BuildNYC
Two family frame
7243 HILLMEYER AVENUE
QUEENS · BIN 4623333
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R4-1Zoning
2,142 sfGross Floor Area
2Units
Two family frame · Owner of record: New Property 888 · 2,500 sf lot · 0.86 FAR built · Flood zone AE
Locations of Work
MechanicalPlumbingFire ProtectionEquipmentCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 3Water heating and thermostat controls13p · 2 filings · 14 docs
Floor 2Water heating and thermostat controls13p · 2 filings · 14 docs
Floor 1Water heating and thermostat controls13p · 3 filings · 16 docs
Site & exteriorTemporary plywood fence installation2p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
United Developers2007/08/2026
Arverne Bay103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/16/2024$850K—AVERNE BAY LLC → NEW PROPERTY 888 LLC$397/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Sideris Kefalas Engineers304/26/2023
Pirooz Engineering206/16/2022
Leonard J. Strandberg & Assocaites103/15/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Royal T&E203/21/2026
Pirooz Engineering P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kaieteur ConstructionGeneral Contractor403/21/2026
Kaieteur ConstructionScaffold207/08/2026
SKY ElectricElectrical103/22/2026
Infiniti Esc PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP Concrete Testing and I6252304/26/2023
Pirooz Engineering7177404/26/2023
Building Lifecycle
10/10/2023
Signed off — Alteration
Installation of sprinkler system (with less than 30 heads) and also plumbing fixtures and plumbing piping for new 2-family building. Filed in conjunction with New Building #440646936.
Q00563563-I1
08/23/2023
Elevator Category 1 inspection report filed
08/23/2023
Elevator Category 5 inspection report filed
08/01/2023
Signed off — Alteration
Q00482439-I1
07/31/2023
Signed off — Alteration
Application filed for mechanical work type in conjunction with new building job # 440646936
Q00693359-I1
33 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offKaieteur Construction06/26/2023
DOB NOWCurb CutSigned-offKaieteur Construction04/24/2023
DOB NOWConstruction FenceSigned-offKaieteur Construction03/07/2023
DOB NOWPlumbingSigned-offInfiniti Esc Plumbing07/08/2022
DOB NOWConstruction FenceSigned-offKaieteur Construction05/30/2022
BIS—ISSUEDJ&J Designs09/14/2022
BIS—ISSUEDKaieteur Construction08/01/2022
BIS—ISSUEDKaieteur Construction08/01/2022
1 project · most recent 06/17/2023
General Wiring
FiledStatusContractorScope
06/17/2023CompleteSKY ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/20/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
11/10/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/10/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/10/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/26/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/26/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
06/09/2022Lowest Floor ElevationPIROOZ SOLTANIZADEHprogress
06/09/2022Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)PIROOZ SOLTANIZADEHspecial
06/06/2022Maintenance informationPIROOZ SOLTANIZADEHenergy_progress
06/06/2022HVAC-R and service water piping design and insulationPIROOZ SOLTANIZADEHenergy_progress
06/06/2022HVAC-R and service water heating system controlsPIROOZ SOLTANIZADEHenergy_progress
06/06/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
06/06/2022HVAC-R and service water heating equipmentPIROOZ SOLTANIZADEHenergy_progress
06/06/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesINDARDEO PARBHUNATHspecial
03/07/2022FinalJAN PEREZprogress
03/07/2022Mechanical SystemsPIROOZ SOLTANIZADEHspecial
104 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account