← Back
Two stories - detached, small or mid-size
73-72 195 STREET
QUEENS · BIN 4154341
💬 Discuss this project
1935Year Built
2Stories
A1Building Class
R2AZoning
1,716 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: 7253 YELLOWSTONE LLC · 4,000 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Permit Issued — active, not yet Signed-off
Roof5p · 2 filings · 17 docs
Floor 2Under Construction13p · 2 filings · 20 docs
Floor 1Under Construction11p · 2 filings · 20 docs
CellarUnder Construction10p · 1 filing · 20 docs
1 job · most recent 05/22/2025
Water/Sanitary
FiledStatusContractorScope
05/22/2025Signed-offNICE PLUMBING CORPWater/Sanitary
2 jobs · most recent 06/24/2025
General Wiring
FiledStatusContractorScope
06/24/2025CompleteNAS ELECTRIC CORPGeneral Wiring
01/31/2025CompleteMDC SECURITY AND ELEC'L—
1 job · most recent 05/22/2025
Steel
FiledStatusContractorScope
05/22/2025Permit IssuedFRSS GROUP CORPSteel
1 job · most recent 02/04/2025
FiledStatusContractorScope
02/04/2025Signed-offSOLARBLOCKS ENERGY LLC19 panels, 8.17 kw, 868 roof_area_sqft
Building Lifecycle
All (105)Filed (10)Permit Issued (8)Signed Off (5)Violation (3)Inspection (5)Objection (44)Special Inspection (30)
08/06/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
THE DRAWINGS HEREIN ARE RELATED TO A NEW 2-STORY WOOD FRAMED BUILDING WITH CELLAR.
Q01068500-S3
08/06/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
THE DRAWINGS HEREIN ARE RELATED TO A NEW 2-STORY WOOD FRAMED BUILDING WITH CELLAR.
Q01068500-S2
07/17/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
THE DRAWINGS HEREIN ARE RELATED TO A NEW 2-STORY WOOD FRAMED BUILDING WITH CELLAR.
Q01068500-S1
07/16/2026
Signed off — Alteration
Q01098561-I1
06/11/2026
Signed off — Alteration
The scope of work pertains exclusively to the installation of the solar system. Any additional tasks or activities should not be assumed as approved or permitted by the NYC Department of Buildings. No change to use, egress, or occupancy.
Q01176514-I1
05/19/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/11/2025
Permit issued — Construction Fence
Q01098561-I1-FN
09/11/2025
Permit issued — General Construction
Q01068500-I1-GC
07/09/2025
Special inspection requirement — Electric vehicle service equipment requirements
JIAN DENG
07/09/2025
Special inspection requirement — Demolition
JIAN DENG
07/09/2025
Special inspection requirement — Interior lighting power
JIAN DENG
07/09/2025
Special inspection requirement — Protection of exposed foundation insulation
JIAN DENG
07/09/2025
Special inspection requirement — Masonry
JIAN DENG
07/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
07/09/2025
Special inspection requirement — Fenestration areas
JIAN DENG
07/09/2025
Special inspection requirement — Permanent certificate
JIAN DENG
07/09/2025
Special inspection requirement — Air barrier — testing
JIAN DENG
07/09/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JIAN DENG
07/09/2025
Special inspection requirement — Insulation placement and R values
JIAN DENG
07/09/2025
Special inspection requirement — Maintenance information
JIAN DENG
07/09/2025
Special inspection requirement — Concrete - Cast-In-Place
JIAN DENG
07/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JIAN DENG
07/09/2025
Special inspection requirement — Fenestration air leakage
JIAN DENG
07/09/2025
Special inspection requirement — Air barrier - visual inspection
JIAN DENG
07/09/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
JIAN DENG
06/16/2025
Objection resolved — Addressed
06/10/2025
Objection raised — Cost
06/06/2025
Violation issued (ECB, closed)
Unknown
06/06/2025
Violation issued (ECB, closed)
Unknown
05/28/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
05/28/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/22/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
THE DRAWINGS HEREIN ARE RELATED TO A NEW 2-STORY WOOD FRAMED BUILDING WITH CELLAR.
Q01068500-P2
05/22/2025
Special inspection requirement — Fenestration air leakage
JIAN DENG
05/22/2025
Special inspection requirement — Maintenance information
JIAN DENG
05/22/2025
Special inspection requirement — Air barrier — testing
JIAN DENG
05/22/2025
Special inspection requirement — Fenestration areas
JIAN DENG
05/22/2025
Special inspection requirement — Electric vehicle service equipment requirements
JIAN DENG
05/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JIAN DENG
05/22/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
JIAN DENG
05/22/2025
Special inspection requirement — Interior lighting power
JIAN DENG
05/22/2025
Special inspection requirement — Air barrier - visual inspection
JIAN DENG
05/22/2025
Special inspection requirement — Masonry
JIAN DENG
05/22/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JIAN DENG
05/22/2025
Special inspection requirement — Permanent certificate
JIAN DENG
05/22/2025
Special inspection requirement — Protection of exposed foundation insulation
JIAN DENG
05/19/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
THE DRAWINGS HEREIN ARE RELATED TO A NEW 2-STORY WOOD FRAMED BUILDING WITH CELLAR.
Q01068500-P1
03/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/27/2025
Permit issued — Solar
Q01176514-I1-SL
02/25/2025
Objection resolved — Addressed
02/21/2025
Objection raised — Other
02/21/2025
Objection resolved — Addressed
02/07/2025
Objection raised — Fire_Protection
02/04/2025
Filed — Alteration
The scope of work pertains exclusively to the installation of the solar system. Any additional tasks or activities should not be assumed as approved or permitted by the NYC Department of Buildings. No change to use, egress, or occupancy.
