← Back
One family attached or semi-detached
725 HUMBOLDT STREET
BROOKLYN · BIN 3066368
💬 Discuss this project
1899Year Built
3Stories
A5Building Class
R6BZoning
3,360 sfGross Floor Area
1Units
Rent Stabilized14 Open Violations ▸FDNY Report ↗
One family attached or semi-detached · 2,000 sf lot · 1.68 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof3p · 2 filings · 20 docs
Floor 322p · 2 filings · 20 docs
Floor 221p · 2 filings · 20 docs
Floor 120p · 1 filing · 20 docs
Cellar28p · 4 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/12/2019$1.8M—Private party → Private party$536/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PALETTE ARCHITECTURE410/31/2024
RAAD710/01/2024
IVAN DESIGN ENG. ANALYSIS, PLLC208/22/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BIG ORANGE EXPEDITING1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CLIFFSIDE HOME IMPROV COGeneral Contractor1607/08/2026
ROCK E SMALL PLBG&HTG INCPlumbing407/08/2026
JEFF P WANDERSMANElectrical103/21/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAAD7727710/01/2024
IVAN DESIGN ENGINEERING &6983208/22/2022
Building Lifecycle
All (136)Filed (13)Permit Issued (12)Signed Off (5)Violation (17)Inspection (11)Objection (48)Special Inspection (30)
05/05/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
06/10/2025
Violation issued (HPD, open)
A
02/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/05/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/27/2024
Violation issued (HPD, open)
I
10/31/2024
Filed — Alteration CO
The project is the interior renovation and facade replacement of the building. Change to co requested.
B00534880-P2
10/31/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Jeff Wandersman
10/31/2024
Special inspection requirement — Lighting in dwelling units
Jeff Wandersman
10/31/2024
Special inspection requirement — Interior lighting power
Jeff Wandersman
10/31/2024
Special inspection requirement — Exterior lighting power
Jeff Wandersman
10/31/2024
Special inspection requirement — Fire-Resistance Rated Construction
Jeff Wandersman
10/31/2024
Special inspection requirement — Fenestration air leakage
Jeff Wandersman
10/31/2024
Special inspection requirement — Lighting controls
Jeff Wandersman
10/31/2024
Special inspection requirement — Insulation placement and R values
Jeff Wandersman
10/29/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/21/2024
Signed off — Alteration
Installation of new HVAC systems
B00547923-I1
10/21/2024
Signed off — Alteration
NEW PLUMBING SYSTEM TO SERVE NEW ARCHITECTURAL LAYOUT (NEW BATHROOMS, WATER HEATERS AND PLUMBING PIPING)
B00547960-I1
10/21/2024
Signed off — Alteration
NEW SPRINKLER SYSTEM
B00652488-I1
10/01/2024
Filed — Alteration
Installation of new HVAC systems
B00547923-P1
10/01/2024
Special inspection requirement — HVAC-R and service water heating equipment
NICHOLAS AZADIAN
10/01/2024
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS AZADIAN
10/01/2024
Special inspection requirement — HVAC-R and service water heating system controls
NICHOLAS AZADIAN
10/01/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
NICHOLAS AZADIAN
10/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NICHOLAS AZADIAN
10/01/2024
Special inspection requirement — Mechanical Systems
NICHOLAS AZADIAN
10/01/2024
Special inspection requirement — Final
NICHOLAS AZADIAN
09/06/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/04/2024
Signed off — Alteration
B00554349-I1
08/21/2024
Signed off — Alteration
CONSTRUCTION OF 8' HIGH CONSTRUCTION FENCE.PLYWOOD ON POSTS ANCHORED TO CONCRETE SIDEWALK. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B08021118-I1
07/09/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/02/2024
Permit issued — Plumbing
B00547960-I1-PL
06/27/2024
Permit issued — Mechanical Systems
B00547923-I1-MS
04/10/2024
Violation issued (HPD, open)
A
01/22/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/18/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/21/2023
Violation issued (HPD, open)
I
10/16/2023
Permit issued — General Construction
B00534880-I1-GC
10/16/2023
Permit issued — General Construction
B00554349-I1-GC-CX
10/16/2023
Permit issued — Construction Fence
B08021118-I1-FN
10/04/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/04/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/04/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/04/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/28/2023
Filed — Alteration
NEW PLUMBING SYSTEM TO SERVE NEW ARCHITECTURAL LAYOUT (NEW BATHROOMS, WATER HEATERS AND PLUMBING PIPING)
B00547960-P2
09/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NICHOLAS AZADIAN
09/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
NICHOLAS AZADIAN
09/25/2023
Filed — Alteration
NEW SPRINKLER SYSTEM
B00652488-P1
09/22/2023
Special inspection requirement — Sprinkler Systems
NICHOLAS AZADIAN
07/07/2023
Permit issued — Sprinklers
B00652488-I1-EW-SP
05/09/2023
Permit issued — Plumbing
B00547960-I1-PL
04/27/2023
Permit issued — Foundation
B00554349-I1-GC-CX
04/24/2023
