← Back
Five to six families
723 METROPOLITAN AVENUE
BROOKLYN · BIN 3068744
💬 Discuss this project
1920Year Built
3Stories
C2Building Class
R7AZoning
2,835 sfGross Floor Area
5Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Five to six families · 2,322 sf lot · 1.22 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof2p · 2 filings · 20 docs
Floor 52p · 1 filing · 17 docs
Floor 4
Floor 31p · 1 filing · 17 docs
Floor 2
Floor 1
1 job · most recent 07/07/2026
Sprinkler System
FiledStatusContractorScope
07/07/2026——Sprinkler System
2 jobs · most recent 07/07/2026
Steel Masonry Wood
FiledStatusContractorScope
07/07/2026——1 scope_items
05/08/2026——Steel, Masonry, Wood
2 jobs · most recent 07/07/2026
Fence
FiledStatusContractorScope
07/07/2026——Fence
05/08/2026——Fence
Building Lifecycle
All (102)Filed (5)Violation (8)Objection (59)Special Inspection (30)
07/22/2026
Objection resolved — Open
07/22/2026
Objection resolved — Open
07/22/2026
Objection resolved — Open
07/22/2026
Objection resolved — Open
07/22/2026
Objection resolved — Open
07/22/2026
Objection resolved — Addressed
07/22/2026
Objection resolved — Open
07/22/2026
Objection resolved — Open
07/22/2026
Objection resolved — Resolved
07/22/2026
Objection resolved — Resolved
07/22/2026
Objection resolved — Open
07/22/2026
Objection resolved — Addressed
07/22/2026
Objection resolved — Open
07/22/2026
Objection resolved — Open
07/22/2026
Objection resolved — Addressed
07/22/2026
Objection resolved — Resolved
07/22/2026
Objection resolved — Addressed
07/09/2026
Objection raised — Scope
07/09/2026
Objection raised — Scope
07/09/2026
Objection raised — Energy
07/09/2026
Objection raised — Accessibility
07/09/2026
Objection raised — Cost
07/09/2026
Objection raised — Fire_Protection
07/09/2026
Objection raised — Fire_Protection
07/09/2026
Objection raised — Structural
07/09/2026
Objection raised — Scope
07/09/2026
Objection raised — Scope
07/09/2026
Objection raised — Other
07/09/2026
Objection raised — Other
07/09/2026
Objection raised — Other
07/09/2026
Objection raised — Other
07/09/2026
Objection raised — Other
07/09/2026
Objection raised — Other
07/09/2026
Objection raised — Scope
07/07/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Installation of construction fence at the subject premises.
B01415581-S2
06/25/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Installation of construction fence at the subject premises.
B01415581-I1
06/23/2026
Special inspection requirement — Protection of exposed foundation insulation
06/23/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
06/23/2026
Special inspection requirement — Interior lighting power
06/23/2026
Special inspection requirement — Permanent certificate
06/23/2026
Special inspection requirement — Lighting in dwelling units
06/23/2026
Special inspection requirement — Fenestration areas
06/23/2026
Special inspection requirement — Lighting controls
06/23/2026
Special inspection requirement — Fenestration air leakage
06/23/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
06/23/2026
Special inspection requirement — Air barrier - visual inspection
06/23/2026
Special inspection requirement — Insulation placement and R values
06/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/23/2026
Special inspection requirement — Energy Code Compliance Inspections
06/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/04/2026
Objection resolved — Resolved
06/04/2026
Objection resolved — Resolved
06/04/2026
Objection resolved — Resolved
06/04/2026
Objection resolved — Resolved
06/04/2026
Objection resolved — Resolved
06/04/2026
Objection resolved — Resolved
06/04/2026
Objection resolved — Resolved
06/04/2026
Objection resolved — Resolved
06/04/2026
Objection resolved — Resolved
Latest 60 of 102 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/12/2025$3.4M—— → —$1,182/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CKL ENGINEERING207/07/2026
CHUN ENGINEERING CONSULTANT PLLC206/25/2026
GRANT ENGINEERING CONSULTANTS, LLC105/08/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CAVALRY403/21/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
06/23/2026Protection of exposed foundation insulation—energy_progress
06/23/2026Exterior Insulation and Finish Systems (EIFS)—special
06/23/2026Interior lighting power—energy_progress
06/23/2026Permanent certificate—energy_progress
06/23/2026Lighting in dwelling units—energy_progress
06/23/2026Fenestration areas—energy_progress
06/23/2026Lighting controls—energy_progress
06/23/2026Fenestration air leakage—energy_progress
06/23/2026Fenestration and door U-factor and product ratings—energy_progress
06/23/2026Air barrier - visual inspection—energy_progress
06/23/2026Insulation placement and R values—energy_progress
06/23/2026Fire-Resistance Rated Construction—progress
06/23/2026Energy Code Compliance Inspections—progress
06/23/2026Structural Stability – Alterations of existing buildings—special
06/23/2026Fire-Resistant Penetrations and Joints—special
04/07/2026Excavations - Sheeting, Shoring, and Bracing—special
04/07/2026Concrete - Cast-In-Place—special
04/07/2026Subgrade Inspections—special
04/07/2026Masonry—special
04/07/2026Post-installed Anchors—special
04/07/2026Structural Steel - High Strength Bolting—special
04/07/2026Structural Steel - Welding—special
04/07/2026Structural Wood Frame—progress
04/06/2026Structural Stability – Alterations of existing buildings—special
04/06/2026Structural Steel - Details—special
Latest 25 of 43.
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/17/2026B01289920-S2Request digital key ↗
08/17/2026B01289920-I1Request digital key ↗
08/14/2026B01289920-S4Request digital key ↗
▸Applications & Permits4
▸BISBPP-5 - Authorization to the Department of Transportation3
03/05/2026340922586Open ↗
01/22/2026340922586Open ↗
01/22/2026340922586Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
01/22/2026340922586Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026B01289920-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/17/2026B01289920-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/17/2026B01289920-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026B01289920-I1Open ↗
08/17/2026B01289920-S4Open ↗
08/17/2026B01289920-S2Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/22/2026340922586Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/22/2026B01289920-S4Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/17/2026B01289920-I1Open ↗
08/14/2026B01289920-S4Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/05/2026340922586Open ↗
▸BISSTREET TREE CHECKLIST1
03/05/2026340922586Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET1
01/22/2026340922586Open ↗
▸BISADDITIONAL INFORMATION1
01/22/2026340922586Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
01/22/2026340922586Open ↗
▸Other Documents9
▸DOB NOWPlot Diagram2
08/17/2026B01289920-I1Open ↗
08/14/2026B01289920-S4Open ↗
▸DOB NOWSite Survey: Initial2
08/17/2026B01289920-I1Open ↗
08/14/2026B01289920-S4Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/17/2026B01289920-I1Open ↗
08/14/2026B01289920-S4Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
03/05/2026340922586Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
03/05/2026340922586Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026B01289920-I1Open ↗