← Back
Primarily 2 family with 1 store or office
7209 18 AVENUE
BROOKLYN · BIN 3158520
💬 Discuss this project
1931Year Built
2Stories
S2Building Class
R5Zoning
2,560 sfGross Floor Area
3Units
Rent Stabilized13 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 7209 18TH AVE LLC · 2,053 sf lot · 1.25 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalCivil
Roof1p · 1 filing · 20 docs
Floor 61p · 1 filing · 20 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 11p · 1 filing · 20 docs
Cellar3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
7209 18TH AVE2107/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALLEN SHINFELD, P.E. PLLC108/01/2022
CL ENGINEERING P.C.807/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WM ARCH1603/21/2026
J&J CONSTRUCTION SOLUTION INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPLEN CONSTRUCTION INCGeneral Contractor303/21/2026
GLOBAL TEAM NY INCGeneral Contractor207/08/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781807/14/2022
Building Lifecycle
All (69)Filed (9)Permit Issued (4)Signed Off (4)Violation (18)Inspection (4)Special Inspection (30)
12/03/2024
Violation issued (HPD, closed)
I
11/28/2023
Violation issued (HPD, closed)
I
09/06/2022
Signed off — Alteration
B00783918-I1
08/09/2022
Permit issued — General Construction
B00783918-I1-GC
08/02/2022
Signed off — Alteration
EXISTING MIX-USE BUILDING RENOVATION WITH MECHANICAL WORK AT THE FIRST FLOOR AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00683916-S2
08/01/2022
Filed — Alteration
B00783918-I1
08/01/2022
Signed off — Alteration
EXISTING MIX-USE BUILDING RENOVATION WITH MECHANICAL WORK AT THE FIRST FLOOR AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00683916-S1
07/29/2022
Special inspection requirement — Final
ALLEN SHINFELD
07/28/2022
Signed off — Alteration
EXISTING MIX-USE BUILDING RENOVATION WITH MECHANICAL WORK AT THE FIRST FLOOR AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00683916-I1
07/27/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/14/2022
Filed — Alteration
EXISTING MIX-USE BUILDING RENOVATION WITH MECHANICAL WORK AT THE FIRST FLOOR AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00683916-P5
07/06/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/01/2022
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
07/01/2022
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
07/01/2022
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
07/01/2022
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
07/01/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
07/01/2022
Special inspection requirement — Insulation placement and R values
CHRISTIAN LOZADA
07/01/2022
Special inspection requirement — Lighting controls
CHRISTIAN LOZADA
07/01/2022
Special inspection requirement — Metering
CHRISTIAN LOZADA
07/01/2022
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
07/01/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
07/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
06/30/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/02/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/22/2022
Filed — Alteration
EXISTING MIX-USE BUILDING RENOVATION WITH MECHANICAL WORK AT THE FIRST FLOOR AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00683916-P4
04/15/2022
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
04/15/2022
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
04/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
04/15/2022
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
04/15/2022
Special inspection requirement — Final
CHRISTIAN LOZADA
04/15/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
04/15/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
04/15/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
04/15/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
04/14/2022
Filed — Alteration
EXISTING MIX-USE BUILDING RENOVATION WITH MECHANICAL WORK AT THE FIRST FLOOR AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00683916-P1
04/14/2022
Filed — Alteration
EXISTING MIX-USE BUILDING RENOVATION WITH MECHANICAL WORK AT THE FIRST FLOOR AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00683916-P2
04/14/2022
Filed — Alteration
EXISTING MIX-USE BUILDING RENOVATION WITH MECHANICAL WORK AT THE FIRST FLOOR AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00683916-P3
04/14/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
04/14/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
04/14/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
04/14/2022
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
04/14/2022
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
04/14/2022
Special inspection requirement — Final
CHRISTIAN LOZADA
04/14/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
04/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
04/14/2022
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
04/08/2022
Permit issued — Mechanical Systems
B00683916-S1-MS
04/06/2022
Permit issued — Plumbing
B00683916-S2-PL
03/21/2022
Filed — Alteration
EXISTING MIX-USE BUILDING RENOVATION WITH MECHANICAL WORK AT THE FIRST FLOOR AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00683916-S2
03/21/2022
Filed — Alteration
EXISTING MIX-USE BUILDING RENOVATION WITH MECHANICAL WORK AT THE FIRST FLOOR AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00683916-S1
03/17/2022
Permit issued — General Construction
B00683916-I1-GC
03/10/2022
Filed — Alteration
EXISTING MIX-USE BUILDING RENOVATION WITH MECHANICAL WORK AT THE FIRST FLOOR AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00683916-I1
09/19/2009
Violation issued (HPD, open)
A
09/19/2009
Violation issued (HPD, open)
B
09/19/2009
Violation issued (HPD, open)
A
09/19/2009
Violation issued (HPD, open)
B
09/19/2009
Violation issued (HPD, open)
B
09/19/2009
Violation issued (HPD, open)
A
09/19/2009
Violation issued (HPD, open)
A
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSPLEN CONSTRUCTION INC08/09/2022
DOB NOWMechanical SystemsSigned-offGLOBAL TEAM NY INC04/08/2022
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC04/06/2022
DOB NOWGeneral ConstructionSigned-offGLOBAL TEAM NY INC03/17/2022
1 project · most recent 07/27/2022
General Wiring
FiledStatusContractorScope
07/27/2022CompleteA.C. MORGAN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/27/2022Pass-Final General Construction Non-Directive 14PassView ↗
07/06/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/30/2022Fail-Final General Construction Non-Directive 14FailView ↗
05/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
07/29/2022FinalALLEN SHINFELDprogress
07/01/2022Fenestration areasCHRISTIAN LOZADAenergy_progress
07/01/2022Interior lighting powerCHRISTIAN LOZADAenergy_progress
07/01/2022Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
07/01/2022Fenestration air leakageCHRISTIAN LOZADAenergy_progress
07/01/2022Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
07/01/2022Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
07/01/2022Lighting controlsCHRISTIAN LOZADAenergy_progress
07/01/2022MeteringCHRISTIAN LOZADAenergy_progress
07/01/2022Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
07/01/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
07/01/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
04/15/2022Maintenance informationCHRISTIAN LOZADAenergy_progress
04/15/2022Mechanical SystemsCHRISTIAN LOZADAspecial
04/15/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
04/15/2022Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
04/15/2022FinalCHRISTIAN LOZADAprogress
04/15/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
04/15/2022HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
04/15/2022HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
04/15/2022HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
04/14/2022HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
04/14/2022HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
04/14/2022HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
04/14/2022Maintenance informationCHRISTIAN LOZADAenergy_progress
Latest 25 of 47.
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/31/2026B00683916-S1Request digital key ↗
08/31/2026B00683916-I1Request digital key ↗
08/31/2026B00683916-P5Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature13
09/02/2026B00783918-I1Open ↗
09/02/2026B00683916-P5Open ↗
09/02/2026B00683916-P5Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/31/2026B00683916-P2Open ↗
08/31/2026B00683916-P1Open ↗
08/31/2026B00683916-S2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026B00683916-P5Open ↗
08/28/2026B00683916-P1Open ↗
08/27/2026B00683916-P2Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/31/2026B00683916-P2Open ↗
08/31/2026B00683916-P1Open ↗
08/31/2026B00683916-S2Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis3
08/13/2026B00683916-I1Open ↗
08/13/2026B00683916-S1Open ↗
08/13/2026B00683916-S2Open ↗