← Back
Condo, residential unit in elevator building
The 725 Riverside Condominium
725 RIVERSIDE DRIVE · BIN 1087465
💬 Discuss this project
1912Year Built
11Stories
R4Building Class
R8Zoning
75,753 sfGross Floor Area
74Units
LL97 CoveredRent Stabilized97 Open Violations ▸FISP: SWARMP
Condo, residential unit in elevator building · Owner of record: THE 725 RIVERSIDE CONDOMINUM · 11,176 sf lot · 6.78 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingEquipment
Permit Issued — active, not yet Signed-off
RoofUnder Construction6p · 3 filings · 20 docs
BulkheadUnder Construction1p · 1 filing · 5 docs
Floor 92p · 1 filing · 10 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELIABLE ENTERPRISES708/12/2026
725 RIVERSIDE CONDO2803/22/2026
THE 725 RIVERSIDE DR COND103/22/2026
JG CONTRACT INC103/22/2026
THE 725 RIVERSDIE CONDOMO103/22/2026
725 REALTY CO LLC903/22/2026
PINNACLE GROUP903/22/2026
725 RLTY CO; LLC MEIR BOU103/22/2026
725 RLTY LLC MEIR BOUSKIL103/22/2026
WIENER REALTY103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MERRITT ENGINEERING CONSULTANT DPC603/21/2026
A+ EXPEDITING403/21/2026
AE DESIGN SOLUTION203/21/2026
SANDEEP KAUR103/21/2026
A1 EXPEDITING SERVICE403/21/2026
DANICO SERVICES603/21/2026
SNR EXPEDITING DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JUNO CONTRACTING CORPGeneral Contractor507/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor408/12/2026
LAKHI GENERAL CONTRACTORGeneral Contractor307/08/2026
PHOENIX SUTTON STR INCGeneral Contractor307/08/2026
JORDAN, JOSEPHElectrical203/21/2026
MNR GROUP INCGeneral Contractor203/21/2026
MNR RESTORATION GROUP INCGeneral Contractor209/13/2026
VAN KLEECK, ADAMElectrical203/21/2026
TODARO JOSEPHElectrical103/21/2026
K.N.C ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SPECIAL TESTING & CONSULT1688307/29/2026
SONI ENGINEERING CONSULTI9819110/20/2025
DEAN MENDEZ ARCHITECT, P.8621208/01/2025
MERRITT ENGINEERING CONSU460208/09/2024
AP PROFESSIONAL ENGINEERI5974108/01/2024
Building Lifecycle
All (173)Filed (17)Permit Issued (18)Signed Off (3)Facade (FISP) (21)Violation (60)Objection (27)Special Inspection (27)
09/11/2026
Permit issued — Structural
M01398134-I1-ST
08/18/2026
Special inspection requirement — Structural Steel - Welding
SEBASTIAN SETTEDUCATE JR., P.E
08/18/2026
Special inspection requirement — Final
Paul Perdek
08/18/2026
Special inspection requirement — Structural Steel - Details
SEBASTIAN SETTEDUCATE JR., P.E
08/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBASTIAN SETTEDUCATE JR., P.E
08/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/11/2026
Permit issued — Sidewalk Shed
M01199669-I1-SH
07/29/2026
Filed — Alteration
INSTALLATION OF TEMPORARY WATER TANK SHORING AS PER PLANS. TEMPORARY WATER TANK SHORING IS FILED IN CONJUNCTION WITH PERMIT #M01247727. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01398134-P1
06/30/2026
Violation issued (HPD, open)
B
06/30/2026
Violation issued (HPD, open)
C
06/01/2026
Violation issued (HPD, open)
A
06/01/2026
Violation issued (HPD, open)
A
06/01/2026
Violation issued (HPD, open)
A
06/01/2026
Violation issued (HPD, open)
A
06/01/2026
Violation issued (HPD, open)
A
06/01/2026
Violation issued (HPD, open)
A
06/01/2026
Violation issued (HPD, open)
C
06/01/2026
Violation issued (HPD, open)
C
06/01/2026
Violation issued (HPD, open)
C
06/01/2026
Violation issued (HPD, open)
B
06/01/2026
Violation issued (HPD, open)
C
06/01/2026
Violation issued (HPD, open)
B
06/01/2026
