RoofUnder Construction127p · 10 filings · 20 docs
ArchitectureDMGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Structural · Supported Scaffold
Change of use to 3-story building from bank to eating & drinking establishment. Place of Assembly on 2nd floor only.
On file for this project
20 documents · 10 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Exterior repair and restoration of facade, repair wood railing, curb replacement, brick cleaning as per plans (Project Ruby - Buildout Phase.) No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 10 filings on this floor.
Floor 3Under Construction124p · 9 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Change of use to 3-story building from bank to eating & drinking establishment. Place of Assembly on 2nd floor only.
On file for this project
20 documents · 4 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Install new rooftop AC units for ventilation and kitchen exhaust, Install new outdoor/indoor VRF system, ductwork, refrigerant piping on the cellar, 1-3 and roof as per plans (Project Ruby/ Buildout Phase.) No change to use, egress or occupancy.
On file for this project
11 documents
Latest 3 of 9 filings on this floor.
Floor 2Under Construction128p · 9 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Change of use to 3-story building from bank to eating & drinking establishment. Place of Assembly on 2nd floor only.
On file for this project
20 documents · 8 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Install new rooftop AC units for ventilation and kitchen exhaust, Install new outdoor/indoor VRF system, ductwork, refrigerant piping on the cellar, 1-3 and roof as per plans (Project Ruby/ Buildout Phase.) No change to use, egress or occupancy.
On file for this project
11 documents
Latest 3 of 9 filings on this floor.
Floor 1Under Construction128p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Change of use to 3-story building from bank to eating & drinking establishment. Place of Assembly on 2nd floor only.
On file for this project
20 documents · 7 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Install new rooftop AC units for ventilation and kitchen exhaust, Install new outdoor/indoor VRF system, ductwork, refrigerant piping on the cellar, 1-3 and roof as per plans (Project Ruby/ Buildout Phase.) No change to use, egress or occupancy.
On file for this project
11 documents
Latest 3 of 10 filings on this floor.
CellarUnder Construction158p · 11 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural · Support of Excavation
Change of use to 3-story building from bank to eating & drinking establishment. Place of Assembly on 2nd floor only.
On file for this project
20 documents · 10 drawing sheets
Filing herewith for use of mechanical means DS1 in conjunction with application #M01018955-I1. No change in use, egress, or occupancy.
On file for this project
1 document · 1 drawing sheet
Support of excavation for the construction of proposed elevator pits, grease interceptor and sump pit and column B1 expansion in the Cellar Level as per plans (Project Ruby.) No change to use, egress or occupancy.
On file for this project
13 documents · 2 drawing sheets
Latest 3 of 11 filings on this floor.
Site & exteriorUnder Construction31p · 8 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · General Construction · Protection and Mechanical Methods · Sidewalk Shed · Supported Scaffold
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY BETAMAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 5 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Filed — no permit issued3p · 1 filing · 4 docs
Fire Protection
No filed description on record for this project.
On file for this project
4 documents · 3 drawing sheets