← Back
Two stories - detached, small or mid-size
73 BELL POINT DRIVE
BROOKLYN · BIN 3412714
💬 Discuss this project
2005Year Built
2.5Stories
A1Building Class
R3-1Zoning
—Gross Floor Area
1Units
Two stories - detached, small or mid-size · 0.58 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STRICKLAND AVENUE REALTY CORP.503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC112/01/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAMY MOUNASElectrical103/21/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272112/01/2023
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
02/13/2024
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00968170-I1
12/19/2023
Permit issued — Solar
B00968170-I1-SL
12/01/2023
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00968170-I1
11/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
11/28/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
11/28/2023
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
11/28/2023
Special inspection requirement — Final
Walid Abdulla
11/28/2023
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC12/19/2023
BISPLISSUEDPERFECT PL & HTG08/08/2006
BIS—ISSUEDH & H BLDRS08/07/2006
BISEQISSUEDH & H BLDRS08/07/2006
BIS—ISSUEDH & H BLDRS06/21/2005
BISEQISSUEDH & H BLDRS06/21/2005
BISPLISSUEDPERFECT PL & HTG04/05/2005
BISEQISSUEDH & H BLDRS03/08/2005
BIS—ISSUEDH & H BLDRS03/08/2005
BISEQISSUEDH & H BLDRS10/06/2004
1 project · most recent 11/30/2023
FiledStatusContractorScope
11/30/2023CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
11/28/2023Fire-Resistant Penetrations and JointsWalid Abdullaspecial
11/28/2023Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
11/28/2023Energy Code Compliance InspectionsWalid Abdullaprogress
11/28/2023FinalWalid Abdullaprogress
11/28/2023Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/26/2026B00968170-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026B00968170-I1Open ↗
08/28/2026B00968170-I1Open ↗
08/28/2026B00968170-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026B00968170-I1Open ↗
08/28/2026B00968170-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B00968170-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B00968170-I1Open ↗