Violation issued (HPD, open)
B
06/01/2026
Violation issued (HPD, open)
C
06/01/2026
Violation issued (HPD, open)
A
06/01/2026
Violation issued (HPD, open)
B
06/01/2026
Violation issued (HPD, open)
C
06/01/2026
Violation issued (HPD, open)
C
06/01/2026
Violation issued (HPD, open)
C
06/01/2026
Violation issued (HPD, open)
A
06/01/2026
Violation issued (HPD, open)
C
06/01/2026
Violation issued (HPD, open)
C
06/01/2026
Violation issued (HPD, open)
A
06/01/2026
Violation issued (HPD, open)
B
06/01/2026
Violation issued (HPD, open)
A
06/01/2026
Violation issued (HPD, open)
A
06/01/2026
Violation issued (HPD, open)
B
06/01/2026
Violation issued (HPD, open)
C
06/01/2026
Violation issued (HPD, open)
A
06/01/2026
Violation issued (HPD, open)
C
06/01/2026
Violation issued (HPD, open)
A
05/27/2026
Filed — Alteration
INSTALLATION OF TEMPORARY WATER TANK SHORING AS PER PLANS. TEMPORARY WATER TANK SHORING IS FILED IN CONJUNCTION WITH PERMIT #M01247727. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01398134-I1
05/14/2026
Permit issued — Sidewalk Shed
M01199669-I1-SH
05/12/2026
Permit issued — Suspended Scaffold
M01303038-I1-SC
04/29/2026
Cycle 10 facade report submitted
04/29/2026
Cycle 10 facade report signed — UNSAFE
04/24/2026
Cycle 10 facade inspection completed
04/07/2026
Permit issued — Suspended Scaffold
M01303038-I1-SC
03/26/2026
Permit issued — General Construction
M01247727-I1-GC-CX
03/11/2026
Permit issued — Sidewalk Shed
M01199669-I1-SH
02/18/2026
Permit issued — Structural
M01247727-I1-GC-CX
02/09/2026
Violation issued (HPD, closed)
C
02/09/2026
Violation issued (HPD, open)
B
02/09/2026
Violation issued (HPD, closed)
C
02/09/2026
Violation issued (HPD, open)
A
02/09/2026
Violation issued (HPD, open)
B
02/09/2026
Violation issued (HPD, open)
B
02/09/2026
Violation issued (HPD, open)
B
02/09/2026
Violation issued (HPD, open)
A
02/09/2026
Violation issued (HPD, closed)
C
Latest 60 of 173 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedMNR RESTORATION GROUP INC09/11/2026
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC08/11/2026
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC05/14/2026
DOB NOWSuspended ScaffoldPermit IssuedMNR GROUP INC05/12/2026
DOB NOWSuspended ScaffoldPermit IssuedMNR GROUP INC04/07/2026
DOB NOWGeneral ConstructionPermit IssuedMNR RESTORATION GROUP INC03/26/2026
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC03/11/2026
DOB NOWStructuralPermit IssuedMNR GROUP INC02/18/2026
DOB NOWSuspended ScaffoldPermit IssuedMNR GROUP INC10/28/2025
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC04/03/2025
DOB NOWGeneral ConstructionSigned-offLAKHI GENERAL CONTRACTOR09/16/2024
DOB NOWSuspended ScaffoldPermit IssuedLAKHI GENERAL CONTR INC08/14/2024
DOB NOWSidewalk ShedSigned-offLAKHI GENERAL CONTRACTOR07/16/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedJUNO CONTRACTING03/25/2022
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC10/12/2021
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC10/15/2020
DOB NOWSupported ScaffoldPermit IssuedJUNO CONTRACTING02/03/2020
DOB NOWSupported ScaffoldPermit IssuedJUNO CONTRACTING05/08/2019
BISEQISSUEDPHOENIX SUTTON STR INC01/10/2023
BISOTISSUEDJUNO CONTRACTING CORP03/24/2022
BISEQISSUEDPHOENIX SUTTON STR INC01/11/2022
BISOTISSUEDJUNO CONTRACTING CORP03/25/2021
BISEQISSUEDPHOENIX SUTTON STR INC01/27/2021
BISOTISSUEDJUNO CONTRACTING CORP03/23/2020
BISOTISSUEDJUNO CONTRACTING CORP05/14/2019
BISEQISSUEDPHOENIX SUTTON STR INC07/13/2018
