← Back
Two family converted from one family
73-17 52 COURT
QUEENS · Maspeth · BIN 4057949
💬 Discuss this project
1925Year Built
2.3Stories
B3Building Class
R4-1Zoning
3,363 sfGross Floor Area
2Units
0 Open Violations
Two family converted from one family · 3,800 sf lot · 0.89 FAR built · Flood zone X
Locations of Work
ElectricalMechanicalPlumbingFire Protection
Attic9p · 2 filings · 20 docs
Floor 212p · 3 filings · 20 docs
Floor 111p · 3 filings · 20 docs
Cellar11p · 3 filings · 20 docs
Site & exterior1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KE JU CONTRACTING507/08/2026
CHEN 7317 REALTY403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/09/2022$1.5M—CHEN 7317 REALTY LLC → Private party$460/sf building
03/13/2020$760K—— → —$226/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMERILAND BROOK LLC902/28/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KE JU CONTRACTING CORPGeneral Contractor307/08/2026
CASE PLUMBING LLCFire Protection207/08/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERILAND BROOK LLC1506802/28/2022
Building Lifecycle
All (65)Filed (9)Permit Issued (6)Signed Off (4)Violation (14)Inspection (2)Special Inspection (30)
04/26/2022
Signed off — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH ALT-1 JOB#440626798
Q00411760-I1
04/15/2022
Signed off — Alteration
FILE SP WORKTYPE IN CONJUNCTION WITH JOB#440626798
Q00541924-I1
03/14/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/08/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/07/2022
Signed off — Alteration
INSTALL CONSTRUCTION FENCE AT ABOVE ADDRESS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00416137-I1
03/04/2022
Signed off — Alteration
FILE MH WORKTYPE IN CONJUNCTION WITH ALT-1 JOB# 440626798
Q00411763-I1
02/28/2022
Filed — Alteration
FILE SP WORKTYPE IN CONJUNCTION WITH JOB#440626798
Q00541924-P1
02/28/2022
Special inspection requirement — Sprinkler Systems
XIAOHONG ZHAO
02/11/2022
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH ALT-1 JOB#440626798
Q00411760-P4
10/06/2021
Violation issued (ECB, closed)
Construction
10/06/2021
Violation issued (ECB, closed)
Construction
07/22/2021
Permit issued — Sprinklers
Q00541924-I1-EW-SP
07/07/2021
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH ALT-1 JOB#440626798
Q00411760-P3
07/07/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
XIAOHONG ZHAO
07/07/2021
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
XIAOHONG ZHAO
07/07/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
XIAOHONG ZHAO
07/07/2021
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
07/07/2021
Special inspection requirement — HVAC and service water heating system controls
XIAOHONG ZHAO
07/07/2021
Special inspection requirement — HVAC and service water heating equipment
XIAOHONG ZHAO
07/07/2021
Special inspection requirement — HVAC insulation and sealing
XIAOHONG ZHAO
07/07/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
07/01/2021
Permit issued — Sprinklers
Q00541924-I1-EW-SP
06/29/2021
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH ALT-1 JOB#440626798
Q00411760-P2
06/29/2021
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
XIAOHONG ZHAO
06/29/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
XIAOHONG ZHAO
06/29/2021
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
06/29/2021
Special inspection requirement — HVAC and service water heating system controls
XIAOHONG ZHAO
06/29/2021
Special inspection requirement — HVAC insulation and sealing
XIAOHONG ZHAO
06/29/2021
Special inspection requirement — HVAC and service water heating equipment
XIAOHONG ZHAO
06/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
06/29/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
XIAOHONG ZHAO
06/23/2021
Violation issued (ECB, closed)
Site Safety
06/16/2021
Filed — Alteration
FILE SP WORKTYPE IN CONJUNCTION WITH JOB#440626798
Q00541924-I1
06/04/2021
Permit issued — Mechanical Systems
Q00411763-I1-MS
06/01/2021
Permit issued — Construction Fence
Q00416137-I1-FN
05/28/2021
Violation issued (ECB, closed)
Construction
05/28/2021
Violation issued (ECB, closed)
Construction
05/28/2021
Violation issued (ECB, closed)
Construction
05/10/2021
Violation issued (ECB, closed)
Site Safety
05/10/2021
Violation issued (ECB, closed)
Construction
05/10/2021
