← Back
Two family brick
7220 17 AVENUE
BROOKLYN · BIN 3158428
💬 Discuss this project
1930Year Built
2Stories
B1Building Class
R5Zoning
2,024 sfGross Floor Area
2Units
Two family brick · Owner of record: LUMINARY BEACON LLC · 3,350 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/10/2023$1.5M—Private party → LUMINARY BEACON LLC$741/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MW PROFESSIONAL ENGINEERING, P.C.108/13/2026
Building Lifecycle
All (17)Filed (1)Objection (5)Special Inspection (11)
09/08/2026
Objection raised — Inspections
09/08/2026
Objection raised — Other
09/08/2026
Objection raised — Cost
09/08/2026
Objection raised — Energy
09/08/2026
Objection raised — Scope
08/13/2026
Filed — Alteration CO
CONVERT 1ST FLOOR FROM DOCTOR OFFICE TO 1 FAMILY DWELLING UNIT FOR RESIDENTIAL BUILDING TO BE TWO FAMILY DWELLING UNITS.NEW PARTITION .PLUMBING WORK WILL BE FILE SEPARATE APPLICATION.OBTAIN NEW C. OF O.
B01435602-I1
08/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/03/2026
Special inspection requirement — Post-installed Anchors
08/03/2026
Special inspection requirement — Maintenance information
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/03/2026
Special inspection requirement — Energy Code Compliance Inspections
08/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
08/03/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
08/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/23/2026
Special inspection requirement — Mechanical Systems
07/23/2026
Special inspection requirement — Final
Nothing on file for this building.
1 project · most recent 08/13/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/13/2026——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-2C20NA 20,000 BTU · Condensing Unit ×1
MXZ-3C30NA 30,000 BTU · Condensing Unit ×1
MXZ2C20NAHZ4 20,000 BTU · Condensing Unit ×1
Daikin 4MXL36WVJU9 36,000 BTU · Condensing Unit ×2
1 project · most recent 05/25/2023
FiledStatusContractorScope
05/25/2023CompleteW 8 ELECTRIC CORP3 meters, 3 new_meters
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
08/03/2026HVAC-R and service water heating equipment—energy_progress
08/03/2026Post-installed Anchors—special
08/03/2026Maintenance information—energy_progress
08/03/2026Fire-Resistant Penetrations and Joints—special
08/03/2026Energy Code Compliance Inspections—progress
08/03/2026Fire-Resistance Rated Construction—progress
08/03/2026Fenestration and door U-factor and product ratings—energy_progress
08/03/2026HVAC-R and service water piping design and insulation—energy_progress
08/03/2026HVAC-R and service water heating system controls—energy_progress
07/23/2026Mechanical Systems—special
07/23/2026Final—progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026B01435602-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWRestrictive Declaration/Easement 11
08/16/2026B01435602-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026B01435602-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/16/2026B01435602-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026B01435602-I1Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/16/2026B01435602-I1Open ↗