← Back
One story - permanent living quarter
73-35 136 STREET
QUEENS · Kew Gardens Hills · BIN 4142386
💬 Discuss this project
1940Year Built
2Stories
A2Building Class
R2XZoning
984 sfGross Floor Area
1Units
One story - permanent living quarter · 4,000 sf lot · 0.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Roof1p · 1 filing · 6 docs
Floor 33p · 2 filings · 20 docs
Floor 23p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar7p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/17/2023$1.5M—— → —$1,479/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JBA1303/26/2026
FABIAN CRUZ PE PLLC110/09/2023
CHUN ENGINEERING CONSULTANT PLLC206/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC BUILDING SOLUTIONS1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC BUILDING SOLUTIONS COGeneral Contractor603/21/2026
L&L CONSTRUCTION DEVELOPGeneral Contractor404/09/2026
TRI STATE PLBG & HTG INCPlumbing207/08/2026
KJK ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOYUN KIM; RA74151403/26/2026
MARKANICS CORP4600903/26/2026
Building Lifecycle
All (61)Filed (15)Permit Issued (6)Signed Off (4)Inspection (6)Special Inspection (30)
06/01/2026
Signed off — Alteration CO
HEREWITH TO PROPOSE PLUMBING SYSTEMS AS PER CONSTRUCTION PLANS. IN CONJUNCTION WITH DOB #Q00872289-S1.
Q00872289-I1
05/01/2026
Special inspection requirement — Structural Steel - High Strength Bolting
DOYUN KIM
05/01/2026
Special inspection requirement — Masonry
DOYUN KIM
05/01/2026
Special inspection requirement — Underpinning
Malcolm Barkan
05/01/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
DOYUN KIM
05/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
05/01/2026
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
05/01/2026
Special inspection requirement — Footing and Foundation
DOYUN KIM
05/01/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
DOYUN KIM
05/01/2026
Special inspection requirement — Concrete - Cast-In-Place
DOYUN KIM
05/01/2026
Special inspection requirement — Structural Cold-Formed Steel
DOYUN KIM
05/01/2026
Special inspection requirement — Final
NAVEEN KUMAR
05/01/2026
Special inspection requirement — Structural Steel - Welding
DOYUN KIM
05/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
DOYUN KIM
05/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
DOYUN KIM
05/01/2026
Special inspection requirement — Structural Steel - Details
DOYUN KIM
03/26/2026
Filed — Alteration CO
HEREWITH TO PROPOSE PLUMBING SYSTEMS AS PER CONSTRUCTION PLANS. IN CONJUNCTION WITH DOB #Q00872289-S1.
Q00872289-A4
03/16/2026
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
03/16/2026
Special inspection requirement — Underpinning
Malcolm Barkan
03/16/2026
Special inspection requirement — Final
RICHARD MUESCH JR.
03/16/2026
Special inspection requirement — Structural Steel - High Strength Bolting
DOYUN KIM
03/16/2026
Special inspection requirement — Structural Steel - Welding
DOYUN KIM
03/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
DOYUN KIM
03/16/2026
Special inspection requirement — Structural Cold-Formed Steel
DOYUN KIM
03/16/2026
Special inspection requirement — Masonry
DOYUN KIM
03/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
DOYUN KIM
03/16/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
DOYUN KIM
03/16/2026
Special inspection requirement — Concrete - Cast-In-Place
DOYUN KIM
03/16/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
DOYUN KIM
03/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
03/16/2026
Special inspection requirement — Structural Steel - Details
DOYUN KIM
03/16/2026
Special inspection requirement — Footing and Foundation
DOYUN KIM
02/12/2026
Filed — Alteration CO
HEREWITH TO PROPOSE PLUMBING SYSTEMS AS PER CONSTRUCTION PLANS. IN CONJUNCTION WITH DOB #Q00872289-S1.
Q00872289-A3
01/07/2026
Filed — Alteration CO
HEREWITH TO PROPOSE PLUMBING SYSTEMS AS PER CONSTRUCTION PLANS. IN CONJUNCTION WITH DOB #Q00872289-S1.
Q00872289-A2
09/04/2025
Filed — Alteration CO
HEREWITH TO PROPOSE PLUMBING SYSTEMS AS PER CONSTRUCTION PLANS. IN CONJUNCTION WITH DOB #Q00872289-S1.
