Factory, light manufacturing
349 BEACH 73 STREET
QUEENS · BIN 4624654
💬 Discuss this project
2023Year Built
1Stories
F5Building Class
M1-1Zoning
2,906 sfGross Floor Area
1Units
0 Open Violations
Factory, light manufacturing · Owner of record: 7303 AMSTEL BLVD LLC · 4,000 sf lot · 0.73 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof4p · 4 filings · 20 docs
Floor 13p · 3 filings · 20 docs
Mezzanine20p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DNO EQUIPMENT AND DEVELOPMENT INC.403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/29/2021$410K—NICK VELARDI'S SERVICE STATION, INC. → 7303 AMSTEL BLVD LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHITECTURE WORK OFFICE PLLC806/09/2026
FLORINELA MURESAN402/28/2025
JO DESIGN203/29/2023
VICTOR A. GORDON, PE PC209/30/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
K M DOB CONSULTING2403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BBB CONSTRUCTION INCGeneral Contractor807/08/2026
TOP DOG PLBG & HTG CORPPlumbing307/08/2026
ARSENIO NYC ELECTRICAL INElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TRIANGLE INSPECTION & TES74951106/09/2026
Building Lifecycle
All (90)Filed (16)Permit Issued (9)Signed Off (4)Inspection (9)Objection (22)Special Inspection (30)
08/27/2026
Signed off — Alteration
MODIFICATION OF EXISTING CURB CUT (TO BE EXTENDED 12") ON BEACH 73 STREET.
Q08012603-I1
08/18/2026
Signed off — Alteration
INSTALLATION OF PLUMBING FIXTURES AND GAS EQUIPMENT.
Q00725156-I1
07/01/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Rajasekhar Sakhamuri
07/01/2026
Special inspection requirement — Exterior lighting power
Rajasekhar Sakhamuri
07/01/2026
Special inspection requirement — Fenestration areas
Rajasekhar Sakhamuri
07/01/2026
Special inspection requirement — Insulation placement and R values
Rajasekhar Sakhamuri
07/01/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Rajasekhar Sakhamuri
07/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
07/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
Rajasekhar Sakhamuri
07/01/2026
Special inspection requirement — Interior lighting power
Rajasekhar Sakhamuri
07/01/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Rajasekhar Sakhamuri
07/01/2026
Special inspection requirement — Maintenance information
Rajasekhar Sakhamuri
07/01/2026
Special inspection requirement — Lowest Floor Elevation
Rajasekhar Sakhamuri
07/01/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Rajasekhar Sakhamuri
07/01/2026
Special inspection requirement — Masonry
Rajasekhar Sakhamuri
07/01/2026
Special inspection requirement — Subgrade Inspections
Rajasekhar Sakhamuri
07/01/2026
Special inspection requirement — Final
Rajasekhar Sakhamuri
07/01/2026
Special inspection requirement — Energy Code Compliance Inspections
Rajasekhar Sakhamuri
07/01/2026
Special inspection requirement — Metering
Rajasekhar Sakhamuri
07/01/2026
Special inspection requirement — Lighting controls
Rajasekhar Sakhamuri
07/01/2026
Special inspection requirement — Air barrier - visual inspection
Rajasekhar Sakhamuri
07/01/2026
Special inspection requirement — Protection of exposed foundation insulation
Rajasekhar Sakhamuri
07/01/2026
Special inspection requirement — Fenestration air leakage
Rajasekhar Sakhamuri
06/09/2026
Filed — New Building
NEW ONE-STORY WITH MEZZANINE FACTORY BUILDING. LIGHT INDUSTRIAL AND LOW HAZARD MANUFACTURING BUILDING.
Q00723716-P4
06/05/2026
Special inspection requirement — Subgrade Inspections
Rajasekhar Sakhamuri
06/05/2026
Special inspection requirement — Masonry
Rajasekhar Sakhamuri
06/05/2026
Special inspection requirement — Energy Code Compliance Inspections
Rajasekhar Sakhamuri
06/05/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Rajasekhar Sakhamuri
06/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
06/05/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Rajasekhar Sakhamuri
06/05/2026
Special inspection requirement — Final
Rajasekhar Sakhamuri
06/05/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Rajasekhar Sakhamuri
06/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
Rajasekhar Sakhamuri
04/20/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/16/2026
Filed — Alteration
MODIFICATION OF EXISTING CURB CUT (TO BE EXTENDED 12") ON BEACH 73 STREET.
