← Back
General warehouse
725 MCDONALD AVENUE
BROOKLYN · BIN 3348192
💬 Discuss this project
1930Year Built
1Stories
E1Building Class
M1-1Zoning
29,375 sfGross Floor Area
4Units
LL97 Covered2 Open Violations ▸FDNY Report ↗
General warehouse · Owner of record: TRAINWORLD ASSOCIATES LLC · 29,375 sf lot · 1 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRAINWORLD ASSOCIATES LLC103/22/2026
BLUM ASSOCIATES203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THINK DESIGN ARCHITECTURE411/15/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
THINK DESIGN ARCHITECTURE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CICCARELLI & ASSOCIATES *General Contractor303/21/2026
MORPAT CLIMATE CORPGeneral Contractor203/21/2026
VOLPONI, THOMASElectrical103/21/2026
AMIN, BINITElectrical103/21/2026
FERNANDEZ HTG & MECH CORP.Plumbing107/08/2026
BIG APPLE FIRE SPRKL CO IFire Protection107/08/2026
J BALAZ & ASSOCIATES LTDElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THINK DESIGN ARCHITECTURA683411/15/2024
Building Lifecycle
All (37)Filed (4)Permit Issued (4)Signed Off (3)Violation (10)Inspection (7)Special Inspection (9)
01/23/2025
Violation issued (FDNY_NOV, closed)
01/13/2025
Signed off — Alteration
Application is filed to install new gas service & meter, modify exist gas piping and replace mechanical units within tenant space as per plan filed herewith. No change in use, egress or occupancy filed under this application.
B08015153-I1
01/13/2025
Signed off — Alteration
Application is filed to install new gas service & meter, modify exist gas piping and replace mechanical units within tenant space as per plan filed herewith. No change in use, egress or occupancy filed under this application.
B08015153-S2
11/22/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frank Martarella III
11/15/2024
Filed — Alteration
Application is filed to install new gas service & meter, modify exist gas piping and replace mechanical units within tenant space as per plan filed herewith. No change in use, egress or occupancy filed under this application.
B08015153-P1
11/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frank Martarella III
11/07/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/22/2024
Permit issued — Plumbing
B08015153-S2-PL
12/04/2023
Filed — Alteration
Application is filed to install new gas service & meter, modify exist gas piping and replace mechanical units within tenant space as per plan filed herewith. No change in use, egress or occupancy filed under this application.
B08015153-S2
10/02/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/14/2023
Signed off — Alteration
APPLICATION IS FILED FOR THE MODIFICATION TO EXISTING SPRINKLER SYSTEM.
B08015155-I1
03/08/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/01/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/16/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/12/2022
Permit issued — General Construction
B08015153-I1-GC
11/14/2022
Permit issued — Sprinklers
B08015155-I1-EW-SP
10/31/2022
Permit issued — General Construction
B08015153-I1-MS
10/20/2022
Filed — Alteration
Application is filed to install new gas service & meter, modify exist gas piping and replace mechanical units within tenant space as per plan filed herewith. No change in use, egress or occupancy filed under this application.
B08015153-I1
10/20/2022
Filed — Alteration
APPLICATION IS FILED FOR THE MODIFICATION TO EXISTING SPRINKLER SYSTEM.
B08015155-I1
10/05/2022
Special inspection requirement — Interior lighting power
Frank Martarella III
10/05/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frank Martarella III
10/05/2022
Special inspection requirement — Energy Code Compliance Inspections
Frank Martarella III
10/05/2022
Special inspection requirement — Energy Code Compliance Inspections
Frank Martarella III
10/04/2022
Special inspection requirement — Final
Frank Martarella III
10/04/2022
Special inspection requirement — Mechanical Systems
Frank Martarella III
10/04/2022
Special inspection requirement — Sprinkler Systems
Frank Martarella III
12/01/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/27/2013
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFERNANDEZ HTG & MECH CORP.07/22/2024
DOB NOWGeneral ConstructionSigned-offCICCARELLI & ASSOCIATES *12/12/2022
DOB NOWSprinklersSigned-offBIG APPLE FIRE SPRKL CO I11/14/2022
DOB NOWGeneral ConstructionSigned-offMORPAT CLIMATE CORP10/31/2022
BIS—ISSUEDOWNER07/29/2005
BIS—ISSUEDOWNER07/29/2005
BIS—ISSUEDOWNER07/29/2005
BIS—ISSUEDTRAINLAND INC.02/27/1997
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
11/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/07/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/02/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/08/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/01/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
11/19/2024Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
11/13/2024Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
10/05/2022Interior lighting powerFrank Martarella IIIenergy_progress
10/05/2022Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
10/05/2022Energy Code Compliance InspectionsFrank Martarella IIIprogress
10/05/2022Energy Code Compliance InspectionsFrank Martarella IIIprogress
10/04/2022FinalFrank Martarella IIIprogress
10/04/2022Mechanical SystemsFrank Martarella IIIspecial
10/04/2022Sprinkler SystemsFrank Martarella IIIspecial
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/28/2026B08015155-I1Request digital key ↗
08/28/2026B08015153-I1Request digital key ↗
08/28/2026B08015153-S2Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/28/2026B08015155-I1Open ↗
08/28/2026B08015153-I1Open ↗
08/28/2026B08015153-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/20/2026B08015153-P1Open ↗
09/02/2026B08015153-I1Open ↗
08/26/2026B08015153-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026B08015153-I1Open ↗
09/02/2026B08015153-I1Open ↗
08/23/2026B08015155-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/28/2026B08015155-I1Open ↗
08/28/2026B08015153-S2Open ↗
08/28/2026B08015153-P1Open ↗
Showing 3 of 4 on file for this type