Permit issued — General Construction
B00534880-I1-GC
03/27/2023
Violation issued (ECB, closed)
Construction
03/27/2023
Violation issued (ECB, closed)
Construction
03/23/2023
Violation issued (HPD, open)
A
11/15/2022
Permit issued — Construction Fence
B08021118-I1-FN
11/10/2022
Violation issued (HPD, open)
I
10/17/2022
Objection raised — Inspections
10/17/2022
Objection resolved — Addressed
Latest 60 of 136 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC07/02/2024
DOB NOWMechanical SystemsSigned-offCLIFFSIDE HOME IMPROV06/27/2024
DOB NOWGeneral ConstructionPermit IssuedCLIFFSIDE HOME IMPROV10/16/2023
DOB NOWGeneral ConstructionSigned-offCLIFFSIDE HOME IMPROV10/16/2023
DOB NOWConstruction FenceSigned-offCLIFFSIDE HOME IMPROV10/16/2023
DOB NOWSprinklersSigned-offA M B MECHANICAL INC07/07/2023
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC05/09/2023
DOB NOWFoundationSigned-offCLIFFSIDE HOME IMPROV04/27/2023
DOB NOWGeneral ConstructionPermit IssuedCLIFFSIDE HOME IMPROV04/24/2023
DOB NOWConstruction FenceSigned-offCLIFFSIDE HOME IMPROV11/15/2022
DOB NOWFoundationSigned-offCLIFFSIDE HOME IMPROV04/29/2022
DOB NOWGeneral ConstructionPermit IssuedCLIFFSIDE HOME IMPROV04/29/2022
1 project · most recent 07/21/2023
General Wiring
FiledStatusContractorScope
07/21/2023CompleteC & A ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
02/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/05/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/06/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/22/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/18/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/04/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/04/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/04/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/04/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
10/31/2024Fenestration and door U-factor and product ratingsJeff Wandersmanenergy_progress
10/31/2024Lighting in dwelling unitsJeff Wandersmanenergy_progress
10/31/2024Interior lighting powerJeff Wandersmanenergy_progress
10/31/2024Exterior lighting powerJeff Wandersmanenergy_progress
10/31/2024Fire-Resistance Rated ConstructionJeff Wandersmanprogress
10/31/2024Fenestration air leakageJeff Wandersmanenergy_progress
10/31/2024Lighting controlsJeff Wandersmanenergy_progress
10/31/2024Insulation placement and R valuesJeff Wandersmanenergy_progress
10/01/2024HVAC-R and service water heating equipmentNICHOLAS AZADIANenergy_progress
10/01/2024Energy Code Compliance InspectionsNICHOLAS AZADIANprogress
10/01/2024HVAC-R and service water heating system controlsNICHOLAS AZADIANenergy_progress
10/01/2024HVAC-R and service water piping design and insulationNICHOLAS AZADIANenergy_progress
10/01/2024Fire-Resistant Penetrations and JointsNICHOLAS AZADIANspecial
10/01/2024Mechanical SystemsNICHOLAS AZADIANspecial
10/01/2024FinalNICHOLAS AZADIANprogress
09/28/2023Fire-Resistant Penetrations and JointsNICHOLAS AZADIANspecial
09/28/2023HVAC-R and service water piping design and insulationNICHOLAS AZADIANenergy_progress
09/22/2023Sprinkler SystemsNICHOLAS AZADIANspecial
09/12/2022Subsurface Investigations (Borings/Test Pits)MICHAEL KARANTINIDIS, P.E.special
09/12/2022Concrete - Cast-In-PlaceIvan Lukspecial
09/12/2022Subgrade InspectionsIvan Lukspecial
09/12/2022Structural Steel - High Strength BoltingIvan Lukspecial
09/12/2022Structural Steel - DetailsIvan Lukspecial
09/12/2022Helical Piles Foundation (BB # 2014-020)GUERMAN VAINBLATspecial
09/12/2022MasonryIvan Lukspecial
Latest 25 of 58.
▾Documents — 96 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
09/01/2026B00547923-I1Request digital key ↗
09/01/2026B00547923-P1Request digital key ↗
09/01/2026B00547960-P1Request digital key ↗
Showing 3 of 13 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00534880-I1Open ↗
▸Seals & Professional Certifications58
▸DOB NOWSpecial Inspector Seal & Signature27
08/29/2026B00554349-I1Open ↗
08/29/2026B00554349-I1Open ↗
08/29/2026B00554349-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
08/29/2026B00554349-I1Open ↗
08/29/2026B00554349-I1Open ↗
08/29/2026B00554349-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/01/2026B00547923-P1Open ↗
09/01/2026B00547923-I1Open ↗
09/01/2026B00547960-P1Open ↗
Showing 3 of 13 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/13/2026B00534880-I1Open ↗
08/13/2026B00534880-P2Open ↗
08/13/2026B00534880-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00534880-I1Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/01/2026B00547923-I1Open ↗
09/01/2026B00547923-P1Open ↗
09/01/2026B00547960-I1Open ↗
Showing 3 of 12 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00547960-I1Open ↗
08/13/2026B00547923-I1Open ↗
08/13/2026B00534880-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026B00554349-I1Open ↗
08/13/2026B00554349-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00554349-I1Open ↗
▸Other Documents2
▸DOB NOWFinal Survey1
08/13/2026B00534880-I1Open ↗
▸DOB NOWTR5H Test Report1
08/13/2026B00554349-I1Open ↗