Roof42p · 10 filings · 20 docs
ArchitectureElectricalGeneralMechanicalStructural
Issued Permit Scope
Antenna · General Construction · Mechanical Systems · Protection and Mechanical Methods · Structural
Roof replacement as per plans. No change in use, egress, or occupancy.
On file for this project
3 documents · 2 drawing sheets
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
On file for this project
2 documents
RELOCATE TWO (2) 50-HP CONDENSER WATER PUMPS AND RECONFIGURE THE ASSOCIATED CONDENSER WATER PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 10 filings on this floor.
Floor 1821p · 2 filings · 20 docs
PlumbingStructural
Issued Permit Scope
Plumbing · Structural
Shoring the 18th floor, roof slab, & 17th floor in select locations.
On file for this project
28 documents · 1 drawing sheet
water tank piping. EXISTING GALLON TANK on the 18th floor TO BE UTILIZED FOR FIRE PROTECTION SUPPLY. NEW CHECK VALVE AND TAMPER SWITCH TO REMAIN
On file for this project
9 documents
Floor 1742p · 5 filings · 20 docs
ArchitectureDMFire ProtectionStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers · Structural
Installation of a Sprinkler head on the 17th FL.
On file for this project
4 documents · 1 drawing sheet
Removal of partitions,, doors and modification to the existing plumbing core bathrooms in the existing 17th FL office Space. No Change to occupancy, egress or use.
On file for this project
4 documents · 2 drawing sheets
Shoring the 18th floor, roof slab, & 17th floor in select locations.
On file for this project
28 documents
Latest 3 of 5 filings on this floor.
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 213p · 3 filings · 19 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Installation and replacement of plumbing fixtures on the 2nd FL, CRA Office Space.
On file for this project
6 documents · 1 drawing sheet
Modification to the Sprinkler system on the 2nd FL Office Space for CRA, As per plans filed herewith. No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
MODIFICATION OF EXISTING DUCT WORK AND PIPING. INSTALL 3 NEW AC UNITS FOR THE 2ND FL OFFICE SPACE (CRA). AS PER PLANS FILE WITHHERE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents · 1 drawing sheet
Floor 1
Cellar5p · 1 filing · 8 docs
Mechanical
Issued Permit Scope
Mechanical Systems
PROPOSE TO INSTALL SPLIT SYSTEM AC UNITS AT CELLAR AND 2ND FLOOR ROOF AS PER PLANS SUBMITTED HEREWITH.
On file for this project
8 documents · 4 drawing sheets
Site & exterior43p · 7 filings · 20 docs
ArchitectureCivilEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Protection and Mechanical Methods · Sidewalk Shed · Supported Scaffold
PIPE SCAFFOLD TO BE INSTALLED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 5 drawing sheets
INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
6 documents · 12 drawing sheets
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AND NEEDLE BEAM AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
On file for this project
21 documents · 9 drawing sheets
Latest 3 of 7 filings on this floor.
Filed — no permit issued16p · 4 filings · 15 docs
ArchitectureGeneralMechanicalPlumbingStructuralOther
PLUMBING WORK TO 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
7 documents · 7 drawing sheets
No filed description on record for this project.
On file for this project
3 documents · 2 drawing sheets
Modification to the Mechanical system on the 17th FL. No change to use, egress or occupancy. (demolishing ductwork )
On file for this project
3 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.