Violation issued (ECB, closed)
Unknown
05/10/2021
Violation issued (ECB, closed)
Unknown
05/10/2021
Violation issued (ECB, closed)
Construction
05/10/2021
Violation issued (ECB, closed)
Construction
05/10/2021
Violation issued (ECB, closed)
Construction
05/10/2021
Violation issued (ECB, closed)
Construction
04/21/2021
Permit issued — Plumbing
Q00411760-I1-PL
04/15/2021
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH ALT-1 JOB#440626798
Q00411760-P1
02/26/2021
Permit issued — Construction Fence
Q00416137-I1-FN
02/25/2021
Special inspection requirement — HVAC insulation and sealing
XIAOHONG ZHAO
02/25/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
02/25/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
XIAOHONG ZHAO
02/25/2021
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
XIAOHONG ZHAO
02/25/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
XIAOHONG ZHAO
02/25/2021
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
02/25/2021
Special inspection requirement — HVAC and service water heating equipment
XIAOHONG ZHAO
02/25/2021
Special inspection requirement — HVAC and service water heating system controls
XIAOHONG ZHAO
10/24/2020
Filed — Alteration
INSTALL CONSTRUCTION FENCE AT ABOVE ADDRESS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00416137-I1
10/20/2020
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH ALT-1 JOB#440626798
Q00411760-I1
10/20/2020
Filed — Alteration
FILE MH WORKTYPE IN CONJUNCTION WITH ALT-1 JOB# 440626798
Q00411763-I1
Latest 60 of 65 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offS & L PLUMBING INC07/22/2021
DOB NOWSprinklersSigned-offS & L PLUMBING INC07/01/2021
DOB NOWMechanical SystemsSigned-offKE JU CONTRACTING CORP06/04/2021
DOB NOWConstruction FenceSigned-offKE JU CONTRACTING CORP06/01/2021
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC04/21/2021
DOB NOWConstruction FenceSigned-offKE JU CONTRACTING CORP02/26/2021
BIS—ISSUEDKE JU CONTRACTING CORP10/06/2021
BIS—ISSUEDKE JU CONTRACTING CORP03/25/2021
BIS—ISSUEDKE JU CONTRACTING CORP03/22/2021
2 projects · most recent 04/26/2021
General Wiring Lighting
FiledStatusContractorScope
04/26/2021CompleteHI-RITE ELECTRIC CORPGeneral Wiring, Lighting
04/12/2021CompleteHI-RITE ELECTRIC CORP2 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/14/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/08/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
02/28/2022Sprinkler SystemsXIAOHONG ZHAOspecial
07/07/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIAOHONG ZHAOspecial
07/07/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesXIAOHONG ZHAOspecial
07/07/2021Subsurface Investigations (Borings/Test Pits)XIAOHONG ZHAOspecial
07/07/2021Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
07/07/2021HVAC and service water heating system controls XIAOHONG ZHAOenergy_progress
07/07/2021HVAC and service water heating equipment XIAOHONG ZHAOenergy_progress
07/07/2021HVAC insulation and sealing XIAOHONG ZHAOenergy_progress
07/07/2021Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
06/29/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesXIAOHONG ZHAOspecial
06/29/2021Subsurface Investigations (Borings/Test Pits)XIAOHONG ZHAOspecial
06/29/2021Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
06/29/2021HVAC and service water heating system controls XIAOHONG ZHAOenergy_progress
06/29/2021HVAC insulation and sealing XIAOHONG ZHAOenergy_progress
06/29/2021HVAC and service water heating equipment XIAOHONG ZHAOenergy_progress
06/29/2021Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
06/29/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIAOHONG ZHAOspecial
02/25/2021HVAC insulation and sealing XIAOHONG ZHAOenergy_progress
02/25/2021Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
02/25/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIAOHONG ZHAOspecial
02/25/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesXIAOHONG ZHAOspecial
02/25/2021Subsurface Investigations (Borings/Test Pits)XIAOHONG ZHAOspecial
02/25/2021Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
02/25/2021HVAC and service water heating equipment XIAOHONG ZHAOenergy_progress
02/25/2021HVAC and service water heating system controls XIAOHONG ZHAOenergy_progress
Latest 25 of 31.