BISEQISSUEDJUNO CONTRACTING CORP05/08/2018
BISEQISSUEDJUNO CONTRACTING CORP04/04/2018
BISOTISSUEDJUNO CONTRACTING CORP03/27/2018
BISOTISSUEDJUNO CONTRACTING CORP01/17/2018
BISEQISSUEDPHOENIX SUTTON STR INC07/11/2017
BISPLISSUEDRRP PLUMBING CORP05/23/2017
BISEQISSUEDJUNO CONTRACTING CORP04/05/2017
BISOTISSUEDJUNO CONTRACTING CORP03/27/2017
BISOTISSUEDJUNO CONTRACTING CORP10/13/2016
BISEQISSUEDPHOENIX SUTT. STREET INC05/27/2016
BISPLISSUEDRRP PLUMBING CORP01/27/2016
BISOTISSUEDA TO Z GROUP NY LLC01/21/2016
BISEQISSUEDPHOENIX SUTT. STREET INC06/01/2015
BISOTISSUEDM-METRO CONSTRUCTION INC08/07/2012
+ 12 more permits on file
1 project · most recent 12/06/2024
Water/Sanitary
FiledStatusContractorScope
12/06/2024——Water/Sanitary
10 projects · most recent 03/17/2026
General Wiring
FiledStatusContractorScope
03/17/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
10/14/2025CompleteELECTRIC PARAMOUNT CONTGeneral Wiring
03/26/2025Permit IssuedRICHARD NEU—
12/16/2024CompleteA & S MASTER ELEC'L CORPGeneral Wiring
12/04/2024CompleteRJ ELECTRICAL CONTRACTORSGeneral Wiring
08/09/2024Permit IssuedK.N.C ELECTRIC INC—
04/17/2024CompleteOPTIMAL ELECTRIC, INCGeneral Wiring
02/01/2023Permit IssuedRONEY ELECTRIC INCGeneral Wiring
03/16/2022Permit IssuedGREEN POWER ELECTRIC CORPGeneral Wiring
07/02/2019CompletePW & SONS ELECTRICAL CORPGeneral Wiring
2 projects · most recent 07/29/2026
Steel
FiledStatusContractorScope
07/29/2026Permit IssuedMNR RESTORATION GROUP INC2 scope_items
08/01/2025Permit IssuedMNR RESTORATION GROUP INCSteel
2 projects · most recent 03/24/2025
Sidewalk Shed
FiledStatusContractorScope
03/24/2025Permit IssuedRELIABLE ENTERPRISES INCSidewalk Shed
08/11/2024Signed-offLAKHI GENERAL CONTRACTORSidewalk Shed
1 project · most recent 08/01/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
08/01/2024Permit Issued—Suspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
08/18/2026Structural Steel - WeldingSEBASTIAN SETTEDUCATE JR., P.Especial
08/18/2026FinalPaul Perdekprogress
08/18/2026Structural Steel - DetailsSEBASTIAN SETTEDUCATE JR., P.Especial
08/18/2026Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
08/18/2026Tenant Protection Plan Compliance—special
10/15/2025Alternative Materials - OTCR Buildings Bulletin Numbernayan sonispecial
10/15/2025Post-installed Anchorsnayan sonispecial
06/26/2025Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
06/26/2025Structural Steel - High Strength BoltingSEBASTIAN SETTEDUCATE JR., P.Especial
06/26/2025Structural Steel - WeldingSEBASTIAN SETTEDUCATE JR., P.Especial
06/26/2025MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
06/26/2025Tenant Protection Plan ComplianceDean Mendezspecial
06/26/2025Structural Steel - DetailsSEBASTIAN SETTEDUCATE JR., P.Especial
06/26/2025FinalChristopher Krepcioprogress
06/26/2025Energy Code Compliance InspectionsChristopher Krepcioprogress
06/26/2025Air barrier - visual inspectionChristopher Krepcioenergy_progress
11/22/2024Fire-Resistant Penetrations and Joints—special
08/09/2024Insulation placement and R valuesChristopher Krepcioenergy_progress
08/09/2024Tenant Protection Plan ComplianceDean Mendezspecial
08/09/2024MasonryChristopher Krepciospecial
08/09/2024Energy Code Compliance InspectionsChristopher Krepcioprogress
08/09/2024FinalChristopher Krepcioprogress
08/07/2024Tenant Protection Plan Compliance—special
08/02/2024Insulation placement and R valuesChristopher Krepcioenergy_progress
08/02/2024MasonryChristopher Krepciospecial
Latest 25 of 27.