Q00872289-P9
06/06/2025
Signed off — Alteration CO
HEREWITH TO PROPOSE PLUMBING SYSTEMS AS PER CONSTRUCTION PLANS. IN CONJUNCTION WITH DOB #Q00872289-S1.
Q00872289-S1
05/15/2025
Signed off — Alteration
HEREWITH FILING TO INSTALL CONSTRUCTION FENCE AS PER PLANS.
Q00890060-I1
05/13/2025
Filed — Alteration CO
HEREWITH TO PROPOSE PLUMBING SYSTEMS AS PER CONSTRUCTION PLANS. IN CONJUNCTION WITH DOB #Q00872289-S1.
Q00872289-P8
05/13/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/17/2025
Permit issued — Plumbing
Q00872289-S1-PL
04/15/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/26/2025
Filed — Alteration CO
HEREWITH TO PROPOSE PLUMBING SYSTEMS AS PER CONSTRUCTION PLANS. IN CONJUNCTION WITH DOB #Q00872289-S1.
Q00872289-P5
02/26/2025
Filed — Alteration CO
HEREWITH TO PROPOSE PLUMBING SYSTEMS AS PER CONSTRUCTION PLANS. IN CONJUNCTION WITH DOB #Q00872289-S1.
Q00872289-P6
11/26/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/21/2024
Permit issued — Foundation
Q00872289-I1-GC-CX
06/12/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/15/2024
Filed — Alteration CO
HEREWITH TO PROPOSE PLUMBING SYSTEMS AS PER CONSTRUCTION PLANS. IN CONJUNCTION WITH DOB #Q00872289-S1.
Q00872289-P4
05/14/2024
Filed — Alteration CO
HEREWITH TO PROPOSE PLUMBING SYSTEMS AS PER CONSTRUCTION PLANS. IN CONJUNCTION WITH DOB #Q00872289-S1.
Q00872289-P2
03/28/2024
Permit issued — Plumbing
Q00872289-S1-PL
01/24/2024
Filed — Alteration CO
HEREWITH TO PROPOSE PLUMBING SYSTEMS AS PER CONSTRUCTION PLANS. IN CONJUNCTION WITH DOB #Q00872289-S1.
Q00872289-P1
11/14/2023
Signed off — Alteration
HEREWITH FILING INTERIOR NON STRUCTURAL DEMO AS PER CONSTRUCTION PLANS. IN CONJUNCTION WITH DOB NOW #Q00872289
Q00890479-I1
10/09/2023
Filed — Alteration
INSTALLATION OF SPRINKLER SYSTEM FOR 1 FAMILY DWELLING IN CONJUNCTION WITH Q00872289-I1.
Q00899768-I1
10/04/2023
Filed — Alteration CO
HEREWITH TO PROPOSE PLUMBING SYSTEMS AS PER CONSTRUCTION PLANS. IN CONJUNCTION WITH DOB #Q00872289-S1.
Q00872289-S1
10/04/2023
Permit issued — Foundation
Q00872289-I1-GC-CX
06/22/2023
Permit issued — Construction Fence
Q00890060-I1-FN
06/21/2023
Permit issued — Structural
Q00890479-I1-ST
06/17/2023
Filed — Alteration
HEREWITH FILING TO INSTALL CONSTRUCTION FENCE AS PER PLANS.
