← Back
Zoned commercial or Manhattan residential
73-97 EMPIRE BOULEVARD
BROOKLYN · BIN 3430340
💬 Discuss this project
0Year Built
—Stories
V1Building Class
C4-4DZoning
0 sfGross Floor Area
0Units
4 Open Violations 0 unresolved · 4 paperwork only ▸FDNY Report ↗
Zoned commercial or Manhattan residential · Owner of record: EMPIRE MCKEEVER HEIGHTS LLC · 38,118 sf lot · 0 FAR built · Flood zone X
Locations of Work
StructuralPlumbingFire Protection
Permit Issued — active, not yet Signed-off
CellarUnder Construction9p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HSD CONSTRUCTION309/13/2026
GALAXY DEVELOPERS1408/26/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/18/2025$42.5M—EMPIRE BOULEVARD HOLDINGS LLC → EMPIRE MCKEEVER HEIGHTS LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GALAXY DEVELOPERS LLCGeneral Contractor408/26/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
20/20 INSPECTIONS INC1471307/20/2026
Building Lifecycle
All (56)Filed (8)Permit Issued (4)Objection (20)Special Inspection (24)
08/25/2026
Permit issued — Foundation
B01316678-S1-FO-EA
07/30/2026
Permit issued — Support of Excavation
B01316678-S3-SE
07/20/2026
Filed — New Building
PROPOSED 14 STORY MIX-USE DEVELOPMENT (RESIDENTIAL & COMMERCIAL)
B01316678-P1
07/20/2026
Special inspection requirement — Structural Steel - Welding
JACOB HAAS
07/20/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
JACOB HAAS
07/20/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
JACOB HAAS
07/20/2026
Special inspection requirement — Concrete - Cast-In-Place
JACOB HAAS
07/20/2026
Special inspection requirement — Subgrade Inspections
JACOB HAAS
07/16/2026
Permit issued — Construction Fence
B01426638-I1-FN
07/14/2026
Filed — Alteration
PROPOSED TEMPORARY 8' HIGH CONSTRUCTION FENCE
B01426638-I1
07/09/2026
Permit issued — Support of Excavation
B01316678-S3-SE
06/11/2026
Objection resolved — Resolved
06/09/2026
Objection raised — Other
06/02/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Addressed
03/24/2026
Objection resolved — Addressed
03/24/2026
Objection resolved — Addressed
03/23/2026
Objection raised — Other
03/11/2026
Filed — New Building
PROPOSED 14 STORY MIX-USE DEVELOPMENT (RESIDENTIAL & COMMERCIAL)
B01316678-S6
03/11/2026
Special inspection requirement — Duct leakage testing, insulation and design
03/11/2026
Special inspection requirement — Lighting controls
03/11/2026
Special inspection requirement — Lighting in dwelling units
03/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/11/2026
Special inspection requirement — Metering
03/11/2026
Special inspection requirement — Exterior lighting power
03/11/2026
Special inspection requirement — Maintenance information
03/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/11/2026
Special inspection requirement — Shutoff dampers
03/11/2026
Special inspection requirement — Electrical motors and elevators
03/11/2026
Special inspection requirement — Emergency and Standby Power Systems (Generator)
03/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/11/2026
Special inspection requirement — Interior lighting power
03/03/2026
Objection raised — Other
02/19/2026
Objection raised — Other
02/19/2026
Objection raised — Other
02/19/2026
Objection raised — Other
02/19/2026
Objection raised — Other
02/17/2026
Objection resolved — Addressed
02/17/2026
Special inspection requirement — Final
02/17/2026
Special inspection requirement — Mechanical Systems
02/11/2026
Filed — New Building
PROPOSED 14 STORY MIX-USE DEVELOPMENT (RESIDENTIAL & COMMERCIAL)
B01316678-S3
02/05/2026
Objection raised — Other
02/05/2026
Objection raised — Other
02/04/2026
Objection raised — Other
01/29/2026
Objection raised — Other
01/28/2026
Filed — New Building
PROPOSED 14 STORY MIX-USE DEVELOPMENT (RESIDENTIAL & COMMERCIAL)
B01316678-S5
01/28/2026
Special inspection requirement — Sprinkler Systems
01/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/28/2026
Special inspection requirement — Standpipe Systems
01/23/2026
Filed — New Building
PROPOSED 14 STORY MIX-USE DEVELOPMENT (RESIDENTIAL & COMMERCIAL)
B01316678-S1
01/20/2026
Filed — New Building
PROPOSED 14 STORY MIX-USE DEVELOPMENT (RESIDENTIAL & COMMERCIAL)
B01316678-S4
01/08/2026
Objection resolved — Addressed
01/02/2026
Objection raised — Other
12/04/2025
Filed — New Building
PROPOSED 14 STORY MIX-USE DEVELOPMENT (RESIDENTIAL & COMMERCIAL)
B01316678-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedGALAXY DEVELOPERS LLC08/25/2026
DOB NOWSupport of ExcavationPermit IssuedGALAXY DEVELOPERS LLC07/30/2026
