← Back
QUEENS
73-08 187 STREET
QUEENS · BIN 4154099
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 09/14/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/14/2026——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Cooper & Hunter CH-N48LCU-230VO 48,000 BTU · Condensing Unit ×2
CH-N60LCU-230VO 60,000 BTU · Condensing Unit ×1
Heating
Cooper & Hunter CH-48AHU 48,000 BTU · Ahu ×2
CH-60AHU 60,000 BTU · Ahu ×1
Ventilation
Hampton Bay 7114-01 50 CFM · Exhaust Fan ×5
Delta Breeze SMT150 150 CFM · Exhaust Fan ×2
1 job · most recent 09/14/2026
Gas Water/Sanitary
FiledStatusContractorScope
09/14/2026——Gas, Water/Sanitary
1 job · most recent 09/14/2026
Steel Wood
FiledStatusContractorScope
09/14/2026——Steel, Wood
1 job · most recent 09/14/2026
Fence
FiledStatusContractorScope
09/14/2026——Fence
Building Lifecycle
All (31)Filed (1)Special Inspection (30)
09/14/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
FILED HEREWITH PLUMBING WORK TYPE IN CONJUNCTION WITH ALT-CO-NB APPLICATION #Q01412545-I1.
Q01412545-I1
09/14/2026
Special inspection requirement — Fenestration areas
09/14/2026
Special inspection requirement — Ventilation and air distribution system
09/14/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
09/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
09/14/2026
Special inspection requirement — Air barrier — testing
09/14/2026
Special inspection requirement — Insulation placement and R values
09/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
09/14/2026
Special inspection requirement — Air barrier - visual inspection
09/14/2026
Special inspection requirement — Permanent certificate
09/14/2026
Special inspection requirement — Fenestration air leakage
09/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/04/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
06/04/2026
Special inspection requirement — Final
06/04/2026
Special inspection requirement — Footing and Foundation
06/04/2026
Special inspection requirement — Energy Code Compliance Inspections
06/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/04/2026
Special inspection requirement — Concrete - Cast-In-Place
06/04/2026
Special inspection requirement — Maintenance information
06/04/2026
Special inspection requirement — Electric vehicle service equipment requirements
06/04/2026
Special inspection requirement — Interior lighting power
06/04/2026
Special inspection requirement — Duct leakage testing, insulation and design
06/04/2026
Special inspection requirement — Metering
06/04/2026
Special inspection requirement — Structural Wood Frame
06/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/04/2026
Special inspection requirement — Mechanical Systems
06/04/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
06/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/04/2026
Special inspection requirement — Heating Systems
06/04/2026
Special inspection requirement — Masonry
06/04/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ART DEVELOPERS GROUP LLC109/23/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NKM ENGINEERING PLLC109/14/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDNEW H&T INC07/05/2016
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
09/14/2026Fenestration areas—energy_progress
09/14/2026Ventilation and air distribution system—energy_progress
09/14/2026Fenestration and door U-factor and product ratings—energy_progress
09/14/2026HVAC-R and service water heating equipment—energy_progress
09/14/2026Air barrier — testing —energy_progress
09/14/2026Insulation placement and R values—energy_progress
09/14/2026HVAC-R and service water heating system controls—energy_progress
09/14/2026Air barrier - visual inspection—energy_progress
09/14/2026Permanent certificate—energy_progress
09/14/2026Fenestration air leakage—energy_progress
09/14/2026HVAC-R and service water piping design and insulation—energy_progress
06/04/2026Subsurface Investigations (Borings/Test Pits)—special
06/04/2026Final—progress
06/04/2026Footing and Foundation—progress
06/04/2026Energy Code Compliance Inspections—progress
06/04/2026Fire-Resistance Rated Construction—progress
06/04/2026Concrete - Cast-In-Place—special
06/04/2026Maintenance information—energy_progress
06/04/2026Electric vehicle service equipment requirements—energy_progress
06/04/2026Interior lighting power—energy_progress
06/04/2026Duct leakage testing, insulation and design—energy_progress
06/04/2026Metering—energy_progress
06/04/2026Structural Wood Frame—progress
06/04/2026Structural Stability – Alterations of existing buildings—special
06/04/2026Mechanical Systems—special
Latest 25 of 33.
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/23/2026Q01412545-S2Request digital key ↗
09/23/2026Q01412545-S1Request digital key ↗
09/23/2026Q01412545-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
07/02/2016440322161Open ↗
▸BISWORK PERMIT APPLICATION1
07/02/2016440322161Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
09/23/2026Q01412545-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/23/2026Q01412545-S2Open ↗
09/23/2026Q01412545-S1Open ↗
09/23/2026Q01412545-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/02/2016440322161Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/02/2016440322161Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/02/2016440322161Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
09/23/2026Q01412545-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/23/2026Q01412545-S2Open ↗
09/23/2026Q01412545-I1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/02/2016440322161Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/02/2016440322161Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/02/2016440322161Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
07/02/2016440322161Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
07/02/2016440322161Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
09/23/2026Q01412545-I1Open ↗
▸DOB NOWSite Survey: Initial1
09/23/2026Q01412545-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
09/23/2026Q01412545-I1Open ↗