← Back
One family attached or semi-detached
7217 AVENUE U
BROOKLYN · BIN 3237373
💬 Discuss this project
1960Year Built
2Stories
A5Building Class
R3-1Zoning
1,250 sfGross Floor Area
1Units
One family attached or semi-detached · 2,200 sf lot · 0.57 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/29/2016$600K—— → —$480/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC110/27/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272110/27/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
04/16/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01308365-I1
11/03/2025
Permit issued — Solar
B01308365-I1-SL
10/27/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01308365-I1
10/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
10/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
10/24/2025
Special inspection requirement — Final
Walid Abdulla
10/24/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC11/03/2025
1 project · most recent 10/27/2025
General Wiring
FiledStatusContractorScope
10/27/2025Permit IssuedSUNRUN SOLAR ELECTL CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/24/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/24/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/24/2025Energy Code Compliance InspectionsWalid Abdullaprogress
10/24/2025FinalWalid Abdullaprogress
10/24/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026B01308365-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026B01308365-I1Open ↗
09/02/2026B01308365-I1Open ↗
09/02/2026B01308365-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026B01308365-I1Open ↗
09/02/2026B01308365-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B01308365-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01308365-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01308365-I1Open ↗