← Back
Building
Bergen Cove Condominium
7272 ROYCE PLACE · BIN 3340362
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
19 Open Violations ▸FDNY Report ↗
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DPM704/09/2026
BERGEN COVE CONDO I203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEVIN ENGINEERING PLLC208/20/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEVIN ENGINEERING PLLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EUROREMONT INCGeneral Contractor104/08/2026
SMART PLBG & HTG CORPPlumbing107/08/2026
Building Lifecycle
All (40)Filed (2)Permit Issued (2)Signed Off (2)Violation (19)Inspection (4)Objection (6)Special Inspection (5)
05/05/2026
Violation issued (HPD, open)
A
04/09/2026
Signed off — Alteration
INTERIOR REHAB OF DWELLINGS IN MULTI-FAMILY BUILDING. NO CHANGE IN USE PROPOSED. REMOVE WALL AND CEILING GYPSUM BOARD ALL AROUND. REMOVE FLOOR FINISH ALL AROUND. REMOVE DOORS AS PER PLAN. REMOVE ALL WINDOWS. REMOVE ALL BATHROOM AND KITCHEN APPLIANCES.
B01264345-I1
04/09/2026
Signed off — Alteration
INTERIOR REHAB OF DWELLINGS IN MULTI-FAMILY BUILDING. NO CHANGE IN USE PROPOSED. REMOVE WALL AND CEILING GYPSUM BOARD ALL AROUND. REMOVE FLOOR FINISH ALL AROUND. REMOVE DOORS AS PER PLAN. REMOVE ALL WINDOWS. REMOVE ALL BATHROOM AND KITCHEN APPLIANCES.
B01264345-S1
03/05/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/10/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/29/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/20/2025
Violation issued (HPD, open)
I
10/16/2025
Permit issued — Plumbing
B01264345-I1-PL
10/07/2025
Permit issued — General Construction
B01264345-S1-GC
09/29/2025
Objection resolved — Addressed
09/29/2025
Objection resolved — Addressed
09/29/2025
Objection resolved — Addressed
09/04/2025
Objection raised — Fire_Protection
09/04/2025
Objection raised — Fire_Protection
09/04/2025
Objection raised — Other
09/04/2025
Special inspection requirement — Fire-Resistance Rated Construction
Dmitry Levin
08/20/2025
Filed — Alteration
INTERIOR REHAB OF DWELLINGS IN MULTI-FAMILY BUILDING. NO CHANGE IN USE PROPOSED. REMOVE WALL AND CEILING GYPSUM BOARD ALL AROUND. REMOVE FLOOR FINISH ALL AROUND. REMOVE DOORS AS PER PLAN. REMOVE ALL WINDOWS. REMOVE ALL BATHROOM AND KITCHEN APPLIANCES.
B01264345-S1
08/13/2025
Filed — Alteration
INTERIOR REHAB OF DWELLINGS IN MULTI-FAMILY BUILDING. NO CHANGE IN USE PROPOSED. REMOVE WALL AND CEILING GYPSUM BOARD ALL AROUND. REMOVE FLOOR FINISH ALL AROUND. REMOVE DOORS AS PER PLAN. REMOVE ALL WINDOWS. REMOVE ALL BATHROOM AND KITCHEN APPLIANCES.
B01264345-I1
08/04/2025
Special inspection requirement — Final
Dmitry Levin
08/04/2025
Special inspection requirement — Fenestration air leakage
Dmitry Levin
08/04/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Dmitry Levin
08/04/2025
Special inspection requirement — Interior lighting power
Dmitry Levin
06/10/2025
Violation issued (HPD, open)
A
11/29/2024
Violation issued (HPD, open)
I
04/11/2024
Violation issued (HPD, open)
A
11/22/2023
Violation issued (HPD, open)
I
03/24/2023
Violation issued (HPD, open)
A
11/14/2022
Violation issued (HPD, open)
I
03/01/2022
Violation issued (HPD, open)
A
03/01/2022
Violation issued (HPD, open)
I
09/16/2021
Violation issued (HPD, open)
B
04/13/2021
Violation issued (HPD, open)
A
04/13/2021
Violation issued (HPD, open)
I
10/31/2019
Violation issued (HPD, open)
I
10/19/2018
Violation issued (HPD, open)
I
11/29/2017
Violation issued (HPD, open)
I
11/15/2016
Violation issued (HPD, open)
I
10/13/2015
Violation issued (HPD, open)
I
02/24/2015
Violation issued (HPD, open)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSMART PLBG & HTG CORP10/16/2025
DOB NOWGeneral ConstructionSigned-offEUROREMONT INC10/07/2025
1 project · most recent 06/24/2025
General Wiring
FiledStatusContractorScope
06/24/2025Permit IssuedLENS ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/05/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/29/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/04/2025Fire-Resistance Rated ConstructionDmitry Levinprogress
08/04/2025FinalDmitry Levinprogress
08/04/2025Fenestration air leakageDmitry Levinenergy_progress
08/04/2025Fenestration and door U-factor and product ratingsDmitry Levinenergy_progress
08/04/2025Interior lighting powerDmitry Levinenergy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026B01264345-S1Request digital key ↗
08/21/2026B01264345-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B01264345-I1Open ↗
08/13/2026B01264345-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026B01264345-S1Open ↗
08/27/2026B01264345-S1Open ↗