Four families
725 53 STREET
BROOKLYN · BIN 3014126
💬 Discuss this project
1908Year Built
2Stories
C3Building Class
R6BZoning
2,400 sfGross Floor Area
4Units
Rent Stabilized4 Open Violations 2 unresolved · 2 paperwork only ▸FDNY Report ↗
Four families · 2,003 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof11p · 2 filings · 20 docs
Floor 39p · 1 filing · 20 docs
Floor 212p · 2 filings · 20 docs
Floor 110p · 2 filings · 20 docs
Cellar10p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRI BOROUGH SCAFFOLDING307/08/2026
JABBIE INDUSTRIES INCORP203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
VIBEN BUILDING2803/21/2026
BROOKLYN SOLARWORKS103/21/2026
Rigid Structural Design, LLC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JABBIE INDUSTRIES INCORP*General Contractor907/08/2026
5D ARCHITECT AND ENGINEERGeneral Contractor603/21/2026
CASE PLUMBING LLCFire Protection307/08/2026
CATMAN PLUMBING INCPlumbing307/08/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor203/21/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244904/11/2024
Building Lifecycle
All (142)Filed (16)Permit Issued (15)Signed Off (9)Violation (15)Inspection (9)Objection (48)Special Inspection (30)
04/20/2026
Violation issued (ECB, open)
Construction
04/20/2026
Violation issued (ECB, open)
Unknown
04/20/2026
Violation issued (ECB, open)
Construction
04/20/2026
Violation issued (ECB, open)
Construction
06/06/2025
Violation issued (HPD, closed)
A
11/27/2024
Violation issued (HPD, closed)
I
04/15/2024
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OROCCUPANCY.
B00968674-I1
04/11/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT ON A 2 STORY BUILDING.OBTAIN NEW C OF O.
B00640596-P3
04/11/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
04/11/2024
Special inspection requirement — Exterior lighting power
NARESH MAHANGU
04/11/2024
Special inspection requirement — Concrete - Cast-In-Place
NARESH MAHANGU
04/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
04/11/2024
Special inspection requirement — Interior lighting power
NARESH MAHANGU
04/11/2024
Special inspection requirement — Permanent certificate
NARESH MAHANGU
04/11/2024
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
04/11/2024
Special inspection requirement — Fire-Resistance Rated Construction
NARESH MAHANGU
04/11/2024
Special inspection requirement — Metering
NARESH MAHANGU
04/11/2024
Special inspection requirement — Fenestration air leakage
NARESH MAHANGU
04/11/2024
Special inspection requirement — Chimneys and vents
NARESH MAHANGU
04/11/2024
Special inspection requirement — Protection of exposed foundation insulation
NARESH MAHANGU
04/11/2024
Special inspection requirement — Air barrier — testing
NARESH MAHANGU
04/11/2024
Special inspection requirement — Masonry
NARESH MAHANGU
04/11/2024
Special inspection requirement — Maintenance information
NARESH MAHANGU
04/11/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
NARESH MAHANGU
04/11/2024
Special inspection requirement — Lighting in dwelling units
NARESH MAHANGU
04/11/2024
Special inspection requirement — Lighting controls
NARESH MAHANGU
04/11/2024
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
04/11/2024
Special inspection requirement — Fenestration areas
NARESH MAHANGU
04/11/2024
Special inspection requirement — Insulation placement and R values
NARESH MAHANGU
04/08/2024
Violation issued (HPD, closed)
A
03/25/2024
Signed off — Alteration
FILE SPRINKLER WORK IN CONJUNCTION WITH CO ALT JOB#B00640596.INSTALL SPRINKLER SYSTEMS AT CELLAR 1ST THRU 3RD FLOOR AND ROOF.
B00677349-I1
03/21/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/14/2024
Signed off — Alteration
FILE BOILER WORK TYPE IN CONJUNCTION WITH PLUMBING WORK JOB#B00764541-I1. NEW BOILER AT ROOF.
B00764541-I1
03/13/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/23/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/16/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/05/2024
Permit issued — Sprinklers
B26905265-I1-EW-SP
01/03/2024
Permit issued — Sprinklers
B40497215-I1-EW-SP
01/03/2024
Permit issued — Sprinklers
B00677349-I1-EW-SP
12/19/2023
Permit issued — Solar
B00968674-I1-SL
12/15/2023
Objection resolved — Addressed
12/15/2023
Objection resolved — Addressed
12/12/2023
Objection raised — Other
12/12/2023
Objection raised — Other
12/06/2023
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OROCCUPANCY.
B00968674-I1
11/28/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
11/28/2023
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
11/28/2023
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
11/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
11/28/2023
Special inspection requirement — Final
NARESH MAHANGU
11/21/2023
Violation issued (HPD, closed)
I
10/06/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/12/2023
Signed off — Alteration
INSTALL CONSTRUCTION WOOD FENCE AT OPEN SPACE.
B00758275-I1
08/30/2023
Signed off — Alteration
FILE BOILER WORK TYPE IN CONJUNCTION WITH PLUMBING WORK JOB#B00764541-I1. NEW BOILER AT ROOF.
B00764541-S1
08/30/2023
Signed off — Alteration
FILE BOILER WORK TYPE IN CONJUNCTION WITH PLUMBING WORK JOB#B00764541-I1. NEW BOILER AT ROOF.
B00764541-S2
07/25/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/24/2023
Permit issued — Boiler Equipment
B00764541-S2-BE
07/20/2023
Filed — Alteration
FILE BOILER WORK TYPE IN CONJUNCTION WITH PLUMBING WORK JOB#B00764541-I1. NEW BOILER AT ROOF.
