← Back
STATEN ISLAND
73 CEDAR TERRACE
STATEN ISLAND · BIN 5174972
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructuralFire Protection
Floor 333p · 1 filing · 20 docs
Floor 235p · 2 filings · 20 docs
Floor 133p · 1 filing · 20 docs
Basement33p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CUTRONA ARCHITECTURE PLLC812/19/2023
A TECH ENGINEERING NYC, PLLC.101/27/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L. GASS1003/21/2026
PATRICIA L GASS603/21/2026
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JED 74 LLCGeneral Contractor807/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing207/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738612/19/2023
Building Lifecycle
All (52)Filed (9)Permit Issued (8)Signed Off (4)Inspection (11)Objection (20)
12/19/2023
Filed — New Building
SITE & INTERIOR PLUMBING WORK RELATED TO BUILD FILING NB S08002302-I1.
S08002302-P9
11/16/2023
Signed off — New Building
SITE & INTERIOR PLUMBING WORK RELATED TO BUILD FILING NB S08002302-I1.
S08002302-S1
11/13/2023
Objection raised — Scope
11/13/2023
Objection resolved — Addressed
10/31/2023
Signed off — New Building
SITE & INTERIOR PLUMBING WORK RELATED TO BUILD FILING NB S08002302-I1.
S08002302-S2
10/31/2023
Signed off — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME
S08006762-I1
10/24/2023
Filed — New Building
SITE & INTERIOR PLUMBING WORK RELATED TO BUILD FILING NB S08002302-I1.
S08002302-P7
10/19/2023
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
10/18/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/18/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/10/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/04/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/04/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/27/2023
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE FOR LOT 54 & LOT 55 (73 & 75 CEDAR TERRACE)
S00466406-I1
09/20/2023
Filed — New Building
SITE & INTERIOR PLUMBING WORK RELATED TO BUILD FILING NB S08002302-I1.
S08002302-P6
09/01/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/23/2023
Permit issued — Curb Cut
S08002302-S2-CC
07/26/2023
Permit issued — General Construction
S08002302-I1-GC-CX
07/14/2023
Permit issued — Construction Fence
S00466406-I1-FN
06/21/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/23/2023
Permit issued — Plumbing
S08006762-I1-PL
03/10/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
02/22/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
02/16/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/01/2023
Permit issued — Plumbing
S62714307-S1-PL
01/30/2023
Permit issued — Plumbing
S08002302-S1-PL
01/27/2023
Filed — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME
S08006762-I1
01/26/2023
Permit issued — Structural
S08002302-I1-GC-CX
01/19/2023
Objection raised — Scope
01/19/2023
Objection resolved — Addressed
01/16/2023
Filed — New Building
SITE & INTERIOR PLUMBING WORK RELATED TO BUILD FILING NB S08002302-I1.
S08002302-P3
10/12/2022
Permit issued — Construction Fence
S00466406-I1-FN
10/04/2022
Objection raised — Mechanical
10/04/2022
Objection resolved — Addressed
10/04/2022
Objection raised — Zoning
10/04/2022
Objection resolved — Addressed
10/04/2022
Objection raised — Zoning
10/04/2022
Objection resolved — Addressed
10/04/2022
Objection raised — Zoning
10/04/2022
Objection resolved — Addressed
10/04/2022
Objection raised — Scope
10/04/2022
Objection resolved — Addressed
10/04/2022
Objection raised — Zoning
10/04/2022
Objection resolved — Addressed
09/23/2022
Filed — New Building
SITE & INTERIOR PLUMBING WORK RELATED TO BUILD FILING NB S08002302-I1.
S08002302-S2
09/22/2022
Filed — New Building
SITE & INTERIOR PLUMBING WORK RELATED TO BUILD FILING NB S08002302-I1.
S08002302-S1
09/19/2022
Filed — New Building
SITE & INTERIOR PLUMBING WORK RELATED TO BUILD FILING NB S08002302-I1.
