← Back
Primarily 4 family with 1 store or office
726 10 AVENUE
MANHATTAN · BIN 1026659
💬 Discuss this project
1910Year Built
4Stories
S4Building Class
R8Zoning
5,420 sfGross Floor Area
5Units
Rent Stabilized2 Open Violations 1 unresolved · 1 paperwork only ▸
Primarily 4 family with 1 store or office · Owner of record: 726 TENTH AVENUE, LLC · 2,008 sf lot · 2.7 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 13p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
726 TENTH AVENUE2007/08/2026
B H B CONSTRUCTION403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEE ENGINEERING & CONSULTING LLC110/25/2023
CL ENGINEERING P.C.401/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H J BUILDING CONSULTING803/21/2026
LEE ENGINEERING CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JEONG YUNGElectrical503/21/2026
SPLEN CONSTRUCTION INCGeneral Contractor207/08/2026
AWESOME ELECTL CONTNG INCElectrical103/22/2026
INTELOGIC ELECTRIC, INC.Electrical103/22/2026
MICHAEL BAPTISTEElectrical103/21/2026
TRI STATE PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252110/25/2023
CL ENGINEERING P.C.6781301/07/2022
Building Lifecycle
All (59)Filed (5)Permit Issued (3)Signed Off (3)Violation (11)Inspection (7)Special Inspection (30)
06/04/2025
Violation issued (HPD, closed)
A
11/22/2024
Violation issued (HPD, closed)
I
04/01/2024
Violation issued (HPD, closed)
A
10/25/2023
Filed — Alteration
REMOVAL OF EXISTING (1) 5-TON SINGLE PACKAGED AIR CONDITIONER IN REAR COURTYARD. INSTALLATION OF (1) 5-TON NEW SINGLE PACKAGED AIR CONDITIONER IN REAR COURTYARD. EXISTING SUPPLY AIR & RETURN AIR DUCTS TO REMAIN AND TO BE RECONNECTED TO NEW EQUIPMENT.
M00929754-I1
10/13/2023
Special inspection requirement — Tenant Protection Plan Compliance
INDARDEO PARBHUNATH
10/13/2023
Special inspection requirement — Energy Code Compliance Inspections
Greg Lee
09/06/2023
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
09/06/2023
Special inspection requirement — Final
Greg Lee
03/15/2023
Violation issued (HPD, closed)
A
11/02/2022
Violation issued (HPD, closed)
I
05/16/2022
Signed off — Alteration
PLUMBING WORK AT 1ST FLOOR BEAUTY SALON AND CELLAR OF EXISTING 4-STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M00643410-S1
05/16/2022
Signed off — Alteration
PLUMBING WORK AT 1ST FLOOR BEAUTY SALON AND CELLAR OF EXISTING 4-STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M00643410-I1
05/16/2022
Signed off — Alteration
PLUMBING WORK AT 1ST FLOOR BEAUTY SALON AND CELLAR OF EXISTING 4-STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M00643410-S2
05/04/2022
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
04/04/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/04/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/04/2022
Inspection — Fail-Final Fence Withdrawal
Fail
View inspection ↗
04/04/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/09/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/09/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/15/2022
Violation issued (HPD, closed)
A
01/28/2022
Permit issued — Plumbing
M00643410-S2-PL
01/14/2022
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
01/14/2022
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
01/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
01/14/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
01/14/2022
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
01/14/2022
Special inspection requirement — Final
CHRISTIAN LOZADA
01/14/2022
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
01/14/2022
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
01/14/2022
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
01/14/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
01/14/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
01/14/2022
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
01/14/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
01/14/2022
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
01/14/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
01/14/2022
Special inspection requirement — Lighting controls
CHRISTIAN LOZADA
01/07/2022
Filed — Alteration
PLUMBING WORK AT 1ST FLOOR BEAUTY SALON AND CELLAR OF EXISTING 4-STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M00643410-S2
01/07/2022
Filed — Alteration
PLUMBING WORK AT 1ST FLOOR BEAUTY SALON AND CELLAR OF EXISTING 4-STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M00643410-P1
01/07/2022
Permit issued — Construction Fence
M00643410-S1-FN
01/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
01/07/2022
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
01/07/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
01/07/2022
Special inspection requirement — Final
CHRISTIAN LOZADA
01/07/2022
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
01/07/2022
Special inspection requirement — Lighting controls
CHRISTIAN LOZADA
01/07/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
01/07/2022
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
01/07/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
01/07/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
01/03/2022
Filed — Alteration
PLUMBING WORK AT 1ST FLOOR BEAUTY SALON AND CELLAR OF EXISTING 4-STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M00643410-S1
12/28/2021
Permit issued — Mechanical Systems
M00643410-I1-GC-CX
12/09/2021
Filed — Alteration
PLUMBING WORK AT 1ST FLOOR BEAUTY SALON AND CELLAR OF EXISTING 4-STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M00643410-I1
10/25/2019
Violation issued (HPD, closed)
I
08/21/2019
Violation issued (ECB, open)
Construction
10/05/2018
