Two stories - detached, small or mid-size
73-28 196 PLACE
QUEENS · BIN 4616786
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R2AZoning
2,747 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Two stories - detached, small or mid-size · 5,500 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof5p · 2 filings · 20 docs
Floor 24p · 2 filings · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar4p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/14/2015$805K—Private party → Private party$293/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HAYM S. GROSS, ARCHITECT1405/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BRITZ ENTERPRISES INC.1403/21/2026
FRS CONSTRUCTION603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL PRO PLBG & HTG INCPlumbing607/08/2026
BORIS NASIMOVElectrical303/21/2026
FRSS GROUP CORPGeneral Contractor203/21/2026
NAS ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RIKE TECH ASSOCIATES LLC2965203/21/2025
WORLD DESIGN ARCHITECTURE9323611/23/2024
Building Lifecycle
All (90)Filed (14)Permit Issued (2)Signed Off (2)Violation (3)Inspection (4)Objection (35)Special Inspection (30)
08/07/2026
Objection raised — Scope
08/07/2026
Objection resolved — Resolved
07/09/2026
Objection resolved — Addressed
07/09/2026
Objection resolved — Resolved
07/09/2026
Special inspection requirement — Subgrade Inspections
07/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/02/2026
Objection raised — Inspections
07/02/2026
Objection raised — Structural
06/26/2026
Objection resolved — Addressed
05/22/2026
Filed — Alteration CO
APPLICATION FILED FOR ENLARGEMENT FIRST FLOOR, SECOND FLOOR AND NEW ATTIC LEVEL. NEW CO. OPEN TO BELOW AREA AT SECOND FLOOR REDUCED 165 SQFT. STAIRCASE AND NEW ATTIC FRAMING
Q01324834-S1
05/22/2026
Special inspection requirement — Sprayed fire-resistant materials
05/22/2026
Special inspection requirement — Structural Wood Frame
05/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
05/22/2026
Special inspection requirement — Energy Code Compliance Inspections
04/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/22/2026
Special inspection requirement — Final
03/17/2026
Objection resolved — Open
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Open
03/17/2026
Objection resolved — Open
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Open
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Open
03/17/2026
Objection resolved — Open
03/17/2026
Objection resolved — Open
03/17/2026
Objection resolved — Open
03/17/2026
Objection resolved — Open
03/17/2026
Objection resolved — Open
03/17/2026
Special inspection requirement — Masonry
03/17/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
03/17/2026
Special inspection requirement — Subgrade Inspections
03/17/2026
Special inspection requirement — Preliminary
02/27/2026
Objection raised — Zoning
02/27/2026
Objection raised — Cost
02/27/2026
Objection raised — Admin
02/27/2026
Objection raised — Scope
02/27/2026
Objection raised — Scope
02/27/2026
Objection raised — Inspections
02/27/2026
Objection raised — Zoning
02/27/2026
Objection raised — Scope
02/27/2026
Objection raised — Structural
02/27/2026
Objection raised — Structural
02/27/2026
Objection raised — Fire_Protection
02/27/2026
Objection raised — Energy
02/27/2026
Objection raised — Admin
02/27/2026
Objection raised — Zoning
02/27/2026
Objection raised — Zoning
12/01/2025
Filed — Alteration CO
APPLICATION FILED FOR ENLARGEMENT FIRST FLOOR, SECOND FLOOR AND NEW ATTIC LEVEL. NEW CO. OPEN TO BELOW AREA AT SECOND FLOOR REDUCED 165 SQFT. STAIRCASE AND NEW ATTIC FRAMING
Q01324834-I1
11/25/2025
Special inspection requirement — Sprayed fire-resistant materials
11/25/2025