Q01176514-I1
12/26/2024
Violation issued (ECB, closed)
Construction
09/18/2024
Permit issued — Plumbing
Q01068500-S1-PL
09/17/2024
Permit issued — General Construction
Q01068500-I1-GC
09/11/2024
Permit issued — Foundation
Q01068500-S3-FO
09/10/2024
Permit issued — Construction Fence
Q01098561-I1-FN
09/10/2024
Permit issued — Structural
Q01068500-S2-ST
Latest 60 of 105 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
7372 195TH3007/08/2026
FRSS GROUP303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/18/2024$958K—MS QUEENS HOLDING LLC → 7253 YELLOWSTONE LLC$559/sf building
12/01/2023$800K—— → —$466/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YANG ENGINEERING LLC505/22/2025
TOM PETERSEN ARCHITECT, LLC102/04/2025
JIAN ENGINEERING PLLC208/30/2024
JIMENEZ BUILDING CONSULTING LLC208/22/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO1803/21/2026
Streekout Solutions103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FRSS GROUP CORPGeneral Contractor1007/08/2026
SOLARBLOCKS ENERGY LLCGeneral Contractor107/08/2026
NICE PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JIAN ENGINEERING PLLC7397605/22/2025
THOMAS PETERSEN ARCHITECT7854102/04/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offFRSS GROUP09/11/2025
DOB NOWGeneral ConstructionPermit IssuedFRSS GROUP09/11/2025
DOB NOWSolarSigned-offSOLARBLOCKS ENERGY LLC02/27/2025
DOB NOWPlumbingSigned-offNICE PLUMBING CORP09/18/2024
DOB NOWGeneral ConstructionPermit IssuedFRSS GROUP09/17/2024
DOB NOWFoundationSigned-offFRSS GROUP09/11/2024
DOB NOWConstruction FenceSigned-offFRSS GROUP09/10/2024
DOB NOWStructuralSigned-offFRSS GROUP09/10/2024
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/19/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/28/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/28/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/26/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
07/09/2025Permanent certificateJIAN DENGenergy_progress
07/09/2025Exterior Insulation and Finish Systems (EIFS)JIAN DENGspecial
07/09/2025DemolitionJIAN DENGspecial
07/09/2025Fire-Resistant Penetrations and JointsJIAN DENGspecial
07/09/2025Structural Stability – Alterations of existing buildingsJIAN DENGspecial
07/09/2025Concrete - Cast-In-PlaceJIAN DENGspecial
07/09/2025MasonryJIAN DENGspecial
07/09/2025Maintenance informationJIAN DENGenergy_progress
07/09/2025Insulation placement and R valuesJIAN DENGenergy_progress
07/09/2025Electric vehicle service equipment requirementsJIAN DENGenergy_progress
07/09/2025Protection of exposed foundation insulationJIAN DENGenergy_progress
07/09/2025Fenestration and door U-factor and product ratingsJIAN DENGenergy_progress
07/09/2025Air barrier — testing JIAN DENGenergy_progress
07/09/2025Interior lighting powerJIAN DENGenergy_progress
07/09/2025Fenestration air leakageJIAN DENGenergy_progress
07/09/2025Air barrier - visual inspectionJIAN DENGenergy_progress
07/09/2025Fenestration areasJIAN DENGenergy_progress
05/22/2025Concrete - Cast-In-PlaceJIAN DENGspecial
05/22/2025DemolitionJIAN DENGspecial
05/22/2025Exterior Insulation and Finish Systems (EIFS)JIAN DENGspecial
05/22/2025Fire-Resistant Penetrations and JointsJIAN DENGspecial
05/22/2025MasonryJIAN DENGspecial
05/22/2025Structural Stability – Alterations of existing buildingsJIAN DENGspecial
05/22/2025Air barrier — testing JIAN DENGenergy_progress
05/22/2025Insulation placement and R valuesJIAN DENGenergy_progress
Latest 25 of 74.
▾Documents — 95 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/21/2026Q01060680-S1Request digital key ↗
08/21/2026Q01098561-I1Request digital key ↗
08/21/2026Q01176514-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q01068500-P2Open ↗
08/13/2026Q01068500-I1Open ↗
08/13/2026Q01060680-I1Open ↗
▸Seals & Professional Certifications62
▸DOB NOWProgress Inspector Seal & Signature32
09/01/2026Q01068500-S3Open ↗
09/01/2026Q01068500-S3Open ↗
08/29/2026Q01176514-I1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/01/2026Q01068500-S3Open ↗
09/01/2026Q01068500-S3Open ↗
09/01/2026Q01068500-S3Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/21/2026Q01098561-I1Open ↗
08/20/2026Q01068500-P2Open ↗
08/20/2026Q01068500-P1Open ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/20/2026Q01068500-P2Open ↗
08/20/2026Q01068500-P1Open ↗
08/20/2026Q01068500-S3Open ↗
Showing 3 of 9 on file for this type
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01068500-S3Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q01068500-S3Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/21/2026Q01176514-I1Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial3
08/13/2026Q01068500-I1Open ↗
08/13/2026Q01068500-P2Open ↗
08/13/2026Q01060680-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q01068500-P2Open ↗
08/13/2026Q01068500-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/20/2026Q01068500-P2Open ↗
08/20/2026Q01068500-I1Open ↗
▸DOB NOWFinal Survey1
08/20/2026Q01068500-I1Open ↗