DOB NOWConstruction FencePermit IssuedGALAXY DEVELOPERS LLC07/16/2026
DOB NOWSupport of ExcavationPermit IssuedGALAXY DEVELOPERS LLC07/09/2026
1 project · most recent 07/20/2026
Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/20/2026Permit IssuedGALAXY DEVELOPERS LLCAir Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Daikin REYA120AATJA 120,000 BTU · Vrf Outdoor ×2
REYA72AATJA 72,000 BTU · Vrf Outdoor ×1
REYA96AATJA 96,000 BTU · Vrf Outdoor ×1
Heat / Cool
Daikin RXTA36AAVJU 37,000 BTU · Vrf Outdoor ×59
RXTA24AAVJU 25,000 BTU · Vrf Outdoor ×40
FXSA15AAVJU 15,000 BTU · Vrf Indoor ×30
FXSA18AAVJU 18,000 BTU · Vrf Indoor ×30
FXSA24AAVJU 24,000 BTU · Vrf Indoor ×30
FXSA30AAVJU 30,000 BTU · Vrf Indoor ×30
FXSA36AAVJU 36,000 BTU · Vrf Indoor ×30
FXSA48AAVJU 48,000 BTU · Vrf Indoor ×30
FXSA54AAVJU 54,000 BTU · Vrf Indoor ×30
FXSA12AAVJU 13,500 BTU · Vrf Indoor ×12
Ventilation
Greenheck AX-63-160-0635-A50 5,000 CFM · Exhaust Fan ×2
AX-72-190 11,520 CFM · Exhaust Fan ×1
USF-12 850 CFM · Exhaust Fan ×1
USF-13-B7 1,674 BTU · Exhaust Fan ×1
USF-15-B7 1,150 CFM · Exhaust Fan ×1
Aaon RNA-031 8,000 CFM · Doas ×1
1 project · most recent 07/20/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/20/2026——Gas, Storm, Water/Sanitary
1 project · most recent 11/24/2025
General Wiring
FiledStatusContractorScope
11/24/2025Permit IssuedM.R. ELEC'L SERVICE LLCGeneral Wiring
1 project · most recent 07/20/2026
FiledStatusContractorScope
07/20/2026Permit IssuedGALAXY DEVELOPERS LLC4 scope_items
1 project · most recent 07/14/2026
Fence
FiledStatusContractorScope
07/14/2026Permit IssuedGALAXY DEVELOPERS LLCFence
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
07/20/2026Structural Steel - WeldingJACOB HAASspecial
07/20/2026Excavations - Sheeting, Shoring, and BracingJACOB HAASspecial
07/20/2026Subsurface Conditions – Fill Placement & In-Place DensityJACOB HAASspecial
07/20/2026Concrete - Cast-In-PlaceJACOB HAASspecial
07/20/2026Subgrade InspectionsJACOB HAASspecial
03/11/2026Duct leakage testing, insulation and design—energy_progress
03/11/2026Lighting controls—energy_progress
03/11/2026Lighting in dwelling units—energy_progress
03/11/2026HVAC-R and service water piping design and insulation—energy_progress
03/11/2026Metering—energy_progress
03/11/2026Exterior lighting power—energy_progress
03/11/2026Maintenance information—energy_progress
03/11/2026HVAC-R and service water heating equipment—energy_progress
03/11/2026Shutoff dampers—energy_progress
03/11/2026Electrical motors and elevators—energy_progress
03/11/2026Emergency and Standby Power Systems (Generator)—special
03/11/2026Fire-Resistant Penetrations and Joints—special
03/11/2026HVAC-R and service water heating system controls—energy_progress
03/11/2026Interior lighting power—energy_progress
02/17/2026Final—progress
02/17/2026Mechanical Systems—special
01/28/2026Sprinkler Systems—special
01/28/2026Fire-Resistant Penetrations and Joints—special
01/28/2026Standpipe Systems—special
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/18/2026B01316678-P1Request digital key ↗
08/18/2026B01316678-I1Request digital key ↗
08/16/2026B01426638-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records10
▸DOB NOWRestrictive Declaration/Easement 17
08/18/2026B01316678-P1Open ↗
08/15/2026B01316678-I1Open ↗
08/15/2026B01316678-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026B01316678-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/15/2026B01316678-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026B01316678-I1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/18/2026B01316678-S3Open ↗
08/18/2026B01316678-S4Open ↗
08/18/2026B01316678-S5Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026B01316678-P1Open ↗
09/02/2026B01316678-P1Open ↗
09/02/2026B01316678-P1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/15/2026B01316678-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist1
08/15/2026B01316678-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026B01316678-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWOER: Notice to Proceed5
08/15/2026B01316678-I1Open ↗
08/15/2026B01316678-S1Open ↗
08/15/2026B01316678-S4Open ↗
Showing 3 of 5 on file for this type
▸Other Documents5
▸DOB NOWAdjoining Owners Notification2
08/15/2026B01316678-S1Open ↗
08/15/2026B01316678-S3Open ↗
▸DOB NOWSite Survey: Initial1
08/15/2026B01316678-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/15/2026B01316678-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026B01316678-I1Open ↗