Elevator apt, fireproof without stores
73 MCGUINNESS BOULEVARD
BROOKLYN · BIN 3066193
💬 Discuss this project
2022Year Built
8Stories
D3Building Class
R7AZoning
20,692 sfGross Floor Area
21Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: GW BLVD LLC · 4,167 sf lot · 4.97 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneralOther
Roof55p · 1 filing · 20 docs
Floor 850p · 1 filing · 20 docs
Floor 752p · 1 filing · 20 docs
Floor 653p · 1 filing · 20 docs
Floor 550p · 1 filing · 20 docs
Floor 452p · 1 filing · 20 docs
Floor 349p · 1 filing · 20 docs
Floor 251p · 1 filing · 20 docs
Floor 152p · 1 filing · 20 docs
Cellar57p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BLUE SHINE BUILDERS INC DBA BLUE SK707/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/29/2019$2.2M—75 MCGUINNESS BLVD, LLC → Private party— not available
09/10/2015$2.4M—75 MCGUINNESS LLC → 75 MCGUINNESS BLVD, LLC— not available
11/22/2013$1.3M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AJ SERVICE EXPERTS3003/21/2026
AVALON DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INNOVATIVE CONSTR NYC LLCGeneral Contractor1907/08/2026
MANHATTAN D ENTERPRISESGeneral Contractor707/08/2026
BLUE SHINE BUILDERS INCGeneral Contractor603/21/2026
PRIME PIPING & HEATING INPlumbing407/08/2026
STAR ELECL CONTRACTORS C 003267General Contractor203/22/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
PRIME PIPING HEATING INGeneral Contractor103/22/2026
SOLAS ELECTRICAL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.394306/22/2023
HRF SERVICES CORP56161106/20/2023
Building Lifecycle
All (148)Filed (19)Permit Issued (15)Signed Off (9)Violation (5)Inspection (9)Objection (61)Special Inspection (30)
07/09/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/15/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/24/2023
Signed off — New Building
Install wet sprinklers in the entire building in conjunction with B00645194
B00645194-S5
08/23/2023
Signed off — New Building
Install wet sprinklers in the entire building in conjunction with B00645194
B00645194-S6
08/23/2023
Signed off — New Building
Install wet sprinklers in the entire building in conjunction with B00645194
B00645194-S8
06/30/2023
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
06/27/2023
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
06/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
06/27/2023
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
06/27/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
06/27/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
06/27/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
06/26/2023
Objection resolved — Addressed
06/23/2023
Objection raised — Other
06/22/2023
Filed — New Building
Install wet sprinklers in the entire building in conjunction with B00645194
B00645194-P7
06/22/2023
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
06/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
Paul Raymond
06/22/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Raymond
06/22/2023
Special inspection requirement — Maintenance information
Paul Raymond
06/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
Paul Raymond
06/22/2023
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
06/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
06/20/2023
Filed — New Building
Install wet sprinklers in the entire building in conjunction with B00645194
B00645194-P6
06/06/2023
Special inspection requirement — Final
FAHAD FATEH
06/06/2023
Special inspection requirement — Mechanical Systems
FAHAD FATEH
06/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/06/2023
Special inspection requirement — Heating Systems
FAHAD FATEH
06/06/2023
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
06/06/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
06/06/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
06/06/2023
Special inspection requirement — Duct leakage testing, insulation and design
FAHAD FATEH
06/06/2023
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
06/06/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
06/02/2023
Filed — New Building
Install wet sprinklers in the entire building in conjunction with B00645194
B00645194-P5
06/02/2023
Signed off — New Building
Install wet sprinklers in the entire building in conjunction with B00645194
B00645194-S2
05/30/2023
Signed off — New Building
Install wet sprinklers in the entire building in conjunction with B00645194
B00645194-S3
05/18/2023
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
05/18/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
05/18/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
05/18/2023
Special inspection requirement — Duct leakage testing, insulation and design
FAHAD FATEH
05/18/2023
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
05/18/2023
Special inspection requirement — Heating Systems
FAHAD FATEH
05/18/2023
Special inspection requirement — Mechanical Systems
FAHAD FATEH
05/18/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/17/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/15/2023
Objection resolved — Addressed
05/12/2023
Objection raised — Other
05/10/2023
Permit issued — General Construction
B00645194-I1-GC
