← Back
Predominantly retail with other uses
731 5 AVENUE
MANHATTAN · BIN 1035792
💬 Discuss this project
1940Year Built
10Stories
K4Building Class
C5-3Zoning
107,086 sfGross Floor Area
1Units
LL97 Covered2 Open Violations ▸FISP: SAFE
Predominantly retail with other uses · Owner of record: TIFFANY AND COMPANY U.S. SALES, LLC · 10,677 sf lot · 10.03 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
Roof99p · 7 filings · 20 docs
Bulkhead2p · 2 filings · 20 docs
Floor 1098p · 7 filings · 20 docs
Floor 997p · 8 filings · 20 docs
Floor 8101p · 11 filings · 20 docs
Floor 7103p · 10 filings · 20 docs
Floor 6105p · 9 filings · 20 docs
Floor 5108p · 9 filings · 20 docs
Floor 497p · 8 filings · 20 docs
Floor 396p · 7 filings · 20 docs
Floor 2110p · 12 filings · 20 docs
Floor 1111p · 10 filings · 20 docs
Mezzanine91p · 1 filing · 20 docs
Cellar102p · 10 filings · 20 docs
Sub-CellarUnder Construction3p · 1 filing · 20 docs
1 job · most recent 08/28/2025
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
08/28/2025Permit IssuedREIDY CONTRACTING GROUPHeating Systems
Heating
Berner IDC14-1048W 2,535 CFM · Air Curtain ×1
1 job · most recent 08/28/2025
FiledStatusContractorScope
08/28/2025Permit IssuedFULL CAPACITY FIRE CORP3 heads
2 jobs · most recent 08/28/2025
Water/Sanitary Gas
FiledStatusContractorScope
08/28/2025Permit IssuedALL PRO PLBG & HTG INCWater/Sanitary
03/09/2023Permit IssuedPACE PLUMBING CORPGas, Water/Sanitary
16 jobs · most recent 03/17/2026
General Wiring
FiledStatusContractorScope
03/17/2026CompleteCORPORATE ELEC. GROUP INC—
04/12/2024CompleteSTRIANO ELECTRIC CO., INCGeneral Wiring
10/16/2023CompleteDAL ELECTRICAL CORP.—
06/05/2023CompleteDAL ELECTRICAL CORP.General Wiring
05/08/2023CompleteSTRIANO ELECTRIC CO., INCGeneral Wiring
01/31/2022CompleteFOREST ELECTRIC CORP.General Wiring
11/02/2021CompleteSTRIANO ELECTRIC CO., INC2 meters, 4 new_meters
09/28/2020Permit IssuedR.C.M. ELECTRIC CORP.—
07/22/2020CompleteSTRIANO ELECTRIC CO., INC—
07/13/2020Permit IssuedDIFAZIO ELECTRIC NY, INCGeneral Wiring
07/13/2020Permit IssuedDIFAZIO ELECTRIC NY, INCGeneral Wiring
07/13/2020Permit IssuedDIFAZIO ELECTRIC NY, INCGeneral Wiring
02/10/2020CompleteSTRIANO ELECTRIC CO., INC—
10/17/2019Permit IssuedH. & L. ELECTRIC INCGeneral Wiring
09/20/2019CompleteUNITY ELECTRIC CO INC—
Building Lifecycle
All (300)Filed (65)Permit Issued (80)Signed Off (49)Facade (FISP) (3)Violation (40)Inspection (21)Objection (12)Special Inspection (30)
07/09/2026
Signed off — Alteration
M01196435-I1
05/07/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/28/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/28/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/08/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/01/2026
Signed off — Alteration
NEW STANDPIPE SYSTEM INCONJUNCTION WITH ALT 1
M00209072-I1
03/25/2026
Permit issued — General Construction
M01366978-I1-GC
03/20/2026
Filed — Alteration
Install of temp scenic partitions and elements, no alt to exist structures, for Tiffany Exhibit. TPA not required, TUP filed as needed. Producer is responsible to monitor site safety. All prod equip removed upon event completion
M01366978-I1
03/04/2026
Signed off — Alteration
Herewith filing for sprinkler system alteration on the 6th floor restroom. No change in use, egress, or occupancy.