Q08012603-P1
04/07/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
03/24/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION WOOD FENCE PER PLAN SUBMITTED DURING ALTERATION WORK. THE WORK SHALL COMPLY WITH THE 2014 BUILDING CODE CHAPTER 33.
Q00848783-I1
01/30/2026
Filed — New Building
NEW ONE-STORY WITH MEZZANINE FACTORY BUILDING. LIGHT INDUSTRIAL AND LOW HAZARD MANUFACTURING BUILDING.
Q00723716-P3
01/08/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/10/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
11/04/2025
Filed — New Building
NEW ONE-STORY WITH MEZZANINE FACTORY BUILDING. LIGHT INDUSTRIAL AND LOW HAZARD MANUFACTURING BUILDING.
Q00723716-P2
09/26/2025
Permit issued — Curb Cut
Q08012603-I1-CC
09/26/2025
Permit issued — Mechanical Systems
Q00724822-I1-MS
02/28/2025
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES AND GAS EQUIPMENT.
Q00725156-P2
01/16/2025
Permit issued — Plumbing
Q00725156-I1-PL
11/08/2024
Permit issued — General Construction
Q00724288-I1-GC-CX
10/03/2024
Permit issued — Plumbing
Q00725156-I1-PL
10/02/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/28/2024
Permit issued — Construction Fence
Q00848783-I1-FN
08/31/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/03/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/03/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/03/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/28/2023
Permit issued — Foundation
Q00724288-I1-GC-CX
07/14/2023
Permit issued — Plumbing
Q00725156-I1-PL
04/12/2023
Objection resolved — Addressed
04/04/2023
Objection raised — Other
03/29/2023
Filed — Alteration
FOUNDATION AND STRUCTURAL WORK FOR NEW ONE STORY WITH MEZZANINE FACTORY BUILDING.
Q00724288-P1
03/28/2023
Filed — New Building
NEW ONE-STORY WITH MEZZANINE FACTORY BUILDING. LIGHT INDUSTRIAL AND LOW HAZARD MANUFACTURING BUILDING.
Q00723716-P1
03/28/2023
Permit issued — Construction Fence
Q00848783-I1-FN
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offBBB CONSTRUCTION INC09/26/2025
DOB NOWMechanical SystemsSigned-offBBB CONSTRUCTION INC09/26/2025
DOB NOWPlumbingSigned-offTOP DOG PLBG & HTG CORP01/16/2025
DOB NOWGeneral ConstructionPermit IssuedBBB CONSTRUCTION INC11/08/2024
DOB NOWPlumbingSigned-offTOP DOG PLBG & HTG CORP10/03/2024
DOB NOWConstruction FenceSigned-offBBB CONSTRUCTION INC03/28/2024
DOB NOWFoundationPermit IssuedBBB CONSTRUCTION INC07/28/2023
DOB NOWPlumbingSigned-offTOP DOG PLBG & HTG CORP07/14/2023
DOB NOWConstruction FenceSigned-offBBB CONSTRUCTION INC03/28/2023
1 project · most recent 02/28/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/28/2025Signed-offTOP DOG PLBG & HTG CORPGas, Storm, Water/Sanitary
3 projects · most recent 10/13/2025
General Wiring Lighting
FiledStatusContractorScope
10/13/2025CompleteARSENIO NYC ELECTRICAL INGeneral Wiring, Lighting
09/20/2025CompleteARSENIO NYC ELECTRICAL IN1 meters, 1 new_meters
05/01/2025CompleteARSENIO NYC ELECTRICAL IN—
2 projects · most recent 06/09/2026
Steel Concrete Masonry
FiledStatusContractorScope
06/09/2026Permit IssuedBBB CONSTRUCTION INC6 scope_items
03/29/2023Permit IssuedBBB CONSTRUCTION INCSteel, Concrete, Masonry
1 project · most recent 06/09/2026
Earthwork
FiledStatusContractorScope
06/09/2026Permit IssuedBBB CONSTRUCTION INCEarthwork
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
04/20/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/07/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
01/08/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/10/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/02/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/31/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/03/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/03/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 133
DateRequirementInspectorRole
07/01/2026Lighting controlsRajasekhar Sakhamurienergy_progress
07/01/2026Insulation placement and R valuesRajasekhar Sakhamurienergy_progress
07/01/2026Maintenance informationRajasekhar Sakhamurienergy_progress
07/01/2026Exterior lighting powerRajasekhar Sakhamurienergy_progress
07/01/2026Fenestration air leakageRajasekhar Sakhamurienergy_progress
07/01/2026Fenestration and door U-factor and product ratingsRajasekhar Sakhamurienergy_progress
