← Back
Two stories - detached, small or mid-size
73 GREENFIELD AVENUE
STATEN ISLAND · BIN 5042465
💬 Discuss this project
1899Year Built
2.5Stories
A1Building Class
R3-2Zoning
3,376 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 17,850 sf lot · 0.19 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction25p · 2 filings · 20 docs
Floor 1Under Construction25p · 2 filings · 20 docs
CellarUnder Construction28p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YANG ENGINEERING LLC606/09/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
REGAL CONSTRUCTION GROUPGeneral Contractor307/08/2026
AMM GEN'L CONTRACTING INCPlumbing207/08/2026
TIMOTHY COLEMAN LICENSEDElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JIAN ENGINEERING PLLC7397506/09/2026
Building Lifecycle
All (52)Filed (6)Permit Issued (4)Violation (2)Inspection (4)Objection (6)Special Inspection (30)
07/06/2026
Permit issued — Plumbing
S01181462-S1-PL
07/02/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JIAN DENG
06/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
JIAN DENG
06/10/2026
Special inspection requirement — Maintenance information
JIAN DENG
06/10/2026
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
06/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
06/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
JIAN DENG
06/09/2026
Filed — Alteration
PROPOSED PLUMBING WORK ON CELLAR, 1ST TO 2ND, ATTIC FLOOR, ROOF IN CONJUNCTION WITH DOB ALTERATION JOB #: S01181462-I1. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
S01181462-P3
06/08/2026
Special inspection requirement — Maintenance information
JIAN DENG
06/08/2026
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
06/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
JIAN DENG
06/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
06/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JIAN DENG
06/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
JIAN DENG
11/10/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/28/2025
Filed — Alteration
PROPOSED PLUMBING WORK ON CELLAR, 1ST TO 2ND, ATTIC FLOOR, ROOF IN CONJUNCTION WITH DOB ALTERATION JOB #: S01181462-I1. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
S01181462-P2
09/15/2025
Objection resolved — Addressed
09/15/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
08/20/2025
Objection raised — Scope
08/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
08/15/2025
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
08/15/2025
Special inspection requirement — Maintenance information
JIAN DENG
08/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
JIAN DENG
08/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
JIAN DENG
08/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JIAN DENG
08/08/2025
Filed — Alteration
PROPOSED PLUMBING WORK ON CELLAR, 1ST TO 2ND, ATTIC FLOOR, ROOF IN CONJUNCTION WITH DOB ALTERATION JOB #: S01181462-I1. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
S01181462-P1
08/07/2025
Special inspection requirement — Fenestration air leakage
JIAN DENG
08/07/2025
Special inspection requirement — Air barrier — testing
JIAN DENG
08/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JIAN DENG
08/07/2025
Special inspection requirement — Fenestration areas
JIAN DENG
08/07/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JIAN DENG
08/07/2025
Special inspection requirement — Insulation placement and R values
JIAN DENG
08/07/2025
Special inspection requirement — Air barrier - visual inspection
JIAN DENG
08/07/2025
Special inspection requirement — Interior lighting power
JIAN DENG
08/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
JIAN DENG
08/07/2025
Special inspection requirement — Lighting controls
JIAN DENG
08/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
JIAN DENG
06/24/2025
Permit issued — Plumbing
S01181462-S1-PL
06/03/2025
Permit issued — General Construction
S01181462-I1-GC
06/02/2025
Filed — Alteration
PROPOSED PLUMBING WORK ON CELLAR, 1ST TO 2ND, ATTIC FLOOR, ROOF IN CONJUNCTION WITH DOB ALTERATION JOB #: S01181462-I1. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
S01181462-S1
05/23/2025
Objection resolved — Addressed
05/21/2025
Objection raised — Cost
05/16/2025
Objection resolved — Addressed
04/14/2025
Permit issued — General Construction
S01178603-I1-GC
03/21/2025
Objection raised — Scope
02/17/2025
Filed — Alteration
