73 EMPIRE BOULEVARD
BROOKLYN · BIN 3430338
💬 Discuss this project
0Year Built
—Stories
V1Building Class
C4-4DZoning
0 sfGross Floor Area
0Units
4 Active Violations 0 unresolved · 4 paperwork only ▸FDNY Report ↗
Zoned commercial or Manhattan residential · Owner of record: Empire McKeever Heights · 38,118 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsThe Rabsky GroupUnder Construction1 filing
Site & exteriorTemporary construction fenceUnder Construction1 filing
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/18/2025$42.5M—EMPIRE BOULEVARD HOLDINGS LLC → EMPIRE MCKEEVER HEIGHTS LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Galaxy DevelopersGeneral Contractor209/01/2026
CS BridgeScaffold107/16/2026
Galaxy DevelopersScaffold107/16/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
20/20 Inspections1471307/20/2026
Building Lifecycle
All (76)Filed (9)Permit Issued (5)Signed Off (1)Violation (3)Objection (28)Special Inspection (30)
10/07/2026
Signed off — New Building
Structure for a new 14 story mix use building
B01316595-S9
10/02/2026
Permit issued — Support of Excavation
B01316595-S3-SE
08/31/2026
Permit issued — Earth Work
B01316595-S1-FO-EA
07/30/2026
Special inspection requirement — Structural Steel - Welding
JACOB HAAS
07/30/2026
Special inspection requirement — Subgrade Inspections
JACOB HAAS
07/30/2026
Special inspection requirement — Concrete - Cast-In-Place
JACOB HAAS
07/30/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
JACOB HAAS
07/30/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
JACOB HAAS
07/29/2026
Permit issued — Support of Excavation
B01316595-S3-SE
07/20/2026
Filed — New Building
Structure for a new 14 story mix use building
B01316595-P1
07/20/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
JACOB HAAS
07/20/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
JACOB HAAS
07/20/2026
Special inspection requirement — Subgrade Inspections
JACOB HAAS
07/20/2026
Special inspection requirement — Structural Steel - Welding
JACOB HAAS
07/20/2026
Special inspection requirement — Concrete - Cast-In-Place
JACOB HAAS
07/15/2026
Filed — New Building
Structure for a new 14 story mix use building
B01316595-S9
07/15/2026
Permit issued — Sidewalk Shed
B01316595-S9-SH
07/15/2026
Permit issued — Construction Fence
B01426631-I1-FN
07/14/2026
Filed — Alteration
PROPOSED TEMPORARY 8' HIGH CONSTRUCTION FENCE
B01426631-I1
06/11/2026
Objection resolved — Resolved
06/09/2026
Objection raised — Other
06/02/2026
Objection resolved — Addressed
04/10/2026
Objection resolved — Addressed
04/06/2026
Objection raised — Structural
03/31/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Addressed
03/25/2026
Objection raised — Other
03/24/2026
Objection resolved — Addressed
03/24/2026
Objection resolved — Addressed
03/11/2026
Filed — New Building
Structure for a new 14 story mix use building
B01316595-S7
03/11/2026
Special inspection requirement — Maintenance information
03/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/03/2026
Objection raised — Other
02/19/2026
Objection raised — Other
02/19/2026
Objection raised — Other
02/19/2026
Objection raised — Other
02/19/2026
Objection raised — Other
02/17/2026
Objection resolved — Addressed
02/17/2026
Special inspection requirement — Duct leakage testing, insulation and design
02/17/2026
Special inspection requirement — Mechanical Systems
02/17/2026
Special inspection requirement — Emergency and Standby Power Systems (Generator)
02/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/17/2026
Special inspection requirement — Final
02/17/2026
Special inspection requirement — Interior lighting power
02/17/2026
Special inspection requirement — Maintenance information
02/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
02/17/2026
Special inspection requirement — Electrical motors and elevators
02/17/2026
Special inspection requirement — Lighting controls
02/17/2026
Special inspection requirement — Metering
02/17/2026
Special inspection requirement — Exterior lighting power
02/17/2026
Special inspection requirement — Lighting in dwelling units
02/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/17/2026
Special inspection requirement — Shutoff dampers
02/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/12/2026
Objection resolved — Addressed
02/11/2026
Filed — New Building
Structure for a new 14 story mix use building
B01316595-S3
02/11/2026
Objection resolved — Addressed
02/05/2026
Objection raised — Other
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupport of ExcavationPermit IssuedFresh Meadow Mechanical10/02/2026
DOB NOWEarth WorkPermit IssuedGalaxy Developers08/31/2026
DOB NOWSupport of ExcavationPermit IssuedGalaxy Developers07/29/2026
DOB NOWSidewalk ShedSigned-offCS Bridge07/15/2026
