ECB06/08/2026Atoi, wwop observe for the construction work being done without a permit for the second-floor and first floor. Work appears to be 40% done for the removal and installation of new partition with 2X4's wood throu$12K due
ECB06/08/2026Atoi, wwop observe for the plumbing work being done on the first and second floors, work appears to be 30% done for the hot and cold water lines installed with copper pipes for the bathrooms and kitchens also o$12K due
ECB06/08/2026Atoi, observe electrical work being installed without permits on file for the scope of work job appears to be 30% done for lights, outlets, light switches and panels for the first and second floors, obtain perm$12K due
ECB12/16/2024Failure to file required annual boiler inspection reports for low-pressure boiler 20000065136N0002 in accordance with the rules of the department. 1RCNY 103-01(d)(1) requires that an annual inspection report fo$2K due
Likely answered · the city's own records show a filing, but DOB's feed still lists these as active
DOB11/14/2025Violation issued-failure to file 2024 external low pressure inspectionThe owner has filed since: boiler inspection reports are on file for later years (latest 2025). This one is not shown as answered
DOB09/23/2024Violation issued-failure to file 2023 external low pressure inspectionThe owner has filed since: boiler inspection reports are on file for later years (latest 2025). This one is not shown as answered
Single or multiple dwelling with stores or offices · Owner of record: 725 Morris Park · 1,900 sf lot · 2.84 FAR built · Flood zone X