M01153913-S2
03/04/2026
Signed off — Alteration
Herewith filing for sprinkler system alteration on the 6th floor restroom. No change in use, egress, or occupancy.
M01153913-S1
03/04/2026
Signed off — Alteration
Herewith filing for sprinkler system alteration on the 6th floor restroom. No change in use, egress, or occupancy.
M01153913-I1
03/04/2026
Signed off — Alteration
Herewith filing for sprinkler system alteration on the 6th floor restroom. No change in use, egress, or occupancy.
M01153913-S3
03/03/2026
Special inspection requirement — Final
JEFFREY REDER
02/20/2026
Signed off — Alteration
IRA to assist with FISP
M00976662-I1
02/19/2026
Signed off — Alteration
Installation of temp trussing.no alt to exist structures for the annual Fifth Ave Holiday Light Show. TPA permit not required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion.
M01145826-I1
01/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/13/2026
Signed off — Alteration
CONSTRUCTION FENCE ENCLSOURE AS PER DRAWINGS. FENCE ENCLSOURE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01283867-I1
12/23/2025
Permit issued — Plumbing
M01266891-S2-PL
12/17/2025
Permit issued — Sprinklers
M01266891-S3-EW-SP
12/16/2025
Permit issued — General Construction
M01266891-I1-GC
12/16/2025
Permit issued — Mechanical Systems
M01266891-S1-MS
12/01/2025
Signed off — Alteration
NEW SPRINKLERN SYSTEM IN CONJUNCTION WITH ALT 1
M00209107-I1
09/15/2025
Filed — Alteration
CONSTRUCTION FENCE ENCLSOURE AS PER DRAWINGS. FENCE ENCLSOURE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01283867-P1
09/10/2025
Permit issued — Construction Fence
M01283867-I1-FN
09/09/2025
Filed — Alteration
CONSTRUCTION FENCE ENCLSOURE AS PER DRAWINGS. FENCE ENCLSOURE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01283867-I1
09/04/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/28/2025
Filed — Alteration
HEREWITH FILING FOR SPRINKLER SYSTEM ALTERATION ON FIRST FLOOR AT THE SERVICE ENTRANCE VESTIBULE. DEMOLISH OF CONCEALED SPRINKLER HEAD AND ADDITION OF CONCEALED SPRINKLER HEADS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01266891-S2
08/28/2025
Filed — Alteration
HEREWITH FILING FOR SPRINKLER SYSTEM ALTERATION ON FIRST FLOOR AT THE SERVICE ENTRANCE VESTIBULE. DEMOLISH OF CONCEALED SPRINKLER HEAD AND ADDITION OF CONCEALED SPRINKLER HEADS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01266891-S1
08/28/2025
Filed — Alteration
HEREWITH FILING FOR SPRINKLER SYSTEM ALTERATION ON FIRST FLOOR AT THE SERVICE ENTRANCE VESTIBULE. DEMOLISH OF CONCEALED SPRINKLER HEAD AND ADDITION OF CONCEALED SPRINKLER HEADS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01266891-S3
08/28/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/26/2025
Filed — Alteration
HEREWITH FILING FOR SPRINKLER SYSTEM ALTERATION ON FIRST FLOOR AT THE SERVICE ENTRANCE VESTIBULE. DEMOLISH OF CONCEALED SPRINKLER HEAD AND ADDITION OF CONCEALED SPRINKLER HEADS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01266891-I1
08/22/2025
Special inspection requirement — Interior lighting power
JONAR MADRIAGA
08/21/2025
Special inspection requirement — Air barrier - visual inspection
JONAR MADRIAGA
08/21/2025
Special inspection requirement — Insulation placement and R values
JONAR MADRIAGA
08/21/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JONAR MADRIAGA
08/21/2025
Special inspection requirement — Air barrier — testing
JONAR MADRIAGA
08/15/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/15/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JONAR MADRIAGA
08/06/2025
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
08/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
08/06/2025
Special inspection requirement — Sprinkler Systems
JONAR MADRIAGA
08/05/2025
Special inspection requirement — Final
JONAR MADRIAGA
08/05/2025
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
08/05/2025
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
