← Back
One family attached or semi-detached
726 CAULDWELL AVENUE
BRONX · BIN 2120243
💬 Discuss this project
1992Year Built
2Stories
A5Building Class
R6Zoning
1,152 sfGross Floor Area
1Units
One family attached or semi-detached · 2,685 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR103/12/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281103/12/2026
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
03/17/2026
Permit issued — Solar
X01370785-I1-SL
03/12/2026
Filed — Alteration
installation of solar panels, rooftop, railed, grid-tied, 18 modules, 7.38 KW
X01370785-I1
03/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
03/12/2026
Special inspection requirement — Air barrier - visual inspection
Mina Makar
03/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
03/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
03/11/2026
Special inspection requirement — Final
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR03/17/2026
BISOTISSUEDNONE07/28/1997
BIS—ISSUEDM.R.L.S. CONSTRUCTION CORP12/09/1992
BISPLISSUEDDUO PLUMBING & HTG CORP.09/24/1992
BIS—ISSUEDM.R.L.S. CONSTRUCTION CORP08/14/1992
1 project · most recent 03/12/2026
FiledStatusContractorScope
03/12/2026CompleteISLAND ELECTRIC CORP—
1 project · most recent 03/12/2026
FiledStatusContractorScope
03/12/2026Signed-offMOMENTUM SOLAR1 scope_items
1 project · most recent 03/12/2026
FiledStatusContractorScope
03/12/2026Signed-offMOMENTUM SOLAR18 panels, 7.38 kw, 317 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/12/2026Structural Stability – Alterations of existing buildingsMina Makarspecial
03/12/2026Air barrier - visual inspectionMina Makarenergy_progress
03/11/2026Fire-Resistant Penetrations and JointsMina Makarspecial
03/11/2026Energy Code Compliance InspectionsMina Makarprogress
03/11/2026FinalMina Makarprogress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026X01370785-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
09/02/2026X01370785-I1Open ↗
09/02/2026X01370785-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026X01370785-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/02/2026X01370785-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026X01370785-I1Open ↗