B00764541-S2
07/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
JIE ZHU
07/20/2023
Special inspection requirement — HVAC-R and service water heating system controls
JIE ZHU
Latest 60 of 142 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offS & L PLUMBING INC01/05/2024
DOB NOWSprinklersSigned-offS & L PLUMBING INC01/03/2024
DOB NOWSprinklersSigned-offS & L PLUMBING INC01/03/2024
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC12/19/2023
DOB NOWBoiler EquipmentSigned-offCATMAN PLUMBING INC07/24/2023
DOB NOWBoiler EquipmentSigned-offCATMAN PLUMBING INC07/07/2023
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC04/10/2023
DOB NOWGeneral ConstructionPermit Issued5D ARCHITECT AND ENGINEER03/15/2023
DOB NOWConstruction FenceSigned-off5D ARCHITECT AND ENGINEER03/14/2023
DOB NOWGeneral ConstructionPermit IssuedJABBIE INDUSTRIES INCORP*12/13/2022
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING11/30/2022
DOB NOWGeneral ConstructionPermit IssuedJABBIE INDUSTRIES INCORP*10/06/2022
DOB NOWSupport of ExcavationSigned-offJABBIE INDUSTRIES INCORP*09/08/2022
DOB NOWEarth WorkSigned-offJABBIE INDUSTRIES INCORP*08/29/2022
DOB NOWConstruction FenceSigned-offJABBIE INDUSTRIES INCORP*08/15/2022
2 projects · most recent 11/29/2023
General Wiring
FiledStatusContractorScope
11/29/2023CompleteBROOKYLN SOLARWORKS, LLC—
03/02/2023CompleteA.C. MORGAN ELECTRICGeneral Wiring
1 project · most recent 04/11/2024
FiledStatusContractorScope
04/11/2024Permit Issued5D ARCHITECT AND ENGINEER1 scope_items
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
03/21/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/23/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/16/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/06/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/25/2023Pass-Final Boiler Equipment InspectionPassView ↗
04/19/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/22/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 73
DateRequirementInspectorRole
04/11/2024Insulation placement and R valuesNARESH MAHANGUenergy_progress
04/11/2024Exterior lighting powerNARESH MAHANGUenergy_progress
04/11/2024Concrete - Cast-In-PlaceNARESH MAHANGUspecial
04/11/2024Chimneys and ventsNARESH MAHANGUspecial
04/11/2024Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
04/11/2024MasonryNARESH MAHANGUspecial
04/11/2024Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
04/11/2024Energy Code Compliance InspectionsNARESH MAHANGUprogress
04/11/2024Fire-Resistance Rated ConstructionNARESH MAHANGUprogress
04/11/2024MeteringNARESH MAHANGUenergy_progress
04/11/2024Fenestration air leakageNARESH MAHANGUenergy_progress
04/11/2024Permanent certificateNARESH MAHANGUenergy_progress
04/11/2024Air barrier — testing NARESH MAHANGUenergy_progress
04/11/2024Protection of exposed foundation insulationNARESH MAHANGUenergy_progress
04/11/2024Interior lighting powerNARESH MAHANGUenergy_progress
04/11/2024Maintenance informationNARESH MAHANGUenergy_progress
04/11/2024Fenestration and door U-factor and product ratingsNARESH MAHANGUenergy_progress
04/11/2024Lighting in dwelling unitsNARESH MAHANGUenergy_progress
04/11/2024Lighting controlsNARESH MAHANGUenergy_progress
04/11/2024Air barrier - visual inspectionNARESH MAHANGUenergy_progress
04/11/2024Fenestration areasNARESH MAHANGUenergy_progress
11/28/2023Air barrier - visual inspectionNARESH MAHANGUenergy_progress
11/28/2023Energy Code Compliance InspectionsNARESH MAHANGUprogress
11/28/2023Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
11/28/2023Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
Latest 25 of 73.
▾Documents — 99 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/29/2026B00764541-P3Request digital key ↗
08/29/2026B00764541-S1Request digital key ↗
08/29/2026B00764541-P2Request digital key ↗
Showing 3 of 16 on file for this type
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026B00640596-P3Open ↗
08/13/2026B00640596-P2Open ↗
08/13/2026B00640596-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026B00640596-P1Open ↗
08/13/2026B00640596-P3Open ↗
08/13/2026B00640596-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00640596-I1Open ↗
▸Seals & Professional Certifications43
▸DOB NOWProgress Inspector Seal & Signature17
09/23/2026B00764541-S2Open ↗
09/23/2026B00764541-S1Open ↗
09/01/2026B00764541-P2Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/29/2026B00759717-I1Open ↗
08/29/2026B00764541-P1Open ↗
08/29/2026B00764541-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026B00764541-P2Open ↗
08/31/2026B00677349-I1Open ↗
08/28/2026B00640596-P3Open ↗
Showing 3 of 10 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026B00640596-P3Open ↗
08/13/2026B00640596-P1Open ↗
08/13/2026B00640596-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00640596-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00640596-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00640596-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026B00640596-P3Open ↗
08/25/2026B00640596-P1Open ↗
08/25/2026B00640596-P2Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00764541-I1Open ↗
08/13/2026B00640596-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B00968674-I1Open ↗
▸Other Documents16
▸DOB NOWSite Survey: Initial4
08/13/2026B00640596-P2Open ↗
08/13/2026B00640596-P3Open ↗
08/13/2026B00640596-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026B00640596-P1Open ↗
08/13/2026B00640596-P3Open ↗
08/13/2026B00640596-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/25/2026B00640596-P3Open ↗
08/25/2026B00640596-P2Open ↗
08/25/2026B00640596-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/14/2026B00759717-I1Open ↗
08/13/2026B00759784-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00640596-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00640596-I1Open ↗