08/05/2025
Special inspection requirement — Final
JONAR MADRIAGA
08/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
08/05/2025
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
08/05/2025
Special inspection requirement — Sprayed fire-resistant materials
JONAR MADRIAGA
08/05/2025
Special inspection requirement — Fire-Resistance Rated Construction
JONAR MADRIAGA
04/28/2025
Permit issued — General Construction
M01196435-I1-GC
04/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/21/2025
Filed — Alteration
M01196435-I1
04/11/2025
Signed off — Alteration
SCOPE OF WORK INCLUDES SPRINKLER SYSTEM ALTERATION ON 7TH FLOOR. RELOCATION, REMOVAL AND ADDITION OF NEWSPRINKLER HEADS AND ASSOCIATED PIPING
M00928885-S3
04/07/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/01/2025
Signed off — Alteration
SCOPE OF WORK INCLUDES SPRINKLER SYSTEM ALTERATION ON 7TH FLOOR. RELOCATION, REMOVAL AND ADDITION OF NEWSPRINKLER HEADS AND ASSOCIATED PIPING
M00928885-S1
02/12/2025
Signed off — Alteration
SCOPE OF WORK INCLUDES SPRINKLER SYSTEM ALTERATION ON 7TH FLOOR. RELOCATION, REMOVAL AND ADDITION OF NEWSPRINKLER HEADS AND ASSOCIATED PIPING
M00928885-I1
02/11/2025
Signed off — Alteration
SCOPE OF WORK INCLUDES SPRINKLER SYSTEM ALTERATION ON 7TH FLOOR. RELOCATION, REMOVAL AND ADDITION OF NEWSPRINKLER HEADS AND ASSOCIATED PIPING
M00928885-S2
02/04/2025
Signed off — Alteration
M01125461-I1
02/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 300 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TIFFANY64907/08/2026
DEERPATH CONSTRUCTION607/08/2026
VIK XS SERVICES INC503/22/2026
TIFFANY AND COMPANY U.S. SALES, LLC1603/22/2026
TIFFANNY203/21/2026
SL GREEN103/21/2026
DEUTSCHE BANK203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/01/2017$131.7M—— → —$1,230/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OUTSOURCE CONSULTANTS, INC.8203/21/2026
A1 EXPEDITING SERVICE6603/21/2026
EUROCELT EXPEDITING, INC2803/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
ABCO-PEERLESS SPRINKLER603/21/2026
JME BUILDING CONSULTING, LLC103/21/2026
SKYLINE ACCESS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAFWAY ATLANTIC, LLCGeneral Contractor6607/08/2026
PLATFORM SOLUTIONS, INCGeneral Contractor3007/08/2026
STRUCTURE TONE, LLCGeneral Contractor1407/08/2026
PACE PLUMBING CORPPlumbing807/08/2026
ABCO-PEERLESS SPRKLR CORPFire Protection707/08/2026
CLUNE CONSTRUCTION CO LPGeneral Contractor607/08/2026
ECLIPSE CONTRACTING CORPGeneral Contractor607/08/2026
PAR PLUMBING CO., INCPlumbing307/08/2026
PACE PLUMBING CORPFire Protection307/08/2026
DEERPATH CONSTRUCTIONGeneral Contractor307/08/2026
REIDY CONTRACTING GROUPGeneral Contractor304/09/2026
VIK XS SERVICES INCGeneral Contractor203/21/2026
PETTINATO, JUSTINElectrical203/21/2026
REILLY, CHRISTOPHERElectrical203/21/2026
ARROYO, RAFAELElectrical103/21/2026
PAUL BOCCIAElectrical103/21/2026
MICHAELOFF, STEVENElectrical103/21/2026
WINICK PRODUCTIONS, LLCGeneral Contractor104/09/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
FULL CAPACITY FIRE CORPFire Protection107/08/2026
CHAMP PLUMBING & HTG CORPPlumbing107/08/2026
AGGRESSIVE FIRE PROT LLCFire Protection107/08/2026
SOH PAR SPRINKLER LLCFire Protection107/08/2026
FREDERICK GOLDBERGElectrical103/21/2026
EVENTPERMITS, LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OUTSOURCE SPECIAL INSPECT28271008/28/2025
CROSSCHECK INSPECTION SER5445812/30/2024
SOCOTEC ENGINEERING4983110/27/2024
PLAN B CONSULTANTS, LLC2874203/18/2020
G. BLINN CONSULTING, LLC2894101/02/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedWINICK PRODUCTIONS, LLC03/25/2026
DOB NOWPlumbingPermit IssuedALL PRO PLBG & HTG INC12/23/2025
DOB NOWSprinklersPermit IssuedFULL CAPACITY FIRE CORP12/17/2025
DOB NOWGeneral ConstructionSigned-offREIDY CONTRACTING GROUP12/16/2025
DOB NOWMechanical SystemsPermit IssuedREIDY CONTRACTING GROUP12/16/2025
DOB NOWConstruction FenceSigned-offSAFWAY ATLANTIC, LLC09/10/2025