07/01/2026Protection of exposed foundation insulationRajasekhar Sakhamurienergy_progress
07/01/2026Air barrier - visual inspectionRajasekhar Sakhamurienergy_progress
07/01/2026Fenestration areasRajasekhar Sakhamurienergy_progress
07/01/2026Interior lighting powerRajasekhar Sakhamurienergy_progress
07/01/2026MeteringRajasekhar Sakhamurienergy_progress
07/01/2026Fire-Resistance Rated ConstructionRajasekhar Sakhamuriprogress
07/01/2026Fire-Resistant Penetrations and JointsRajasekhar Sakhamurispecial
07/01/2026MasonryRajasekhar Sakhamurispecial
07/01/2026Subgrade InspectionsRajasekhar Sakhamurispecial
07/01/2026Excavations - Sheeting, Shoring, and BracingRajasekhar Sakhamurispecial
07/01/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Rajasekhar Sakhamurispecial
07/01/2026Exterior Insulation and Finish Systems (EIFS)Rajasekhar Sakhamurispecial
07/01/2026Lowest Floor ElevationRajasekhar Sakhamuriprogress
07/01/2026FinalRajasekhar Sakhamuriprogress
07/01/2026Energy Code Compliance InspectionsRajasekhar Sakhamuriprogress
06/05/2026Exterior Insulation and Finish Systems (EIFS)Rajasekhar Sakhamurispecial
06/05/2026Air barrier - visual inspectionRajasekhar Sakhamurienergy_progress
06/05/2026Lighting controlsRajasekhar Sakhamurienergy_progress
06/05/2026Exterior lighting powerRajasekhar Sakhamurienergy_progress
Latest 25 of 133.
▾Documents — 228 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/26/2026Q00724822-I1Request digital key ↗
08/25/2026Q00788825-P1Request digital key ↗
08/25/2026Q00788825-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
01/23/2026440749451Open ↗
10/07/2022440749451Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
09/19/2024440749451Open ↗
04/24/2023440749451Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram7
08/16/2026Q00723716-P4Open ↗
08/13/2026Q00724288-P1Open ↗
08/13/2026Q00723716-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications151
▸DOB NOWProgress Inspector Seal & Signature82
09/06/2026Q00724288-I1Open ↗
09/06/2026Q00724288-I1Open ↗
09/06/2026Q00724288-I1Open ↗
Showing 3 of 82 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature51
09/06/2026Q00724288-I1Open ↗
09/06/2026Q00724288-I1Open ↗
09/06/2026Q00724288-I1Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/26/2026Q00724822-I1Open ↗
08/25/2026Q00788825-I1Open ↗
08/25/2026Q00788825-P1Open ↗
Showing 3 of 16 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/07/2022440749451Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/07/2022440749451Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026Q00723716-I1Open ↗
08/13/2026Q00723716-P1Open ↗
08/13/2026Q00723716-P2Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist5
08/16/2026Q00723716-P2Open ↗
08/16/2026Q00723716-P3Open ↗
08/16/2026Q00723716-P4Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST1
10/19/2022440749451Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00723716-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/15/2026Q00723716-I1Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION3
02/04/2026440749451Open ↗
09/19/2024440749451Open ↗
10/19/2022440749451Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/07/2022440749451Open ↗
▸Other Documents33
▸DOB NOWSite Survey: Initial7
08/16/2026Q00723716-P4Open ↗
08/13/2026Q00723716-P1Open ↗
08/13/2026Q00723716-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
08/16/2026Q00723716-P4Open ↗
Showing 1 of 7 on file for this type
▸DOB NOWFlood Plan Emergency Temporary Flood Shields5
08/16/2026Q00723716-P4Open ↗
08/16/2026Q00723716-P3Open ↗
08/16/2026Q00723716-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/16/2026Q00723716-P2Open ↗
08/16/2026Q00723716-P3Open ↗
08/16/2026Q00723716-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlot Diagram2
08/13/2026Q00724288-I1Open ↗
08/13/2026Q00724288-P1Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
03/26/2023440749451Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
03/26/2023440749451Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
10/07/2022440749451Open ↗
▸BISCURB CUT: PROVIDE EXISTING NUMBER1
04/24/2023440749451Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00723716-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026Q00723716-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00723716-I1Open ↗