▾Documents — 280 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch14
08/26/2026M01076474-I1Request digital key ↗
08/26/2026M01076474-P1Request digital key ↗
08/26/2026M01089097-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold3
09/05/2026M00159929-I1Request digital key ↗
09/03/2026M00413885-I1Request digital key ↗
08/15/2026M00413885-P1Request digital key ↗
▸Applications & Permits54
▸BISWORK PERMIT APPLICATION29
01/10/2023140353551Open ↗
01/12/2022140353551Open ↗
01/27/2021140353551Open ↗
Showing 3 of 29 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION25
03/31/2022122686744Open ↗
06/02/2021123195915Open ↗
07/12/2019140353551Open ↗
Showing 3 of 25 on file for this type
▸Seals & Professional Certifications61
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
05/25/2018123118072Open ↗
01/10/2018123195915Open ↗
12/07/2017123118072Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/05/2026M00159929-I1Open ↗
08/26/2026M01076474-I1Open ↗
08/26/2026M01077580-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026M01076474-I1Open ↗
09/01/2026M01076474-I1Open ↗
08/29/2026M01247727-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026M01303038-I1Open ↗
09/01/2026M01303038-I1Open ↗
09/01/2026M01076474-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
05/03/2018140762903Open ↗
04/19/2017123059484Open ↗
01/20/2016140451062Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
04/12/2017123059484Open ↗
02/13/2012120975659Open ↗
09/27/2011120822761Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
05/03/2018140762903Open ↗
01/20/2016140451062Open ↗
05/29/2015140353551Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
05/03/2018140762903Open ↗
01/20/2016140451062Open ↗
05/29/2015140353551Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
02/13/2012120975659Open ↗
09/27/2011120822761Open ↗
04/09/2010120317326Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING4
01/20/2016140451062Open ↗
12/27/2012120922261Open ↗
12/15/2011120922261Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
01/10/2018123195915Open ↗
06/21/2016140451062Open ↗
06/04/2016140451062Open ↗
▸BISSELF-CERT PLUMBING NOTICE3
04/01/2013120922261Open ↗
Showing 1 of 3 on file for this type
▸Safety & Tenant Protection8
▸BISTenant Protection Plan and Notes6
04/25/2019122686744Open ↗
01/10/2018123195915Open ↗
12/07/2017123118072Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026M00413885-P1Open ↗
08/13/2026M00413885-I1Open ↗
▸Environmental & Asbestos16
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
12/07/2017123118072Open ↗
04/12/2017123059484Open ↗
03/30/2016122686744Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
02/13/2012120975659Open ↗
04/09/2010120317326Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/05/2026M00159929-I1Open ↗
08/25/2026M01146385-S1Open ↗
08/25/2026M01146385-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/22/2026M01247727-I1Open ↗
08/13/2026M01076474-I1Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
05/25/2018123118072Open ↗
01/10/2018123195915Open ↗
12/07/2017123118072Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
05/25/2018123118072Open ↗
04/03/2013120922261Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/15/2023122686744Open ↗
01/20/2016140451062Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
05/29/2015140353551Open ↗
▸BISTR8: Energy Code Progress Inspections1
12/15/2011120922261Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/20/2016140451062Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
05/23/2023140353551Open ↗
02/15/2023122686744Open ↗
05/03/2018140762903Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs36
▸BISLETTERS - SUPPORTING DOCUMENTATION12
01/12/2022140353551Open ↗
01/27/2021140353551Open ↗
01/27/2021140353551Open ↗
Showing 3 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
05/25/2023140353551Open ↗
02/16/2023122686744Open ↗
05/25/2018123118072Open ↗
Showing 3 of 9 on file for this type
▸BISSHED LETTER6
01/10/2023140353551Open ↗
01/27/2021140353551Open ↗
07/24/2019140353551Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
02/13/2012120975659Open ↗
12/15/2011120922261Open ↗
09/27/2011120822761Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP Variance (V5) letter2
08/17/2026M01398134-I1Open ↗
08/13/2026M01247727-I1Open ↗
▸BISFINAL1
05/23/2023140353551Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026M01199669-I1Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT16
02/15/2023122686744Open ↗
03/30/2022122686744Open ↗
02/01/2022122686744Open ↗
Showing 3 of 16 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
01/20/2016140451062Open ↗
▸Filing & Intake Forms29
▸BISADDITIONAL INFORMATION13
05/25/2022122686744Open ↗
05/19/2022122686744Open ↗
05/09/2022122686744Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM6
01/10/2023140353551Open ↗
01/12/2022140353551Open ↗
01/27/2021140353551Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET5
01/10/2018123195915Open ↗
12/07/2017123118072Open ↗
04/12/2017123059484Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
05/03/2018140762903Open ↗
01/20/2016140451062Open ↗
05/29/2015140353551Open ↗
Showing 3 of 5 on file for this type
▸Other Documents15
▸DOB NOWHPD4: CONH Pilot Program7
08/17/2026M01398134-I1Open ↗
08/17/2026M01398134-P1Open ↗
08/13/2026M01146385-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWCalculations2
08/13/2026M01303038-I1Open ↗
08/13/2026M01089097-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M01089097-I1Open ↗
08/13/2026M01303038-I1Open ↗
▸DOB NOWDHCR Document2
08/13/2026M01146385-I1Open ↗
08/13/2026M01146385-S1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
05/01/2019122686744Open ↗
▸BISDHCR DOCUMENT1
04/04/2022122686744Open ↗