ECB07/01/2026At time of inspection of 4 story building observed sidewalk shed in place not to code specifications with vertical members obstructing subway ventilation systems causing hazardous conditions. Stop all use suppo$10K due
HPD03/08/2019§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT EAST WALL IN THE EAST 1 ROOM AT CELLAR (20 SQ. FT.) LOCATED AT BSMT-APT 1, 1st BSMT-APT FROM EAST AT SOUTH
HPD03/08/2019§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT WEST WALL IN THE EAST 2 ROOM AT CELLAR (12 SQ. FT.) LOCATED AT BSMT-APT UNIT1, 1st BSMT-APT FROM EAST AT SOUTH ORIGINAL VIOLATION 12952469 ISSUED 08-MAR-19 HAS BEEN UPGRADED TO CLASS C PER ADMINISTRATIVE CODE ''27-2017.3a(5)(a) or (b).
Old · issued 3+ years ago and still listed by DOB; nothing on the city's records either way
DOB05/03/2023Ftm-EXP1(front)facad in state disrpr.opn joints obsvd@EXP1/2(northwest cornr EXP1 wall@top fl.mult crcks&spalls in center stonecolumn@EXP1 2FL.crcks &dtriortd stons obsrvd@basmnt &1FL EXP1 wall.immediately comply with DOB violation 022323FEU10906BSIssued 2023; DOB's record still lists it as active
DOB05/03/2023Additional info.as per DOB violatn#022323FEU10906BS,the front facade is in a state of disrepair.open joists@exp 1/2(northwest)crnr of EXP1 (front)wall@TOP2 flrs lvls,mult crcks&spalls in center.1.immed install monitors&estblsh montorng campaign@drction of nys pe engneer,2.provde weekly montorng rports of frnt wallIssued 2023; DOB's record still lists it as active
DOB02/23/2022Ftm-exp 1(front)facade in state of disrepair. Open joints observed at exp 1/2(northwest)corner of EXP1 wall at top (2)floor levels. Multiple cracks & spalls in center stone column at EXP1 on 2FL level. Cracks & deteriorated stones observed at basement & 1FL level of EXP1 wall remedy:qualified exterior nyspe struct eng'r to eval entire facadeIssued 2022; DOB's record still lists it as active