← Back
STATEN ISLAND
73 WOODLAND AVENUE
STATEN ISLAND · Great Kills-Eltingville · BIN 5176307
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Floor 240p · 2 filings · 20 docs
Floor 149p · 2 filings · 20 docs
Cellar39p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JM TRINITY HOLDINGS2407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
C&P DESIGN CONSULTANTS704/09/2025
STANLEY M. KREBUSHEVSKI, R.A.111/06/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEYER CONSTRUCTION CORPGeneral Contractor407/08/2026
PREMIER PL,HTG & MECH INCPlumbing207/08/2026
K.M.D MECHANICAL 1443 LLCFire Protection107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P DESIGN CONSULTANT8472704/09/2025
SRA PLANNING & EXPEDITING5677304/09/2025
Building Lifecycle
All (71)Filed (8)Permit Issued (7)Signed Off (4)Violation (1)Inspection (13)Objection (8)Special Inspection (30)
05/13/2025
Signed off — New Building
Installation of new water service with BFPA and new fire sprinklers system.
S00955228-S2
05/09/2025
Signed off — New Building
Installation of new water service with BFPA and new fire sprinklers system.
S00955228-S3
05/09/2025
Signed off — New Building
Installation of new water service with BFPA and new fire sprinklers system.
S00955228-S1
04/30/2025
Signed off — New Building
Installation of new water service with BFPA and new fire sprinklers system.
S00955228-S4
04/29/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/29/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/10/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Stanislav Pilipenko
04/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
04/10/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
WILLIAM MONTAGUE
04/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
04/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
04/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
04/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
04/10/2025
Special inspection requirement — Maintenance information
Stanislav Pilipenko
04/10/2025
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
04/09/2025
Filed — New Building
Installation of new water service with BFPA and new fire sprinklers system.
S00955228-P3
04/09/2025
Permit issued — Mechanical Systems
S00955228-S2-MS
04/09/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Stanislav Pilipenko
04/09/2025
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
04/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
04/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
04/09/2025
Special inspection requirement — Maintenance information
Stanislav Pilipenko
04/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
04/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
04/09/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
WILLIAM MONTAGUE
04/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
03/13/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/28/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/26/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/25/2025
Permit issued — Sprinklers
S00955228-S3-PL
02/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/24/2025
Special inspection requirement — Heating Systems
Stanislav Pilipenko
02/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
02/24/2025
Special inspection requirement — Chimneys and vents
Stanislav Pilipenko
02/24/2025
Special inspection requirement — Mechanical Systems
Stanislav Pilipenko
02/24/2025
Special inspection requirement — Final
Stanislav Pilipenko
02/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
02/24/2025
Special inspection requirement — Maintenance information
Stanislav Pilipenko
02/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
02/24/2025
Special inspection requirement — Duct leakage testing, insulation and design
Stanislav Pilipenko
02/24/2025
Special inspection requirement — Ventilation and air distribution system
Stanislav Pilipenko
02/24/2025
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
02/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
02/21/2025
Filed — New Building
Installation of new water service with BFPA and new fire sprinklers system.
S00955228-P2
02/18/2025
Permit issued — Curb Cut
S00955228-S4-CC
02/17/2025
Filed — New Building
Installation of new water service with BFPA and new fire sprinklers system.
S00955228-P1
11/26/2024
Filed — New Building
Installation of new water service with BFPA and new fire sprinklers system.
S00955228-S2
11/20/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
11/14/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/13/2024
Violation issued (ECB, closed)
Construction
11/01/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/30/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/30/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/04/2024
Permit issued — Sprinklers
S00955228-S3-EW-SP
09/25/2024
Inspection — Pass-Final Construction Permit Withdrawal
Pass
View inspection ↗
08/21/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/14/2024
Permit issued — Plumbing
S96710157-S1-PL
07/18/2024
Permit issued — Plumbing
S00955228-S1-PL
06/20/2024
Filed — New Building
Installation of new water service with BFPA and new fire sprinklers system.
S00955228-S1
06/18/2024
Filed — New Building
Installation of new water service with BFPA and new fire sprinklers system.
S00955228-S3
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBEYER CONSTRUCTION04/09/2025
DOB NOWSprinklersSigned-offPREMIER PL,HTG & MECH INC02/25/2025
DOB NOWCurb CutSigned-offBEYER CONSTRUCTION02/18/2025
DOB NOWSprinklersSigned-offK.M.D MECHANICAL 1443 LLC10/04/2024
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC08/14/2024
DOB NOWPlumbingSigned-offPREMIER PL,HTG & MECH INC07/18/2024
DOB NOWFoundationPermit IssuedBEYER CONSTRUCTION05/29/2024
1 project · most recent 04/09/2025
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScope
04/09/2025Signed-offBEYER CONSTRUCTION CORPAir Conditioning Systems, Heating Systems, Ventilation Systems
1 project · most recent 04/09/2025
Sprinkler System
FiledStatusContractorScope
04/09/2025Signed-offK.M.D MECHANICAL 1443 LLCSprinkler System
1 project · most recent 04/09/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/09/2025Signed-offPREMIER PL,HTG & MECH INCGas, Storm, Water/Sanitary
1 project · most recent 10/29/2024
General Wiring
FiledStatusContractorScope
10/29/2024CompleteRIDGE ELECTRIC CORP.General Wiring
1 project · most recent 04/09/2025
Wood
FiledStatusContractorScope
04/09/2025Signed-offBEYER CONSTRUCTION CORPWood
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
04/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/29/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
03/13/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/28/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/26/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/20/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
11/14/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/01/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/30/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/25/2024Pass-Final Construction Permit WithdrawalPassView ↗
08/21/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
04/10/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationStanislav Pilipenkospecial
04/10/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
04/10/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesWILLIAM MONTAGUEspecial
04/10/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
04/10/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
04/10/2025HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
04/10/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
04/10/2025Maintenance informationStanislav Pilipenkoenergy_progress
04/10/2025Permanent certificateStanislav Pilipenkoenergy_progress
04/09/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationStanislav Pilipenkospecial
04/09/2025Permanent certificateStanislav Pilipenkoenergy_progress
04/09/2025HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
04/09/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
04/09/2025Maintenance informationStanislav Pilipenkoenergy_progress
04/09/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
04/09/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
04/09/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesWILLIAM MONTAGUEspecial
04/09/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
02/24/2025Heating SystemsStanislav Pilipenkospecial
02/24/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
02/24/2025Chimneys and ventsStanislav Pilipenkospecial
02/24/2025Mechanical SystemsStanislav Pilipenkospecial
02/24/2025FinalStanislav Pilipenkoprogress
02/24/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
02/24/2025Maintenance informationStanislav Pilipenkoenergy_progress
Latest 25 of 54.
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/19/2026S00955228-S2Request digital key ↗
08/19/2026S00955228-P3Request digital key ↗
08/19/2026S00955228-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00955228-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00955228-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S00955228-I1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026S00955228-I1Open ↗
09/01/2026S00955228-I1Open ↗
09/01/2026S00955228-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026S00955228-I1Open ↗
09/01/2026S00955228-I1Open ↗
08/31/2026S00955228-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/19/2026S00955228-P3Open ↗
08/19/2026S00955228-P2Open ↗
08/19/2026S00955228-P1Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S00955228-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00955228-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S00955228-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00955228-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00955228-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00955228-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S00955228-I1Open ↗
▸Other Documents4
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00955228-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/19/2026S00955228-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S00955228-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00955228-I1Open ↗