← Back
Two family brick
7302 11 AVENUE
BROOKLYN · BIN 3148078
💬 Discuss this project
1915Year Built
2Stories
B1Building Class
R4-1Zoning
2,080 sfGross Floor Area
2Units
Two family brick · 1,383 sf lot · 1.5 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 22p · 2 filings · 14 docs
Floor 11p · 1 filing · 8 docs
Cellar5p · 2 filings · 14 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/07/2024$1.6M—— → —$784/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI407/05/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KLE CONSTRUCTION INCGeneral Contractor107/08/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394207/05/2024
Building Lifecycle
All (16)Filed (4)Permit Issued (2)Signed Off (2)Inspection (5)Special Inspection (3)
08/28/2024
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01005187-I1
08/23/2024
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01005191-I1
08/23/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/07/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/05/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01005187-P1
07/05/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01005191-P1
07/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
07/05/2024
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
07/05/2024
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
06/11/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/01/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/01/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/04/2024
Permit issued — Plumbing
B01005191-I1-PL
02/28/2024
Permit issued — General Construction
B01005187-I1-GC
02/23/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01005187-I1
02/23/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01005191-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC03/04/2024
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC02/28/2024
1 project · most recent 03/05/2024
General Wiring
FiledStatusContractorScope
03/05/2024CompleteJ Y ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/23/2024Pass-Final General Construction Non-Directive 14PassView ↗
08/07/2024Fail-Final General Construction Non-Directive 14FailView ↗
06/11/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/01/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
07/05/2024Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
07/05/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
07/05/2024Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/25/2026B01005191-P1Request digital key ↗
08/25/2026B01005191-I1Request digital key ↗
08/25/2026B01005187-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWRestrictive Declaration/Easement 14
08/13/2026B01005191-P1Open ↗
08/13/2026B01005191-I1Open ↗
08/13/2026B01005187-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026B01005191-P1Open ↗
08/25/2026B01005191-I1Open ↗
08/25/2026B01005187-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026B01005187-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026B01005187-P1Open ↗