← Back
Primarily 2 family with 1 store or office
724 AVENUE U
BROOKLYN · BIN 3193092
💬 Discuss this project
1931Year Built
2Stories
S2Building Class
R6AZoning
2,336 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · 1,883 sf lot · 1.24 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Floor 23p · 1 filing · 6 docs
Floor 1
Nothing on file for this building.
Building Lifecycle
All (12)Filed (2)Permit Issued (2)Signed Off (2)Violation (3)Inspection (3)
06/04/2025
Signed off — Alteration
Interior renovation of 2nd floor with partition work, ceiling and flooring. Build new stair in the rear to rear yard. No change in use, egress and occupancy
B00968960-I1
06/03/2025
Signed off — Alteration
Interior renovation of 2nd floor with partition work, ceiling and flooring. Build new stair in the rear to rear yard. No change in use, egress and occupancy
B00968960-S1
11/08/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/15/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/13/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/01/2024
Permit issued — Plumbing
B00968960-S1-PL
02/07/2024
Permit issued — General Construction
B00968960-I1-GC
12/11/2023
Filed — Alteration
Interior renovation of 2nd floor with partition work, ceiling and flooring. Build new stair in the rear to rear yard. No change in use, egress and occupancy
B00968960-S1
12/01/2023
Filed — Alteration
Interior renovation of 2nd floor with partition work, ceiling and flooring. Build new stair in the rear to rear yard. No change in use, egress and occupancy
B00968960-I1
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MW PROFESSIONAL ENGINEERING, P.C.212/11/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DBC INTERIOR INCGeneral Contractor107/08/2026
FLUSHING PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MW PROFESSIONAL ENGINEERI570112/01/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFLUSHING PLUMBING CORP03/01/2024
DOB NOWGeneral ConstructionSigned-offDBC INTERIOR02/07/2024
BISFPISSUEDPROTECTION SYSTEM SPEC. INC04/23/1993
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/08/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/15/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/13/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/26/2026B00968960-S1Request digital key ↗
08/26/2026B00968960-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B00968960-I1Open ↗
08/13/2026B00968960-S1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B00968960-I1Open ↗
08/13/2026B00968960-S1Open ↗