PROPOSED PLUMBING WORK ON CELLAR, 1ST TO 2ND, ATTIC FLOOR, ROOF IN CONJUNCTION WITH DOB ALTERATION JOB #: S01181462-I1. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
S01181462-I1
02/13/2025
Filed — Alteration
PROPOSED INTERIOR RENOVATION AT CELLAR, 1ST TO 2ND FLOOR, AND ATTIC CEILING, FLOORING, PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
S01178603-I1
01/10/1990
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/10/1990
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAMM GEN'L CONTRACTING INC07/06/2026
DOB NOWPlumbingPermit IssuedAMM GEN'L CONTRACTING INC06/24/2025
DOB NOWGeneral ConstructionPermit IssuedREGAL CONSTRUCTION GROUP06/03/2025
DOB NOWGeneral ConstructionPermit IssuedREGAL CONSTRUCTION GROUP04/14/2025
1 project · most recent 06/09/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/09/2026Permit IssuedAMM GEN'L CONTRACTING INCGas, Storm, Water/Sanitary
1 project · most recent 06/24/2025
General Wiring
FiledStatusContractorScope
06/24/2025Permit IssuedTIMOTHY COLEMAN LICENSEDGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/02/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/10/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/10/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
06/10/2026HVAC-R and service water piping design and insulationJIAN DENGenergy_progress
06/10/2026HVAC-R and service water heating system controlsJIAN DENGenergy_progress
06/10/2026Maintenance informationJIAN DENGenergy_progress
06/10/2026Energy Code Compliance InspectionsJIAN DENGprogress
06/10/2026Fire-Resistant Penetrations and JointsJIAN DENGspecial
06/10/2026HVAC-R and service water heating equipmentJIAN DENGenergy_progress
06/08/2026Maintenance informationJIAN DENGenergy_progress
06/08/2026Energy Code Compliance InspectionsJIAN DENGprogress
06/08/2026HVAC-R and service water heating equipmentJIAN DENGenergy_progress
06/08/2026Fire-Resistant Penetrations and JointsJIAN DENGspecial
06/08/2026HVAC-R and service water piping design and insulationJIAN DENGenergy_progress
06/08/2026HVAC-R and service water heating system controlsJIAN DENGenergy_progress
09/15/2025Subsurface Investigations (Borings/Test Pits)—special
08/15/2025Fire-Resistant Penetrations and JointsJIAN DENGspecial
08/15/2025Energy Code Compliance InspectionsJIAN DENGprogress
08/15/2025Maintenance informationJIAN DENGenergy_progress
08/15/2025HVAC-R and service water heating equipmentJIAN DENGenergy_progress
08/15/2025HVAC-R and service water heating system controlsJIAN DENGenergy_progress
08/15/2025HVAC-R and service water piping design and insulationJIAN DENGenergy_progress
08/07/2025Fenestration air leakageJIAN DENGenergy_progress
08/07/2025Air barrier — testing JIAN DENGenergy_progress
08/07/2025HVAC-R and service water piping design and insulationJIAN DENGenergy_progress
08/07/2025Fenestration areasJIAN DENGenergy_progress
08/07/2025Fenestration and door U-factor and product ratingsJIAN DENGenergy_progress
08/07/2025Insulation placement and R valuesJIAN DENGenergy_progress
Latest 25 of 38.
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/20/2026S01178603-I1Request digital key ↗
08/18/2026S01181462-P1Request digital key ↗
08/18/2026S01181462-P4Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/18/2026S01181462-P4Open ↗
08/13/2026S01181462-P1Open ↗
08/13/2026S01181462-I1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature8
08/31/2026S01181462-P3Open ↗
08/31/2026S01181462-P3Open ↗
08/25/2026S01181462-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/18/2026S01181462-P4Open ↗
08/18/2026S01181462-P3Open ↗
08/13/2026S01178603-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/31/2026S01181462-P3Open ↗
08/25/2026S01181462-P1Open ↗
08/25/2026S01181462-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/18/2026S01181462-P4Open ↗
08/18/2026S01181462-P3Open ↗
08/13/2026S01181462-P2Open ↗
Showing 3 of 7 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT3
08/18/2026S01181462-P4Open ↗
08/13/2026S01181462-I1Open ↗
08/13/2026S01181462-P1Open ↗
▸Other Documents9
▸DOB NOWPlot Diagram3
08/18/2026S01181462-P4Open ↗
08/13/2026S01181462-P1Open ↗
08/13/2026S01181462-I1Open ↗
▸DOB NOWSite Survey: Initial3
08/18/2026S01181462-P4Open ↗
08/13/2026S01181462-P1Open ↗
08/13/2026S01181462-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/18/2026S01181462-P4Open ↗
08/13/2026S01181462-P1Open ↗
08/13/2026S01181462-I1Open ↗