S08002302-I1
04/05/2021
Objection raised — Structural
04/05/2021
Objection resolved — Addressed
04/05/2021
Objection raised — Structural
04/05/2021
Objection resolved — Addressed
04/02/2021
Filed — Alteration
INSTALLATION OF CONSTRUCTION FENCE FOR LOT 54 & LOT 55 (73 & 75 CEDAR TERRACE)
S00466406-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offJED 7408/23/2023
DOB NOWGeneral ConstructionPermit IssuedJED 7407/26/2023
DOB NOWConstruction FenceSigned-offJED 7407/14/2023
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR05/23/2023
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR02/01/2023
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC01/30/2023
DOB NOWStructuralPermit IssuedJED 7401/26/2023
DOB NOWConstruction FenceSigned-offJED 7410/12/2022
1 project · most recent 12/19/2023
Associated Ducts and Piping Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/19/2023Signed-offJED 74 LLCAssociated Ducts and Piping, Heating and Air Conditioning Systems
Heat / Cool
Ruud R921TA0603A17M4SNAS - 92% AFUE 52,000 BTU · Furnace ×2
R92TA0603A17M4SNAS - 92% AFUE 52,000 BTU · Furnace ×2
RA14AZ24AJ1NA+RCFL-HM2417AC729+U96VA0602317MSA 23,400 BTU · Condensing Unit ×2
RA14AZ24AJ1NA+RCFZ2417STANMC 23,550 BTU · Split System ×2
Trane 4TTR4018L1+4TXCB003DS3+S9X1B040U3PSB 19,200 BTU · Split System ×4
S9X1B040U3PSB - 96% AFUE 39,000 BTU · Furnace ×4
Ducts & Piping
Generic GENERIC 1 CFM ×4
1 project · most recent 12/19/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/19/2023Signed-offQUALITY PLUMBING, INCGas, Storm, Water/Sanitary
1 project · most recent 06/05/2023
General Wiring
FiledStatusContractorScope
06/05/2023CompleteMANGI ELECTRICAL CORPGeneral Wiring
1 project · most recent 12/19/2023
Steel Concrete Wood
FiledStatusContractorScope
12/19/2023Signed-offJED 74 LLCSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
10/19/2023Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
10/18/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/04/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/04/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
09/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/10/2023Pass-Final PL - UndergroundPassView ↗
02/22/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
02/16/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 116
DateRequirementInspectorRole
01/11/2024Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
01/11/2024Electric vehicle service equipment requirementsanthony santoroenergy_progress
01/11/2024Maintenance informationanthony santoroenergy_progress
01/11/2024Air barrier — testing anthony santoroenergy_progress
01/11/2024HVAC-R and service water heating system controlsanthony santoroenergy_progress
01/11/2024Protection of exposed foundation insulationanthony santoroenergy_progress
01/11/2024HVAC-R and service water piping design and insulationanthony santoroenergy_progress
01/11/2024Duct leakage testing, insulation and designanthony santoroenergy_progress
01/11/2024Ventilation and air distribution systemanthony santoroenergy_progress
01/11/2024Air barrier - visual inspectionanthony santoroenergy_progress
01/11/2024Interior lighting poweranthony santoroenergy_progress
01/11/2024HVAC-R and service water heating equipmentanthony santoroenergy_progress
01/11/2024Fenestration areasanthony santoroenergy_progress
01/11/2024Fenestration air leakageanthony santoroenergy_progress
01/11/2024Permanent certificateanthony santoroenergy_progress
01/11/2024Insulation placement and R valuesanthony santoroenergy_progress
01/11/2024Finalanthony santoroprogress
01/11/2024Footing and Foundationanthony santoroprogress
01/11/2024Subsurface Investigations (Borings/Test Pits)anthony santorospecial
01/11/2024Subgrade Inspectionsanthony santorospecial
01/11/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
01/11/2024Mechanical Systemsanthony santorospecial
01/11/2024Heating Systemsanthony santorospecial
01/11/2024Structural Steel - High Strength Boltinganthony santorospecial
01/11/2024Exterior Insulation and Finish Systems (EIFS)anthony santorospecial
Latest 25 of 116.
▾Documents — 94 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch8
08/24/2026S08002302-P6Request digital key ↗
08/24/2026S08002302-S2Request digital key ↗
08/24/2026S08002302-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/15/2026S00466406-I1Request digital key ↗
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
12/27/2022540232167Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
07/06/2022540232167Open ↗
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZD1: DOB Zoning Diagram4
08/15/2026S08002302-P7Open ↗
08/15/2026S08002302-I1Open ↗
08/14/2026S08002302-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/15/2026S08002302-P7Open ↗
08/15/2026S08002302-I1Open ↗
08/14/2026S08002302-P3Open ↗
Showing 3 of 4 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
12/27/2022540232167Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S08002302-I1Open ↗
▸Seals & Professional Certifications35
▸DOB NOWProgress Inspector Seal & Signature12
08/31/2026S08002302-I1Open ↗
08/31/2026S08002302-I1Open ↗
08/31/2026S08002302-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
08/31/2026S08002302-I1Open ↗
08/31/2026S08002302-I1Open ↗
08/31/2026S08002302-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/25/2026S00466406-I1Open ↗
08/24/2026S08002302-I1Open ↗
08/24/2026S08002302-P3Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/06/2022540232167Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/06/2022540232167Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/15/2026S08002302-P7Open ↗
08/15/2026S08002302-I1Open ↗
08/14/2026S08002302-P3Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist4
08/15/2026S08002302-P7Open ↗
08/15/2026S08002302-I1Open ↗
08/13/2026S08002302-P9Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S08002302-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S08002302-I1Open ↗
▸Inspections & Test Reports10
▸DOB NOWSOIL REPORT6
08/24/2026S08002302-S1Open ↗
08/15/2026S08002302-P7Open ↗
08/15/2026S08002302-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026S08002302-S1Open ↗
08/13/2026S08002302-I1Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
07/06/2022540232167Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/06/2022540232167Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
07/06/2022540232167Open ↗
▸Other Documents17
▸DOB NOWSite Survey: Initial4
08/15/2026S08002302-P7Open ↗
08/15/2026S08002302-I1Open ↗
08/14/2026S08002302-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/15/2026S08002302-P7Open ↗
08/15/2026S08002302-I1Open ↗
08/14/2026S08002302-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/15/2026S08002302-P7Open ↗
08/15/2026S08002302-I1Open ↗
08/14/2026S08002302-P3Open ↗
Showing 3 of 4 on file for this type
▸BISWAIVER OF ALL IMPROVIVEMENTS IN RIDGEFIELD AVE1
12/27/2022540232167Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
07/06/2022540232167Open ↗
▸BISWAIVER OF CURB ALIGNMENT - CEDAR TERRACE1
12/27/2022540232167Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
07/06/2022540232167Open ↗
▸DOB NOWFinal Survey1
08/13/2026S08002302-I1Open ↗