05/09/2023
Filed — New Building
Install wet sprinklers in the entire building in conjunction with B00645194
B00645194-P4
05/03/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/28/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/27/2023
Signed off — New Building
Install wet sprinklers in the entire building in conjunction with B00645194
B00645194-S1
04/26/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/24/2023
Signed off — Alteration
B00673813-I1
04/19/2023
Objection resolved — Addressed
04/19/2023
Objection resolved — Addressed
03/30/2023
Objection resolved — Addressed
03/21/2023
Signed off — Alteration
B08013030-I1
03/21/2023
Signed off — Alteration
INSTALLATPIPE ION OF SIDEWALK SHED, OVERHEAD PROTECTION AND PIPE SCAFFOLDING PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE, NO CHANGESS IN USE IN EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B08000486-I1
Latest 60 of 148 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE CONSTR NYC LLC05/10/2023
DOB NOWMechanical SystemsSigned-offINNOVATIVE CONSTR NYC LLC02/28/2023
DOB NOWConstruction FenceSigned-offBLUE SHINE BUILDERS INC02/15/2023
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN11/16/2022
DOB NOWProtection and Mechanical MethodsSigned-offMANHATTAN D ENTERPRISES09/30/2022
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES09/12/2022
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES09/12/2022
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE CONSTR NYC LLC08/31/2022
DOB NOWSprinklersSigned-offA M B MECHANICAL INC07/27/2022
DOB NOWSupport of ExcavationSigned-offINNOVATIVE CONSTR NYC LLC07/16/2022
DOB NOWStructuralSigned-offINNOVATIVE CONSTR NYC LLC07/15/2022
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN06/08/2022
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE CONSTR NYC LLC05/27/2022
DOB NOWEarth WorkSigned-offINNOVATIVE CONSTR NYC LLC05/23/2022
DOB NOWConstruction FenceSigned-offBLUE SHINE BUILDERS INC02/24/2022
BIS—ISSUEDYATZIV CORP03/22/2022
1 project · most recent 06/22/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/22/2023Permit IssuedINNOVATIVE CONSTR NYC LLCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NAM-U1 36,000 BTU · Heat Pump Outdoor ×17
MXZ-5C42NA3-U1 42,000 BTU · Heat Pump Outdoor ×4
MXZ-3C30NA3-U1 28,000 BTU · Heat Pump Outdoor ×1
1 project · most recent 06/22/2023
Sprinkler System
FiledStatusContractorScope
06/22/2023Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 06/22/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/22/2023Signed-offPRIME PIPING & HEATING INGas, Storm, Water/Sanitary
4 projects · most recent 06/19/2023
General Wiring
FiledStatusContractorScope
06/19/2023CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
12/13/2022CompleteSTAR ELEC'L CONTRACTORS C—
09/22/2022CompleteSOLAS ELECTRICAL CORP—
09/02/2022CompleteS&R ELECTRICAL & MECHANIC—
1 project · most recent 06/22/2023
Steel Concrete
FiledStatusContractorScope
06/22/2023Permit IssuedINNOVATIVE CONSTR NYC LLCSteel, Concrete
1 project · most recent 06/22/2023
Earthwork
FiledStatusContractorScope
06/22/2023Permit IssuedINNOVATIVE CONSTR NYC LLCEarthwork
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
07/09/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/15/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/30/2023Fail-Final PL - Up to 9 Requested FloorsFailView ↗
06/22/2023Fail-Final PL - Up to 9 Requested FloorsFailView ↗
05/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/03/2023Pass-Final CND-Occupancy InspectionPassView ↗
04/28/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/26/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 65
DateRequirementInspectorRole
06/27/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
06/27/2023Maintenance informationFAHAD FATEHenergy_progress
06/27/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
06/27/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
06/27/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
06/27/2023Fire-Resistant Penetrations and JointsPaul Raymondspecial
06/22/2023Fire-Resistant Penetrations and JointsPaul Raymondspecial
06/22/2023HVAC-R and service water piping design and insulationPaul Raymondenergy_progress
06/22/2023Maintenance informationPaul Raymondenergy_progress
06/22/2023HVAC-R and service water heating system controlsPaul Raymondenergy_progress
06/22/2023HVAC-R and service water heating equipmentPaul Raymondenergy_progress
06/22/2023Energy Code Compliance InspectionsPaul Raymondprogress
06/06/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/06/2023Mechanical SystemsFAHAD FATEHspecial
06/06/2023FinalFAHAD FATEHprogress
06/06/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
06/06/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
06/06/2023Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
06/06/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
06/06/2023Maintenance informationFAHAD FATEHenergy_progress
06/06/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
06/06/2023Heating SystemsFAHAD FATEHspecial
05/18/2023Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
05/18/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/18/2023Heating SystemsFAHAD FATEHspecial
Latest 25 of 65.