DOB NOWGeneral ConstructionSigned-offCLUNE CONSTRUCTION CO LP04/28/2025
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC01/03/2025
DOB NOWSprinklersSigned-offAGGRESSIVE FIRE PROT LLC01/03/2025
DOB NOWMechanical SystemsSigned-offCLUNE CONSTRUCTION CO LP01/03/2025
DOB NOWGeneral ConstructionSigned-offCLUNE CONSTRUCTION CO LP01/03/2025
DOB NOWStructuralSigned-offCLUNE CONSTRUCTION CO LP12/09/2024
DOB NOWGeneral ConstructionSigned-offEVENTPERMITS11/26/2024
DOB NOWMechanical SystemsSigned-offECLIPSE CONTRACTING10/03/2024
DOB NOWGeneral ConstructionSigned-offECLIPSE CONTRACTING10/03/2024
DOB NOWSprinklersSigned-offSOH PAR SPRINKLER LLC10/01/2024
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC09/24/2024
DOB NOWSuspended ScaffoldPermit IssuedSKYLINE RESTORATION INC01/09/2024
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC07/14/2023
DOB NOWGeneral ConstructionSigned-offECLIPSE CONTRACTING07/14/2023
DOB NOWMechanical SystemsSigned-offECLIPSE CONTRACTING07/14/2023
DOB NOWSidewalk ShedSigned-offSAFWAY ATLANTIC, LLC05/03/2023
DOB NOWProtection and Mechanical MethodsSigned-offDEERPATH CONSTRUCTION05/01/2023
DOB NOWPlumbingPermit IssuedPACE PLUMBING CORP04/21/2023
DOB NOWPlumbingSigned-offPACE PLUMBING CORP04/20/2023
DOB NOWGeneral ConstructionSigned-offSAFWAY ATLANTIC, LLC04/13/2023
DOB NOWProtection and Mechanical MethodsSigned-offSAFWAY ATLANTIC, LLC04/07/2023
DOB NOWSprinklersSigned-offMANENGEERING BUREAU, INC01/26/2023
DOB NOWMechanical SystemsSigned-offSTRUCTURE TONE, LLC12/27/2022
DOB NOWProtection and Mechanical MethodsSigned-offPLATFORM SOLUTIONS, INC12/27/2022
DOB NOWProtection and Mechanical MethodsSigned-offPLATFORM SOLUTIONS, INC12/09/2022
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP10/28/2022
DOB NOWSupported ScaffoldSigned-offPLATFORM SOLUTIONS, INC10/17/2022
DOB NOWProtection and Mechanical MethodsSigned-offSAFWAY ATLANTIC, LLC10/04/2022
DOB NOWProtection and Mechanical MethodsSigned-offSAFWAY ATLANTIC, LLC09/30/2022
DOB NOWSupported ScaffoldSigned-offSAFWAY ATLANTIC, LLC09/26/2022
DOB NOWSidewalk ShedSigned-offSAFWAY ATLANTIC, LLC09/26/2022
DOB NOWSupported ScaffoldSigned-offSAFWAY ATLANTIC, LLC09/26/2022
DOB NOWSupported ScaffoldSigned-offSAFWAY ATLANTIC, LLC09/26/2022
DOB NOWConstruction FenceSigned-offSAFWAY ATLANTIC, LLC09/26/2022
+ 60 more permits on file
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
05/07/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/28/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/28/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/08/2026Pass-Final General Construction Non-Directive 14PassView ↗
01/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/04/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/28/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/15/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/28/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/26/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/15/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/04/2024Certified Medical Gas - MG - PL - FinishCertifiedView ↗
10/04/2024Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
10/04/2024Certified Medical Gas - MG - PL - TestCertifiedView ↗
10/06/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/14/2022Pass-Final Boiler Equipment InspectionPassView ↗
04/15/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
03/03/2026FinalJEFFREY REDERprogress
08/22/2025Interior lighting powerJONAR MADRIAGAenergy_progress
08/21/2025Fenestration and door U-factor and product ratingsJONAR MADRIAGAenergy_progress
08/21/2025Insulation placement and R valuesJONAR MADRIAGAenergy_progress
08/21/2025Air barrier - visual inspectionJONAR MADRIAGAenergy_progress
08/21/2025Air barrier — testing JONAR MADRIAGAenergy_progress
08/12/2025HVAC-R and service water piping design and insulationJONAR MADRIAGAenergy_progress
08/06/2025Sprinkler SystemsJONAR MADRIAGAspecial