Violation issued (HPD, closed)
I
10/24/2016
Violation issued (HPD, closed)
I
04/26/2011
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDW PLUMBING INC01/28/2022
DOB NOWConstruction FenceSigned-offSPLEN CONSTRUCTION INC01/07/2022
DOB NOWMechanical SystemsSigned-offSPLEN CONSTRUCTION INC12/28/2021
BISEQISSUEDHKS CONSTRUCTION CORP02/23/2015
BISOTISSUEDCONTINENTAL RESTORATION C11/20/2014
BISEQISSUEDB H & B CONSTRUCTION INC11/07/2014
1 project · most recent 10/25/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/25/2023——Heating and Air Conditioning Systems
Heat / Cool
York ZE060H12B2A1ABA1A4 5 tons · Rooftop Unit ×1
2 projects · most recent 04/25/2022
General Wiring
FiledStatusContractorScope
04/25/2022CompleteINTELOGIC ELECTRIC, INC.General Wiring
08/15/2018CompleteAWESOME ELECTL CONTNG INC1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/04/2022Pass-Final Fence Non-Directive 14PassView ↗
04/04/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/04/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/04/2022Fail-Final Fence WithdrawalFailView ↗
04/04/2022Pass-Final General Construction Non-Directive 14PassView ↗
03/09/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/09/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
10/13/2023Tenant Protection Plan ComplianceINDARDEO PARBHUNATHspecial
10/13/2023Energy Code Compliance InspectionsGreg Leeprogress
09/06/2023Mechanical SystemsINDARDEO PARBHUNATHspecial
09/06/2023FinalGreg Leeprogress
01/14/2022Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
01/14/2022Mechanical SystemsCHRISTIAN LOZADAspecial
01/14/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
01/14/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
01/14/2022Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
01/14/2022FinalCHRISTIAN LOZADAprogress
01/14/2022Fenestration air leakageCHRISTIAN LOZADAenergy_progress
01/14/2022Permanent certificateCHRISTIAN LOZADAenergy_progress
01/14/2022Fenestration areasCHRISTIAN LOZADAenergy_progress
01/14/2022HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
01/14/2022Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
01/14/2022Maintenance informationCHRISTIAN LOZADAenergy_progress
01/14/2022HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
01/14/2022Interior lighting powerCHRISTIAN LOZADAenergy_progress
01/14/2022HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
01/14/2022Lighting controlsCHRISTIAN LOZADAenergy_progress
01/07/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
01/07/2022Mechanical SystemsCHRISTIAN LOZADAspecial
01/07/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
01/07/2022FinalCHRISTIAN LOZADAprogress
01/07/2022Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
Latest 25 of 36.
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/03/2026M00643410-I1Request digital key ↗
09/03/2026M00643410-S1Request digital key ↗
09/03/2026M00643410-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits9
▸BISWORK PERMIT APPLICATION4
12/16/2019123695634Open ↗
03/03/2015140277288Open ↗
11/18/2014140281914Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
10/24/2019123695634Open ↗
11/18/2014140281914Open ↗
11/05/2014140277288Open ↗
▸DOB NOWHPD Certification Letter or CPC Special Permit2
08/13/2026M00643410-P1Open ↗
08/13/2026M00643410-I1Open ↗
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/03/2026M00643410-I1Open ↗
09/03/2026M00643410-S1Open ↗
09/03/2026M00643410-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026M00643410-I1Open ↗
09/01/2026M00643410-I1Open ↗
08/28/2026M00643410-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M00643410-I1Open ↗
08/28/2026M00643410-P1Open ↗
08/25/2026M00929754-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
11/18/2014140281914Open ↗
11/05/2014140277288Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
11/18/2014140281914Open ↗
11/05/2014140277288Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/18/2014140281914Open ↗
11/05/2014140277288Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
12/16/2019123695634Open ↗
10/24/2019123695634Open ↗
▸Safety & Tenant Protection10
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist5
08/13/2026M00643410-P1Open ↗
08/13/2026M00643410-I1Open ↗
08/13/2026M00643410-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWCertificate of No Harassment2
08/13/2026M00643410-P1Open ↗
08/13/2026M00643410-I1Open ↗
▸BISANTI-HARASSMENT CHECKLIST: CLINTON1
10/24/2019123695634Open ↗
▸BISTenant Protection Plan and Notes1
10/24/2019123695634Open ↗
▸BISCLINTON DISTRICT: ANTI-HARASSMENT CHECKLIST1
11/18/2014140281914Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/03/2026M00643410-P1Open ↗
09/03/2026M00643410-I1Open ↗
09/03/2026M00643410-S2Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/24/2019123695634Open ↗
11/18/2014140281914Open ↗
▸Energy Compliance5
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026M00643410-I1Open ↗
08/13/2026M00643410-S2Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/18/2014140281914Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/24/2019123695634Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/18/2014140281914Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
11/18/2014140281914Open ↗
11/05/2014140277288Open ↗
▸Approvals, Objections & Sign-offs2
▸BISSUPERSEDING LETTER1
03/03/2015140277288Open ↗
▸BISSHED LETTER1
03/03/2015140277288Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/24/2019123695634Open ↗
11/18/2014140281914Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET2
11/18/2014140281914Open ↗
11/05/2014140277288Open ↗
▸BISEFILING COVER SHEET1
10/24/2019123695634Open ↗