▾Documents — 132 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/31/2026B00673813-I1Request digital key ↗
08/29/2026B00645194-I1Request digital key ↗
08/29/2026B00645194-S6Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
12/08/2022340870356Open ↗
11/16/2021322101685Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
01/09/2023340870356Open ↗
▸BISWORK PERMIT APPLICATION1
03/24/2022322101685Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00645194-I1Open ↗
08/13/2026B00645194-P3Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B00645194-P3Open ↗
08/13/2026B00645194-I1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
12/08/2022340870356Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00645194-I1Open ↗
▸Seals & Professional Certifications46
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/31/2026B00673813-I1Open ↗
08/29/2026B00645194-S1Open ↗
08/29/2026B00645194-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/25/2026B00645194-P3Open ↗
09/25/2026B00645194-P3Open ↗
09/02/2026B00645194-S5Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/25/2026B00645194-P3Open ↗
09/25/2026B00645194-P3Open ↗
09/25/2026B00645194-P3Open ↗
Showing 3 of 11 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/08/2022340870356Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/09/2023340870356Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B00645194-I1Open ↗
08/13/2026B00645194-P3Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
01/09/2023340870356Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/29/2026B00645194-I1—
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist2
08/29/2026B00645194-I1Open ↗
08/13/2026B00645194-P3Open ↗
▸BISBPP: STREET TREES SITE PLAN1
12/08/2022340870356Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
03/24/2022322101685Open ↗
▸BISSTREET TREE CHECKLIST1
12/15/2022340870356Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00645194-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00645194-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00645194-I1Open ↗
▸Environmental & Asbestos15
▸DOB NOWOER: Notice to Proceed7
08/13/2026B00645194-S6Open ↗
08/13/2026B00645194-I1Open ↗
08/13/2026B00645194-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWOER: Notice of Satisfaction5
08/13/2026B00645194-S3Open ↗
08/13/2026B00645194-S5Open ↗
08/13/2026B00645194-S2Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/24/2022322101685Open ↗
▸BISRODENT CONTROL1
03/24/2022322101685Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
12/08/2022340870356Open ↗
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026B00645194-S6Open ↗
08/13/2026B00645194-S5Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00645194-I1Open ↗
▸Inspections & Test Reports11
▸DOB NOWSOIL REPORT5
08/13/2026B00645194-S1Open ↗
08/13/2026B00645194-P3Open ↗
08/13/2026B00645194-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram3
08/13/2026B00645194-S2Open ↗
08/13/2026B00645194-I1Open ↗
08/13/2026B00645194-S1Open ↗
▸DOB NOWTR4 Plot Diagram3
08/13/2026B00645194-S1Open ↗
08/13/2026B00645194-S2Open ↗
08/13/2026B00645194-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT-SPECIFIC GL INSURANCE1
03/24/2022322101685Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
12/08/2022340870356Open ↗
▸BISEFILING COVER SHEET1
11/16/2021322101685Open ↗
▸Other Documents13
▸DOB NOWProperty Ownership Certification4
08/29/2026B00645194-I1Open ↗
08/13/2026B00645194-P2Open ↗
08/13/2026B00645194-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial2
08/13/2026B00645194-P3Open ↗
08/13/2026B00645194-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00645194-P3Open ↗
08/13/2026B00645194-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00645194-S2Open ↗
08/13/2026B00645194-S1Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
01/09/2023340870356Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00645194-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00645194-I1Open ↗