← Back
Single or multiple dwelling with stores or offices
726 FRANKLIN AVENUE
BROOKLYN · BIN 3029281
💬 Discuss this project
1906Year Built
4Stories
S9Building Class
R7AZoning
7,308 sfGross Floor Area
8Units
Rent Stabilized155 Open Violations 152 unresolved · 3 paperwork only ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · 2,700 sf lot · 2.71 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction21p · 1 filing · 20 docs
Floor 4Under Construction21p · 1 filing · 20 docs
Floor 3Under Construction19p · 1 filing · 20 docs
Floor 2Under Construction18p · 1 filing · 20 docs
Floor 1Under Construction19p · 1 filing · 20 docs
CellarUnder Construction22p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS306/27/2026
FRANKLIN LOFTS NY LLC103/22/2026
OWNER OF 726 FRANKLIN103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/18/2025$3.1M—— → —$431/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDITING 4 U403/21/2026
ZV Drafting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OVERHEAD MANAGEMENT LLCGeneral Contractor407/08/2026
J & G CONSTRUCTION SVCSGeneral Contractor306/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EE ENGINEERING9748606/05/2026
AG ENGINEERING PLLC8899108/19/2025
Building Lifecycle
All (9)Filed (9)
06/05/2026
Filed — Alteration
SUBSEQUENT STRUCTURAL APPLICATION FILED HEREWITH.
B01237283-P1
04/20/2026
Filed — Alteration
SUBSEQUENT STRUCTURAL APPLICATION FILED HEREWITH.
B01237283-S4
03/19/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01374811-I1
03/19/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01374805-I1
02/09/2026
Filed — Alteration
B01357272-I1
11/26/2025
Filed — Alteration
SUBSEQUENT STRUCTURAL APPLICATION FILED HEREWITH.
B01237283-S3
08/25/2025
Filed — Alteration
SUBSEQUENT STRUCTURAL APPLICATION FILED HEREWITH.
B01237283-S2
08/19/2025
Filed — Alteration
SUBSEQUENT STRUCTURAL APPLICATION FILED HEREWITH.
B01237283-S1
07/03/2025
Filed — Alteration
SUBSEQUENT STRUCTURAL APPLICATION FILED HEREWITH.
B01237283-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedJ & G CONSTRUCTION SVCS06/25/2026
DOB NOWSidewalk ShedPermit IssuedJ & G CONSTRUCTION SVCS03/27/2026
DOB NOWSupported ScaffoldPermit IssuedJ & G CONSTRUCTION SVCS03/27/2026
DOB NOWStructuralPermit IssuedOVERHEAD MANAGEMENT LLC03/16/2026
DOB NOWGeneral ConstructionPermit IssuedOVERHEAD MANAGEMENT LLC03/16/2026
DOB NOWMechanical SystemsPermit IssuedOVERHEAD MANAGEMENT LLC03/12/2026
DOB NOWConstruction FencePermit IssuedOVERHEAD MANAGEMENT LLC02/12/2026
BISPLISSUEDJACK CRANE PLG. INC.10/01/1992
BISBLISSUEDJACK CRANE PLG. INC.10/01/1992
BISPLISSUEDST. MARKS PLUMBING & HEATING CO09/21/1992
BISOTISSUEDST. MARKS PLUMBING & HEATING CO09/21/1992
1 project · most recent 06/05/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/05/2026Permit IssuedOVERHEAD MANAGEMENT LLCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Daikin 4MXM36AVJU9 34,200 BTU · Condensing Unit ×8
2MXM18AVJU9 17,200 BTU · Condensing Unit ×2
Heating
Daikin 4MXM36AVJU9 34,600 BTU · Condensing Unit ×8
2MXM18AVJU9 18,500 BTU · Condensing Unit ×2
Ventilation
— FV-0511VH1 50 CFM · Exhaust Fan ×1
1 project · most recent 06/05/2026
Storm Water/Sanitary
FiledStatusContractorScope
06/05/2026——Storm, Water/Sanitary
3 projects · most recent 03/13/2026
General Wiring
FiledStatusContractorScope
03/13/2026Permit IssuedRICHARD NEU—
12/01/2025Permit IssuedPOWER DIRECT ELECTRIC INCGeneral Wiring
12/01/2025Permit IssuedPOWER DIRECT ELECTRIC INC—
1 project · most recent 06/05/2026
Steel
FiledStatusContractorScope
06/05/2026Permit IssuedOVERHEAD MANAGEMENT LLCSteel
