← Back
Three families
731 NOBLE AVENUE
BRONX · BIN 2021982
💬 Discuss this project
1920Year Built
2Stories
C0Building Class
R6Zoning
3,450 sfGross Floor Area
3Units
Rent Stabilized17 Open Violations ▸FDNY Report ↗
Three families · Owner of record: 731 NOBLE AVENUE CORP. · 2,500 sf lot · 1.38 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingLandscape
Floor 214p · 1 filing · 19 docs
Floor 115p · 1 filing · 19 docs
Basement16p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
731 NOBLE AVENUE CORP.103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GINO O. LONGO, ARCHITECT306/13/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MACINTOSH ELECTRIC CORPElectrical103/22/2026
JH CREW INCGeneral Contractor106/28/2026
JOHN'S PLBG & HTG, INCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616306/13/2025
Building Lifecycle
All (80)Filed (3)Permit Issued (2)Violation (31)Inspection (6)Objection (8)Special Inspection (30)
07/30/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/03/2025
Permit issued — General Construction
X01051696-I1-GC
07/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
FAHAD FATEH
06/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
06/25/2025
Special inspection requirement — Metering
FAHAD FATEH
06/25/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
06/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/25/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
06/25/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
06/25/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
06/25/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
06/25/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
06/25/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
06/20/2025
Objection resolved — Addressed
06/17/2025
Objection raised — Admin
06/13/2025
Filed — Alteration CO
APPLICATION FILED FOR CONVERSION OF EXISTING 2 STORY & BASEMENT, THREE CLASS A DWELLINGS INTO FOUR CLASS A DWELLINGS AND ELIMINATING DUPLEX CONDITION AT BASEMENT APARTMENT BY CLOSING OFF EXISTING DOOR TO UPPER BEDROOM, AND MINOR INTERIOR RENOVATIONS.
X01051696-P1
06/12/2025
Permit issued — Plumbing
X01051696-S1-PL
06/05/2025
Violation issued (HPD, closed)
A
05/23/2025
Objection resolved — Addressed
05/14/2025
Objection raised — Energy
05/14/2025
Objection resolved — Addressed
05/14/2025
Objection resolved — Addressed
05/12/2025
Objection raised — Plumbing
05/12/2025
Objection raised — Plumbing
05/07/2025
Filed — Alteration CO
APPLICATION FILED FOR CONVERSION OF EXISTING 2 STORY & BASEMENT, THREE CLASS A DWELLINGS INTO FOUR CLASS A DWELLINGS AND ELIMINATING DUPLEX CONDITION AT BASEMENT APARTMENT BY CLOSING OFF EXISTING DOOR TO UPPER BEDROOM, AND MINOR INTERIOR RENOVATIONS.
X01051696-S1
05/07/2025
Special inspection requirement — Fenestration areas
05/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
FAHAD FATEH
05/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
05/07/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
05/07/2025
Special inspection requirement — Metering
05/07/2025
Special inspection requirement — Insulation placement and R values
05/07/2025
Special inspection requirement — Air barrier - visual inspection
05/07/2025
Special inspection requirement — Interior lighting power
05/07/2025
Special inspection requirement — Permanent certificate
05/07/2025
Special inspection requirement — Fenestration air leakage
11/15/2024
Special inspection requirement — Permanent certificate
FAHAD FATEH
11/15/2024
Special inspection requirement — Tenant Protection Plan Compliance
FAHAD FATEH
11/15/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
11/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
11/15/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
11/15/2024
Special inspection requirement — Metering
FAHAD FATEH
11/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
09/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/13/2024
Filed — Alteration CO
APPLICATION FILED FOR CONVERSION OF EXISTING 2 STORY & BASEMENT, THREE CLASS A DWELLINGS INTO FOUR CLASS A DWELLINGS AND ELIMINATING DUPLEX CONDITION AT BASEMENT APARTMENT BY CLOSING OFF EXISTING DOOR TO UPPER BEDROOM, AND MINOR INTERIOR RENOVATIONS.
X01051696-I1
01/03/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/03/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/17/2023
Violation issued (HPD, closed)
A
01/03/2023
Violation issued (HPD, open)
B
01/03/2023
Violation issued (HPD, open)
B
01/03/2023
Violation issued (HPD, open)
C
12/30/2022
Violation issued (HPD, open)
B
12/30/2022
Violation issued (HPD, open)
C
12/30/2022
Violation issued (HPD, closed)
C
12/30/2022
Violation issued (HPD, closed)
C
02/18/2022
Violation issued (HPD, closed)
A
04/05/2021
Violation issued (HPD, closed)
A
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedJH CREW INC07/03/2025
DOB NOWPlumbingPermit IssuedJOHN'S PLUMBING & HEATING06/12/2025
1 project · most recent 06/13/2025
Water/Sanitary
FiledStatusContractorScope
06/13/2025Permit IssuedJOHN'S PLUMBING & HEATINGWater/Sanitary
1 project · most recent 07/24/2025
General Wiring
FiledStatusContractorScope
07/24/2025Permit IssuedMACINTOSH ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/06/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/03/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/03/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
06/25/2025Tenant Protection Plan ComplianceFAHAD FATEHspecial
06/25/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
06/25/2025MeteringFAHAD FATEHenergy_progress
06/25/2025Fenestration air leakageFAHAD FATEHenergy_progress
06/25/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/25/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
06/25/2025Interior lighting powerFAHAD FATEHenergy_progress
06/25/2025Permanent certificateFAHAD FATEHenergy_progress
06/25/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
06/25/2025Fenestration areasFAHAD FATEHenergy_progress
06/25/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
05/07/2025Fenestration areas—energy_progress
05/07/2025Fire-Resistant Penetrations and Joints—special
05/07/2025Tenant Protection Plan ComplianceFAHAD FATEHspecial
05/07/2025Fire-Resistance Rated Construction—progress
05/07/2025Fenestration and door U-factor and product ratings—energy_progress
05/07/2025Metering—energy_progress
05/07/2025Insulation placement and R values—energy_progress
05/07/2025Air barrier - visual inspection—energy_progress
05/07/2025Interior lighting power—energy_progress
05/07/2025Permanent certificate—energy_progress
05/07/2025Fenestration air leakage—energy_progress
11/15/2024Permanent certificateFAHAD FATEHenergy_progress
11/15/2024Tenant Protection Plan ComplianceFAHAD FATEHspecial
11/15/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
Latest 25 of 30.
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/19/2026X01051696-S1Request digital key ↗
08/19/2026X01051696-I1Request digital key ↗
08/19/2026X01051696-P1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026X01051696-I1Open ↗
09/01/2026X01051696-I1Open ↗
08/23/2026X01051696-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026X01051696-I1Open ↗
08/23/2026X01051696-S1Open ↗
08/23/2026X01051696-S1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/19/2026X01051696-S1Open ↗
08/19/2026X01051696-I1Open ↗
08/19/2026X01051696-P1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026X01051696-I1Open ↗
08/13/2026X01051696-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/19/2026X01051696-I1Open ↗
08/19/2026X01051696-P1Open ↗
08/19/2026X01051696-S1Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/19/2026X01051696-I1Open ↗
08/19/2026X01051696-P1Open ↗