Special inspection requirement — Energy Code Compliance Inspections
11/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
11/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
11/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/31/2025
Signed off — Alteration
pool and pool pumps
Q01074861-I1
03/24/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SYED RIZVI
03/21/2025
Filed — Alteration
pool and pool pumps
Q01074861-P5
03/21/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SYED RIZVI
02/06/2025
Filed — Alteration
pool and pool pumps
Q01074861-P4
12/26/2024
Signed off — Alteration
APPLICATION FILED TO REPLACE ROOF AND ATTIC FLOOR
Q01065851-I1
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC07/09/2024
DOB NOWGeneral ConstructionSigned-offFRSS GROUP06/20/2024
BISEQISSUEDYAFE MEOD CORP03/17/2020
BIS—ISSUEDYAFE MEOD CORP03/17/2020
BISEQISSUEDB.J. CONSTRUCTION OF NY03/22/2019
BISPLISSUEDFOUR POINTS P & H CORP11/26/2018
BISEQISSUEDM-AZAD CONSTRUCTION INC03/14/2018
BIS—ISSUEDM-AZAD CONSTRUCTION INC03/14/2018
BIS—ISSUEDM-AZAD CONSTRUCTION INC03/15/2017
BISPLISSUEDFOUR POINTS P & H CORP03/07/2017
BISEQISSUEDM-AZAD CONSTRUCTION INC11/22/2016
BIS—ISSUEDM-AZAD CONSTRUCTION INC11/22/2016
BIS—ISSUEDM-AZAD CONSTRUCTION INC11/22/2016
BISPLISSUEDFOUR POINTS P & H CORP07/20/2016
BIS—ISSUEDIMPACT BUILDERS CORP05/25/2016
BISEQISSUEDIMPACT BUILDERS CORP05/25/2016
BISPLISSUEDPETER MICELI PLUMBING10/16/2015
BIS—ISSUEDJC HOME DEVELOPMENT MANAG09/14/2015
BISEQISSUEDJC HOME DEVELOPMENT MANAG09/14/2015
BIS—ISSUEDJC HOME DEVELOPMENT MANAG09/14/2015
1 project · most recent 03/21/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/21/2025Signed-offALL PRO PLBG & HTG INCGas, Storm, Water/Sanitary
4 projects · most recent 11/06/2024
General Wiring
FiledStatusContractorScope
11/06/2024CompleteNAS ELECTRIC CORPGeneral Wiring
03/31/2020CompleteJOSEPH WEINSTEIN ELECTRIC1 meters
03/24/2020CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
03/12/2020CompleteSTEVEN FARKASGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/16/2024Pass-Final General Construction Non-Directive 14PassView ↗
11/21/2024Fail-Final General Construction Non-Directive 14FailView ↗
10/02/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
07/09/2026Subgrade Inspections—special
07/09/2026Fire-Resistant Penetrations and Joints—special
05/22/2026Sprayed fire-resistant materials—special
05/22/2026Structural Wood Frame—progress
05/22/2026Fire-Resistance Rated Construction—progress
05/22/2026Energy Code Compliance Inspections—progress
04/22/2026Structural Stability – Alterations of existing buildings—special
04/22/2026Final—progress
03/17/2026Masonry—special
03/17/2026Subsurface Investigations (Borings/Test Pits)—special
03/17/2026Subgrade Inspections—special
03/17/2026Preliminary—progress
11/25/2025Sprayed fire-resistant materials—special
11/25/2025Energy Code Compliance Inspections—progress
11/25/2025Fire-Resistance Rated Construction—progress
11/25/2025Structural Stability – Alterations of existing buildings—special
11/25/2025Fire-Resistant Penetrations and Joints—special
03/24/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSYED RIZVIspecial
03/21/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSYED RIZVIspecial
11/27/2024Energy Code Compliance InspectionsJEFFREY BELLprogress
11/27/2024Fire-Resistant Penetrations and JointsWILLIAM ALICEAspecial
11/27/2024Structural Stability – Alterations of existing buildingsWILLIAM ALICEAspecial
11/22/2024Structural Stability – Alterations of existing buildingsWILLIAM ALICEAspecial
11/22/2024Energy Code Compliance InspectionsJEFFREY BELLprogress
11/22/2024Fire-Resistant Penetrations and JointsWILLIAM ALICEAspecial
Latest 25 of 37.