08/06/2025Energy Code Compliance InspectionsJONAR MADRIAGAprogress
08/06/2025Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
08/05/2025Sprayed fire-resistant materialsJONAR MADRIAGAspecial
08/05/2025FinalJONAR MADRIAGAprogress
08/05/2025Energy Code Compliance InspectionsJONAR MADRIAGAprogress
08/05/2025Mechanical SystemsJONAR MADRIAGAspecial
08/05/2025Fire-Resistance Rated ConstructionJONAR MADRIAGAprogress
08/05/2025Energy Code Compliance InspectionsJONAR MADRIAGAprogress
08/05/2025FinalJONAR MADRIAGAprogress
08/05/2025Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
12/23/2024Energy Code Compliance InspectionsEUGENE BIFULCOprogress
12/20/2024Energy Code Compliance InspectionsEUGENE BIFULCOprogress
12/10/2024Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
12/10/2024Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
12/10/2024FinalEUGENE BIFULCOprogress
12/10/2024FinalEUGENE BIFULCOprogress
12/10/2024Mechanical SystemsEUGENE BIFULCOspecial
Latest 25 of 150.
▾Documents — 1,715 on file (BIS + DOB NOW)
▸Plans & Drawings112
▸DOB NOWPlans/Sketch52
09/03/2026M00505249-I1Contact architect ↗
09/03/2026M00505249-P1Contact architect ↗
09/03/2026M00514933-I1Contact architect ↗
Showing 3 of 52 on file for this type
▸DOB NOWPlans/Sketch - Plumbing13
09/04/2026M00209023-P8Contact architect ↗
09/04/2026M00209023-P6Contact architect ↗
09/04/2026M00209023-P3Contact architect ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold11
09/05/2026M00276508-I1Contact architect ↗
09/05/2026M00283888-I1Contact architect ↗
09/05/2026M00323333-I1Contact architect ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler8
09/05/2026M00209107-P3Contact architect ↗
09/05/2026M00209107-P2Contact architect ↗
09/05/2026M00209107-P1Contact architect ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed8
09/03/2026M00217047-P4Contact architect ↗
09/03/2026M00217047-I1Contact architect ↗
09/03/2026M00217047-P7Contact architect ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems6
09/05/2026M00208949-P1Contact architect ↗
09/05/2026M00208949-I1Contact architect ↗
09/05/2026M00225217-I1Contact architect ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Standpipe5
09/03/2026M00292480-I1Contact architect ↗
09/03/2026M00292480-P2Contact architect ↗
08/31/2026M00209072-I1Contact architect ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Structural5
09/05/2026M00197464-I1Contact architect ↗
09/05/2026M00197464-P1Contact architect ↗
09/05/2026M00212223-P1Contact architect ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence3
09/05/2026M00230336-P1Contact architect ↗
09/05/2026M00230336-I1Contact architect ↗
09/05/2026M00230336-P2Contact architect ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Applications & Permits264
▸BISPLAN / WORK APPROVAL APPLICATION164
11/13/2025120301805Open ↗
04/04/2024123345969Open ↗
04/04/2024122697750Open ↗
Showing 3 of 164 on file for this type
▸BISWORK PERMIT APPLICATION100
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 100 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISZoning Diagram (ZD1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications591
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION144
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 144 on file for this type
▸DOB NOWProgress Inspector Seal & Signature112
09/26/2026M00928885-P1Open ↗
09/26/2026M00928885-P1Open ↗
09/26/2026M00928885-P1Open ↗
Showing 3 of 112 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature111
09/05/2026M00197464-P1Open ↗
09/05/2026M00197464-I1Open ↗
09/05/2026M00208949-P2Open ↗
Showing 3 of 111 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature87
09/26/2026M00928885-P1Open ↗
09/23/2026M00538170-I1Open ↗
09/23/2026M00541271-I1Open ↗
Showing 3 of 87 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT44
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 44 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST39