▾Documents — 135 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch - Plumbing5
08/27/2026Q00411760-P4Request digital key ↗
08/27/2026Q00411760-P2Request digital key ↗
08/27/2026Q00411760-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch2
08/27/2026Q00541924-I1Request digital key ↗
08/27/2026Q00541924-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/27/2026Q00411763-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00416137-I1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION3
04/30/2021440626798Open ↗
02/24/2021440626798Open ↗
01/04/2021440660553Open ↗
▸BISWORK PERMIT APPLICATION3
07/01/2021440626798Open ↗
07/01/2021440626798Open ↗
03/25/2021440626798Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
02/22/2022440626798Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
03/05/2021440626798Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
03/05/2021440626798Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
01/04/2021440660553Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISVERIFY TAX LOT1
04/27/2022440626798Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
05/16/2022440626798Open ↗
▸BISZONING DIAGRAM1
02/25/2021440626798Open ↗
▸Seals & Professional Certifications44
▸DOB NOWProgress Inspector Seal & Signature17
08/29/2026Q00411760-P3Open ↗
08/29/2026Q00411760-P3Open ↗
08/29/2026Q00411760-P3Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
08/29/2026Q00411760-P3Open ↗
08/29/2026Q00411760-P3Open ↗
08/29/2026Q00411760-P3Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/27/2026Q00411760-I1Open ↗
08/27/2026Q00411760-P1Open ↗
08/27/2026Q00411760-P2Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
01/04/2021440660553Open ↗
09/14/2020440626798Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/04/2021440660553Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
07/01/2021440626798Open ↗
▸Trade Schedules & Equipment6
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
05/11/2022440626798Open ↗
02/25/2021440626798Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
02/25/2021440626798Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
05/11/2022440626798Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
05/11/2022440626798Open ↗
▸BISSPRINKLER (SP) SIGNOFF AS PER FC 501.4.3.1 (3)1
05/26/2022440626798Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
01/04/2021440660553Open ↗
09/14/2020440626798Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
05/11/2022440626798Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
03/05/2021440626798Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/25/2021440626798Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
05/11/2022440626798Open ↗
04/27/2022440626798Open ↗
03/04/2022440626798Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/01/2021440626798Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/27/2022440626798Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
03/02/2021440626798Open ↗
▸Inspections & Test Reports26
▸BISTECHNICAL REPORT: RESPONSIBILITY11
05/11/2022440626798Open ↗
04/27/2022440626798Open ↗
03/04/2022440626798Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSOIL REPORT5
08/13/2026Q00411760-P2Open ↗
08/13/2026Q00411760-P3Open ↗
08/13/2026Q00411760-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
05/16/2022440626798Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
05/11/2022440626798Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
03/15/2021440626798Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
05/16/2022440626798Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
05/16/2022440626798Open ↗
▸BISSOIL REPORT1
01/25/2021440626798Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
07/01/2021440626798Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
07/01/2021440626798Open ↗
▸BISSOIL PERC. TEST-STORM WATER SYSTEM (DRYWELL)1
03/04/2022440626798Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00411760-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/25/2021440626798Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
04/21/2022440660553Open ↗
▸Cost, Insurance & Ownership3
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
07/01/2021440626798Open ↗
▸BISCOST AFFIDAVIT1
01/25/2021440626798Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
04/27/2022440626798Open ↗
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION5
05/16/2022440626798Open ↗
02/03/2022440626798Open ↗
01/21/2022440626798Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
01/04/2021440660553Open ↗
09/14/2020440626798Open ↗
▸BISBOROUGH INTAKE FORM1
07/01/2021440626798Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
01/04/2021440660553Open ↗
▸Other Documents6
▸BISPLOT DIAGRAM2
05/16/2022440626798Open ↗
02/25/2021440626798Open ↗
▸BISELECTRIC VEHICLE SERVICE EQUIPMENT REQUIREMENTS1
03/15/2021440626798Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
01/08/2021440626798Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
03/08/2022440626798Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
04/15/2021440660553Open ↗