▾Documents — 187 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/22/2026Q01074861-P5Request digital key ↗
08/22/2026Q01074861-P4Request digital key ↗
08/22/2026Q01074861-P3Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION14
04/27/2020420656775Open ↗
04/27/2020421183846Open ↗
12/05/2019420656775Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION12
03/23/2020420656775Open ↗
03/23/2020420656775Open ↗
03/26/2019420656775Open ↗
Showing 3 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
05/04/2019420656775Open ↗
▸Zoning, Tax Lot & Property Records12
▸BISZONING DIAGRAM3
10/18/2016420656775Open ↗
10/07/2016420656775Open ↗
09/15/2015421183846Open ↗
▸DOB NOWRestrictive Declaration/Easement 12
08/15/2026Q01324834-S1Open ↗
08/13/2026Q01324834-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/16/2026Q01324834-I1Open ↗
08/13/2026Q01324834-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 22
08/15/2026Q01324834-S1Open ↗
08/13/2026Q01324834-I1Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
09/30/2016420656775Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
04/27/2020421183846Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
09/01/2016420656775Open ↗
▸Seals & Professional Certifications47
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/22/2026Q01074861-I1Open ↗
08/22/2026Q01074861-P4Open ↗
08/22/2026Q01074861-P3Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/05/2026Q01065851-P5Open ↗
09/05/2026Q01065851-P5Open ↗
09/01/2026Q01065851-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
11/08/2019420656775Open ↗
11/08/2019420656775Open ↗
10/23/2019420656775Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/05/2026Q01065851-P5Open ↗
09/01/2026Q01065851-I1Open ↗
09/01/2026Q01065851-P2Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/16/2016421360431Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/16/2016421360431Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
08/20/2019420656775Open ↗
05/16/2019420656775Open ↗
05/13/2019420656775Open ↗
Showing 3 of 7 on file for this type
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
09/30/2016420656775Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
12/05/2019420656775Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
03/06/2018420656775Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
09/01/2016420656775Open ↗
07/09/2015421183846Open ↗
▸BISTenant Protection Plan and Notes1
09/16/2016421360431Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026Q01324834-I1Open ↗
08/15/2026Q01324834-S1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/11/2015421183846Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
10/03/2019420656775Open ↗
11/29/2016420656775Open ↗
09/21/2015421183846Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
10/04/2019420656775Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/30/2016420656775Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY3
10/07/2016420656775Open ↗
10/07/2016420656775Open ↗
10/07/2016420656775Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
11/01/2016420656775Open ↗
09/21/2015421183846Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
11/01/2016420656775Open ↗
09/21/2015421183846Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
09/30/2016420656775Open ↗
09/11/2015421183846Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7201
09/15/2015421183846Open ↗
▸BISSOIL REPORT1
09/30/2016420656775Open ↗
▸DOB NOWSOIL REPORT1
08/16/2026Q01324834-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/16/2026Q01324834-I1Open ↗
▸Approvals, Objections & Sign-offs13
▸BISSCHEDULE A - OCCUPANCY / USE5
09/25/2019420656775Open ↗
09/06/2016420656775Open ↗
09/01/2015421183846Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER4
03/23/2020420656775Open ↗
03/26/2019420656775Open ↗
07/22/2016421183846Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/23/2020420656775Open ↗
08/22/2016421183846Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/23/2020420656775Open ↗
▸BISHOUSE CONNECTION SIGNOFF1
09/01/2016420656775Open ↗
▸Cost, Insurance & Ownership8
▸BISPROJECT-SPECIFIC GL INSURANCE4
03/23/2020420656775Open ↗
03/22/2017420656775Open ↗
11/29/2016420656775Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT2
09/11/2015421183846Open ↗
07/09/2015421183846Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
03/22/2017420656775Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
12/05/2019420656775Open ↗
▸Filing & Intake Forms17
▸BISADDITIONAL INFORMATION11
04/27/2020421183846Open ↗
03/14/2020420656775Open ↗
01/14/2020420656775Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM4
04/27/2020420656775Open ↗
04/27/2020421183846Open ↗
04/13/2020420656775Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
09/16/2016421360431Open ↗
07/09/2015421183846Open ↗
▸Other Documents14
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
08/21/2026Q01065851-I1Open ↗
08/21/2026Q01065851-P3Open ↗
08/21/2026Q01065851-P4Open ↗
Showing 3 of 7 on file for this type
▸BISPLOT DIAGRAM5
04/27/2020420656775Open ↗
04/13/2020420656775Open ↗
12/05/2019420656775Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlot Diagram1
08/16/2026Q01324834-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01324834-I1Open ↗