↗
06/20/2016122772268Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
05/15/2017140634712Open ↗
05/08/2009120031811Open ↗
▸BISADDITIONAL INFORMATION1
07/31/2018122772268Open ↗