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 39 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISPC FULL REPORT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment67
▸BISSCHEDULE B - PLUMBING16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISSELF-CERT PLUMBING NOTICE14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISEQUIPMENT USE PERMITS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTANDPIPE SYSTEMS1
06/22/2022123708229Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos97
▸DOB NOWDEP ACP-5: Asbestos Assessment Report29
09/05/2026M00197464-P1Open ↗
09/05/2026M00197464-I1Open ↗
09/02/2026M00541271-I1Open ↗
Showing 3 of 29 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form10
09/05/2026M00208949-I1Open ↗
09/05/2026M00310864-I1Open ↗
09/05/2026M00225217-I1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: VARIANCE (DEP FORM V5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance67
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS35
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 35 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
01/26/2023123799611Open ↗
12/08/2022123799611Open ↗
Showing 2 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)4
04/21/2023123799611Open ↗
04/10/2023140963483Open ↗
04/04/2023140963535Open ↗
Showing 3 of 4 on file for this type
▸BISENERGY COST BUDGET WORKSHEET3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION2
01/23/2026123799611Open ↗
07/10/2024123799611Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports41
▸BISTECHNICAL REPORT: RESPONSIBILITY33
02/18/2026140972222Open ↗
11/29/2023140864571Open ↗
09/13/2023140890953Open ↗
Showing 3 of 33 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)3
04/10/2023140963483Open ↗
06/22/2022123708229Open ↗
04/21/2022123755873Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS2
09/15/2022140869674Open ↗
Showing 1 of 2 on file for this type
▸BISMECHANICAL DEMOLITION1
06/06/2022140886147Open ↗
▸Approvals, Objections & Sign-offs147
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST52
02/18/2026140972222Open ↗
04/10/2025123708229Open ↗
08/08/2024120289142Open ↗
Showing 3 of 52 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION45
03/14/2023123799611Open ↗
01/26/2023123799611Open ↗
01/12/2023140963483Open ↗
Showing 3 of 45 on file for this type
▸BISADMINISTRATIVE OBJECTIONS23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISFINAL9
09/14/2023140890953Open ↗
05/01/2023141004712Open ↗
04/10/2023140963483Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
03/14/2023123799611Open ↗
02/03/2023123799611Open ↗
01/26/2023123799611Open ↗
Showing 3 of 6 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSUPERSEDING LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP Variance (V5) letter2
09/05/2026M00310864-I1Open ↗
Showing 1 of 2 on file for this type
▸Cost, Insurance & Ownership108
▸BISCOST AFFIDAVIT99
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 99 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW37
06/19/2024120301798Open ↗
11/29/2023140864571Open ↗
05/01/2023141004712Open ↗
Showing 3 of 7 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms167
▸BISEFILING COVER SHEET67
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 67 on file for this type
▸BISADDITIONAL INFORMATION62
03/14/2023123799611Open ↗
03/14/2023123799611Open ↗
03/14/2023123799611Open ↗
Showing 3 of 62 on file for this type
▸BISBOROUGH INTAKE FORM21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸DOB NOWAI1 Form (from plan PDF)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents16
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION11
04/04/2024123345969Open ↗
04/04/2024122697750Open ↗
04/04/2024122060606Open ↗
Showing 3 of 11 on file for this type
▸BISLUMINOUS EGRESS PATH MARKINGS2
04/10/2023140963483Open ↗
04/10/2023140963483Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type