← Back
BuildNYC
Two stories - detached, small or mid-size
73 MORNINGSTAR ROAD
STATEN ISLAND · Port Richmond · BIN 5026149
💬 Discuss this project
1935Year Built
2.5Stories
A1Building Class
R3-2Zoning
1,884 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · Owner of record: Northeastern Conference Corp Seventh Day Adventists · 4,800 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
StructuralGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofStructural steel and cold formed steel1 filing · 2 docs
Floor 2Cellar, 1st and 2nd floor mechanical work2 filings · 4 docs
Floor 1Cellar, 1st and 2nd floor mechanical work3 filings · 7 docs
CellarNew foundation work and underpinning3 filings · 7 docs
Filed — no permit issued2p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Acv Design504/17/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Acv Design203/21/2026
Building Lifecycle
04/30/2024
Objection raised — Scope
04/25/2024
Objection resolved — Addressed
04/23/2024
Objection raised — Mechanical
04/22/2024
Objection raised — Other
04/17/2024
Filed — Alteration
NEW EXTERIOR WOOD CONSTRUCTION FENCE.
S00027947-I1
22 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 04/15/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
04/15/2024——Heating and Air Conditioning Systems, Ventilation Systems
2 projects · most recent 04/15/2024
FiledStatusContractorScope
04/15/2024———
04/15/2024———
1 project · most recent 04/17/2024
Fence
FiledStatusContractorScope
04/17/2024——Fence
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
04/11/2024Structural Stability – Alterations of existing buildings—special
04/09/2024Underpinning—special
04/09/2024Structural Cold-Formed Steel—special
04/09/2024Concrete - Cast-In-Place—special
03/12/2021Final—progress
03/12/2021Final—progress
03/12/2021Final—progress
03/12/2021Footing and Foundation—progress
03/12/2021Mechanical Systems—special
64 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account