2 projects · most recent 03/19/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
03/19/2026Permit IssuedJ & G CONSTRUCTION SVCSSidewalk Shed
03/19/2026Permit IssuedJ & G CONSTRUCTION SVCSScaffold
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/02/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/30/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/20/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
06/30/2026Fire-Resistant Penetrations and JointsMenachem Engelspecial
06/30/2026Maintenance informationMenachem Engelenergy_progress
06/30/2026Air barrier - visual inspectionMenachem Engelenergy_progress
06/30/2026Lighting controlsMenachem Engelenergy_progress
06/30/2026Fenestration areasMenachem Engelenergy_progress
06/30/2026Interior lighting powerMenachem Engelenergy_progress
06/30/2026Exterior lighting powerMenachem Engelenergy_progress
06/30/2026MeteringMenachem Engelenergy_progress
06/30/2026Fenestration and door U-factor and product ratingsMenachem Engelenergy_progress
06/30/2026Fenestration air leakageMenachem Engelenergy_progress
06/30/2026Lighting in dwelling unitsMenachem Engelenergy_progress
06/30/2026Insulation placement and R valuesMenachem Engelenergy_progress
06/30/2026Energy Code Compliance InspectionsMenachem Engelprogress
06/30/2026FinalMenachem Engelprogress
06/30/2026Fire-Resistance Rated ConstructionMenachem Engelprogress
06/30/2026Exterior Insulation and Finish Systems (EIFS)Menachem Engelspecial
06/30/2026Structural Stability – Alterations of existing buildingsMenachem Engelspecial
05/11/2026Lighting in dwelling unitsMenachem Engelenergy_progress
05/11/2026Exterior Insulation and Finish Systems (EIFS)Menachem Engelspecial
05/11/2026Fire-Resistant Penetrations and JointsMenachem Engelspecial
05/11/2026Structural Stability – Alterations of existing buildingsMenachem Engelspecial
05/11/2026Energy Code Compliance InspectionsMenachem Engelprogress
05/11/2026FinalMenachem Engelprogress
05/11/2026Fire-Resistance Rated ConstructionMenachem Engelprogress
05/11/2026Interior lighting powerMenachem Engelenergy_progress
Latest 25 of 59.
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/18/2026B01357272-I1Request digital key ↗
08/17/2026B01374805-I1Request digital key ↗
08/17/2026B01374811-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
05/31/2011320313460Open ↗
▸Seals & Professional Certifications32
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026B01237283-S1Open ↗
09/23/2026B01237283-S1Open ↗
08/31/2026B01237283-S3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026B01237283-S1Open ↗
09/23/2026B01237283-S1Open ↗
08/31/2026B01237283-S3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/18/2026B01357272-I1Open ↗
08/17/2026B01374805-I1Open ↗
08/17/2026B01374811-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
05/31/2011320313460Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
05/31/2011320313460Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
05/31/2011320313460Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/17/2026B01237283-S1Open ↗
08/17/2026B01237283-S2Open ↗
08/17/2026B01237283-S3Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/31/2011320313460Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY1
05/31/2011320313460Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
05/31/2011320313460Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
05/31/2011320313460Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
05/31/2011320313460Open ↗
▸Other Documents5
▸DOB NOWDHCR Document5
08/17/2026B01237283-P1Open ↗
08/13/2026B01237283-S2Open ↗
08/13/2026B01237283-I1Open ↗
Showing 3 of 5 on file for this type