DOB NOWConstruction FencePermit IssuedGalaxy Developers07/15/2026
1 project · most recent 07/20/2026
Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/20/2026Permit IssuedGalaxy DevelopersAir Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Daikin REYA120AATJA 120,000 BTU · Vrf Outdoor ×20
REYA96AATJA 96,000 BTU · Vrf Outdoor ×8
Heat / Cool
Daikin FXSA36AAVJU 48,000 BTU · Vrf Indoor ×240
RRXTA36AAVJU 37,000 BTU · Vrf Outdoor ×236
FXSA24AAVJU 24,000 BTU · Vrf Indoor ×120
FXSA30AAVJU 30,000 BTU · Vrf Indoor ×120
FXSA54AAVJU 54,000 BTU · Vrf Indoor ×120
FXSA15AAVJU 15,000 BTU · Vrf Indoor ×104
FSXA18AAVJU 18,000 BTU · Vrf Indoor ×52
FXSA12AAVJU 12,000 BTU · Vrf Indoor ×48
RXTA24AAVJU 25,000 BTU · Vrf Outdoor ×4
Ventilation
Greenheck AX-72-190 135,000 CFM · Exhaust Fan ×8
AX-63-160-0635-A50 6,000 CFM · Exhaust Fan ×4
USF-12 850 CFM · Exhaust Fan ×4
USF-15-B7 1,050 BTU · Exhaust Fan ×4
Aaon RNA-030 175,200 BTU · Doas ×4
1 project · most recent 07/20/2026
Sprinkler System
FiledStatusContractorScope
07/20/2026——Sprinkler System
1 project · most recent 07/20/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/20/2026——Gas, Storm, Water/Sanitary
2 projects · most recent 09/09/2026
General Wiring
FiledStatusContractorScope
09/09/2026Permit IssuedM.R. Electrical ServiceGeneral Wiring
07/10/2026Permit IssuedNash Electric Services—
1 project · most recent 07/20/2026
FiledStatusContractorScope
07/20/2026Permit IssuedGalaxy Developers4 scope_items
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
07/30/2026Structural Steel - WeldingJACOB HAASspecial
07/30/2026Subgrade InspectionsJACOB HAASspecial
07/30/2026Concrete - Cast-In-PlaceJACOB HAASspecial
07/30/2026Excavations - Sheeting, Shoring, and BracingJACOB HAASspecial
07/30/2026Subsurface Conditions – Fill Placement & In-Place DensityJACOB HAASspecial
07/20/2026Excavations - Sheeting, Shoring, and BracingJACOB HAASspecial
07/20/2026Subsurface Conditions – Fill Placement & In-Place DensityJACOB HAASspecial
07/20/2026Subgrade InspectionsJACOB HAASspecial
07/20/2026Structural Steel - WeldingJACOB HAASspecial
07/20/2026Concrete - Cast-In-PlaceJACOB HAASspecial
03/11/2026Maintenance information—energy_progress
03/11/2026HVAC-R and service water heating system controls—energy_progress
03/11/2026HVAC-R and service water heating equipment—energy_progress
03/11/2026HVAC-R and service water piping design and insulation—energy_progress
02/17/2026Duct leakage testing, insulation and design—energy_progress
02/17/2026Mechanical Systems—special
02/17/2026Emergency and Standby Power Systems (Generator)—special
02/17/2026Fire-Resistant Penetrations and Joints—special
02/17/2026Final—progress
02/17/2026Interior lighting power—energy_progress
02/17/2026Maintenance information—energy_progress
02/17/2026HVAC-R and service water heating equipment—energy_progress
02/17/2026Electrical motors and elevators—energy_progress
02/17/2026Lighting controls—energy_progress
02/17/2026Metering—energy_progress
Latest 25 of 57.
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/18/2026B01316595-S9Request digital key ↗
08/18/2026B01316595-I1Request digital key ↗
08/18/2026B01316595-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records12
▸DOB NOWRestrictive Declaration/Easement 19
08/18/2026B01316595-P1Open ↗
08/18/2026B01316595-S9Open ↗
08/14/2026B01316595-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026B01316595-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/14/2026B01316595-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/14/2026B01316595-I1Open ↗
▸Seals & Professional Certifications21
▸DOB NOWSpecial Inspector Seal & Signature11
10/09/2026B01316595-S3Open ↗
10/09/2026B01316595-S3Open ↗
10/09/2026B01316595-S3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/18/2026B01316595-P1Open ↗
08/18/2026B01316595-S9Open ↗
08/18/2026B01316595-S7Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026B01316595-S1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/14/2026B01316595-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist1
08/14/2026B01316595-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/14/2026B01316595-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWOER: Notice to Proceed5
08/15/2026B01316595-S3Open ↗
08/15/2026B01316595-S1Open ↗
08/14/2026B01316595-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice of Satisfaction1
08/15/2026B01316595-S3Open ↗
▸Other Documents5
▸DOB NOWAdjoining Owners Notification2
08/15/2026B01316595-S3Open ↗
08/15/2026B01316595-S1Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026B01316595-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/14/2026B01316595-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/14/2026B01316595-I1Open ↗