Q00890060-I1
06/17/2023
Filed — Alteration
HEREWITH FILING INTERIOR NON STRUCTURAL DEMO AS PER CONSTRUCTION PLANS. IN CONJUNCTION WITH DOB NOW #Q00872289
Q00890479-I1
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDW PLUMBING INC04/17/2025
DOB NOWFoundationPermit IssuedL&L CONSTRUCTION DEVELOP11/21/2024
DOB NOWPlumbingSigned-offDW PLUMBING INC03/28/2024
DOB NOWFoundationPermit IssuedL&L CONSTRUCTION DEVELOP10/04/2023
DOB NOWConstruction FenceSigned-offNYC BUILDING SOLUTIONS CO06/22/2023
DOB NOWStructuralSigned-offNYC BUILDING SOLUTIONS CO06/21/2023
1 project · most recent 10/09/2023
FiledStatusContractorScope
10/09/2023———
1 project · most recent 03/26/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/26/2026Signed-offTRI STATE PLBG & HTG INCGas, Water/Sanitary
1 project · most recent 04/17/2025
General Wiring
FiledStatusContractorScope
04/17/2025CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/15/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/26/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/12/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/12/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 81
DateRequirementInspectorRole
05/01/2026Structural Steel - DetailsDOYUN KIMspecial
05/01/2026Footing and FoundationDOYUN KIMprogress
05/01/2026FinalNAVEEN KUMARprogress
05/01/2026Fire-Resistance Rated ConstructionDOYUN KIMprogress
05/01/2026Energy Code Compliance InspectionsDOYUN KIMprogress
05/01/2026Exterior Insulation and Finish Systems (EIFS)DOYUN KIMspecial
05/01/2026Structural Cold-Formed SteelDOYUN KIMspecial
05/01/2026Concrete - Cast-In-PlaceDOYUN KIMspecial
05/01/2026UnderpinningMalcolm Barkanspecial
05/01/2026Excavations - Sheeting, Shoring, and BracingDOYUN KIMspecial
05/01/2026MasonryDOYUN KIMspecial
05/01/2026Fire-Resistant Penetrations and JointsDOYUN KIMspecial
05/01/2026Structural Steel - WeldingDOYUN KIMspecial
05/01/2026Structural Steel - High Strength BoltingDOYUN KIMspecial
05/01/2026Structural Stability – Alterations of existing buildingsDOYUN KIMspecial
03/16/2026Footing and FoundationDOYUN KIMprogress
03/16/2026Concrete - Cast-In-PlaceDOYUN KIMspecial
03/16/2026Excavations - Sheeting, Shoring, and BracingDOYUN KIMspecial
03/16/2026Exterior Insulation and Finish Systems (EIFS)DOYUN KIMspecial
03/16/2026Fire-Resistant Penetrations and JointsDOYUN KIMspecial
03/16/2026MasonryDOYUN KIMspecial
03/16/2026Structural Cold-Formed SteelDOYUN KIMspecial
03/16/2026Structural Stability – Alterations of existing buildingsDOYUN KIMspecial
03/16/2026Structural Steel - DetailsDOYUN KIMspecial
03/16/2026Structural Steel - High Strength BoltingDOYUN KIMspecial
Latest 25 of 81.
▾Documents — 158 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/24/2026Q00890479-I1Request digital key ↗
08/24/2026Q00890060-I1Request digital key ↗
08/24/2026Q00899768-P1Request digital key ↗
Showing 3 of 17 on file for this type
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZD1: DOB Zoning Diagram9
08/22/2026Q00872289-A4Open ↗
08/13/2026Q00872289-A1Open ↗
08/13/2026Q00872289-A3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00872289-I1Open ↗
▸Seals & Professional Certifications55
▸DOB NOWSpecial Inspector Seal & Signature27
09/18/2026Q00872289-A1Open ↗
09/18/2026Q00872289-A1Open ↗
09/18/2026Q00872289-A1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/24/2026Q00890479-I1Open ↗
08/24/2026Q00890060-I1Open ↗
08/24/2026Q00899768-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/18/2026Q00872289-A1Open ↗
09/18/2026Q00872289-A1Open ↗
08/31/2026Q00872289-P5Open ↗
Showing 3 of 11 on file for this type
▸Safety & Tenant Protection10
▸DOB NOWStreet Tree Checklist9
08/22/2026Q00872289-P6Open ↗
08/22/2026Q00872289-P1Open ↗
08/22/2026Q00872289-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00872289-I1Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
08/24/2026Q00890479-I1Open ↗
08/24/2026Q00899768-I1Open ↗
08/22/2026Q00872289-P5Open ↗
Showing 3 of 16 on file for this type
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q00872289-I1Open ↗
▸Other Documents49
▸DOB NOWWaiver Document11
08/22/2026Q00872289-A4Open ↗
08/13/2026Q00872289-P6Open ↗
08/13/2026Q00872289-P9Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSite Survey: Initial9
08/22/2026Q00872289-A4Open ↗
08/13/2026Q00872289-P9Open ↗
08/13/2026Q00872289-A3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone9
08/22/2026Q00872289-A4Open ↗
08/13/2026Q00872289-P1Open ↗
08/13/2026Q00872289-A3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlot Diagram9
08/22/2026Q00872289-A4Open ↗
08/13/2026Q00872289-P1Open ↗
08/13/2026Q00872289-P6Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProperty Ownership Certification9
08/22/2026Q00872289-P6Open ↗
08/22/2026Q00872289-P2Open ↗
08/22/2026Q00872289-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWFinal Survey1
08/13/2026Q00872289-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00872289-I1Open ↗