← Back
Two family converted from one family
732 DESMOND COURT
BROOKLYN · Gravesend (South) · BIN 3195570
💬 Discuss this project
1930Year Built
2.5Stories
B3Building Class
R4Zoning
1,480 sfGross Floor Area
2Units
Two family converted from one family · 4,000 sf lot · 0.37 FAR built · Flood zone X500
Locations of Work
ArchitectureStructural
Roof2p · 2 filings · 20 docs
Cellar3p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FOCAL POINT ARCHITECTS & ASS.102/03/2026
RAHMAN CONSULTING309/29/2025
MSM ENGINEERING SERVICES, PLLC404/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MISTER EXPEDITER703/21/2026
Building Lifecycle
All (79)Filed (8)Objection (41)Special Inspection (30)
02/26/2026
Objection resolved — Addressed
02/13/2026
Objection raised — Admin
02/13/2026
Objection resolved — Addressed
02/13/2026
Objection raised — Energy
02/12/2026
Objection raised — Zoning
02/12/2026
Objection resolved — Addressed
02/11/2026
Objection raised — Zoning
02/11/2026
Objection resolved — Addressed
02/11/2026
Objection raised — Admin
02/11/2026
Objection resolved — Addressed
02/10/2026
Objection resolved — Addressed
02/10/2026
Objection resolved — Addressed
02/10/2026
Objection resolved — Addressed
02/10/2026
Objection resolved — Addressed
02/10/2026
Objection resolved — Addressed
02/10/2026
Objection resolved — Addressed
02/10/2026
Objection resolved — Addressed
02/06/2026
Objection raised — Zoning
02/05/2026
Objection raised — Zoning
02/05/2026
Objection raised — Zoning
02/04/2026
Objection raised — Zoning
02/04/2026
Objection raised — Zoning
02/04/2026
Objection raised — Admin
02/04/2026
Objection raised — Admin
02/03/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
B01351956-I1
11/11/2025
Objection resolved — Addressed
10/17/2025
Objection resolved — Addressed
10/17/2025
Objection resolved — Addressed
10/15/2025
Objection raised — Other
10/08/2025
Objection raised — Other
10/01/2025
Objection raised — Other
09/29/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Plumbing work in conjunction to ALT_CO application
B01145954-S3
09/29/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Plumbing work in conjunction to ALT_CO application
B01145954-S6
09/29/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Plumbing work in conjunction to ALT_CO application
B01145954-S2
09/15/2025
Special inspection requirement — Structural Steel - Details
09/15/2025
Special inspection requirement — Structural Steel - High Strength Bolting
09/15/2025
Special inspection requirement — Structural Steel - Welding
09/15/2025
Special inspection requirement — Structural Wood Frame
09/15/2025
Special inspection requirement — Concrete - Cast-In-Place
09/15/2025
Special inspection requirement — Structural Cold-Formed Steel
05/01/2025
Objection raised — Scope
05/01/2025
Objection raised — Scope
05/01/2025
Objection raised — Inspections
05/01/2025
Objection raised — Scope
05/01/2025
Objection raised — Fire_Protection
05/01/2025
Objection raised — Scope
05/01/2025
Objection raised — Mechanical
05/01/2025
Objection raised — Scope
05/01/2025
Objection raised — Other
05/01/2025
Objection raised — Cost
05/01/2025
Objection raised — Other
04/25/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Plumbing work in conjunction to ALT_CO application
B01145954-S5
04/25/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Plumbing work in conjunction to ALT_CO application
B01145954-S4
04/24/2025
Special inspection requirement — Ventilation and air distribution system
04/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
04/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
04/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
04/22/2025
Special inspection requirement — Maintenance information
04/22/2025
Special inspection requirement — Energy Code Compliance Inspections
04/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Latest 60 of 79 events.
Nothing on file for this building.
1 project · most recent 09/29/2025
Heating and Air Conditioning Systems
FiledStatusContractorScope
09/29/2025——Heating and Air Conditioning Systems
1 project · most recent 09/29/2025
Gas Water/Sanitary
FiledStatusContractorScope
09/29/2025——Gas, Water/Sanitary
1 project · most recent 09/29/2025
Steel Concrete Wood
FiledStatusContractorScope
09/29/2025——Steel, Concrete, Wood
1 project · most recent 09/29/2025
Fence
FiledStatusContractorScope
09/29/2025——Fence
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
09/15/2025Structural Steel - Details—special
09/15/2025Structural Steel - High Strength Bolting—special
09/15/2025Structural Steel - Welding—special
09/15/2025Structural Wood Frame—progress
09/15/2025Concrete - Cast-In-Place—special
09/15/2025Structural Cold-Formed Steel—special
04/24/2025Ventilation and air distribution system—energy_progress
04/24/2025HVAC-R and service water heating equipment—energy_progress
04/24/2025HVAC-R and service water heating system controls—energy_progress
04/24/2025HVAC-R and service water piping design and insulation—energy_progress
04/22/2025Maintenance information—energy_progress
04/22/2025Energy Code Compliance Inspections—progress
04/22/2025Fire-Resistant Penetrations and Joints—special
04/22/2025HVAC-R and service water heating equipment—energy_progress
04/22/2025HVAC-R and service water heating system controls—energy_progress
04/22/2025HVAC-R and service water piping design and insulation—energy_progress
04/22/2025Permanent certificate—energy_progress
03/26/2025Structural Stability – Alterations of existing buildings—special
03/26/2025Structural Stability – Alterations of existing buildings—special
03/25/2025Metering—energy_progress
03/25/2025Interior lighting power—energy_progress
03/25/2025Electric vehicle service equipment requirements—energy_progress
03/25/2025Maintenance information—energy_progress
03/12/2025Mechanical Systems—special
03/12/2025Final—progress
Latest 25 of 40.
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/20/2026B01145954-S4Request digital key ↗
08/20/2026B01145954-S6Request digital key ↗
08/20/2026B01145954-S2Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01351956-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01351956-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01351956-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/20/2026B01145954-S1Open ↗
08/20/2026B01145954-S5Open ↗
08/20/2026B01145954-S4Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/20/2026B01145954-S2Open ↗
08/20/2026B01145954-S1Open ↗
08/20/2026B01145954-S6Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/20/2026B01145954-S2Open ↗
08/14/2026B01145954-S3Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/14/2026B01145954-S3Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026B01351956-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01351956-I1Open ↗
▸DOB NOWProperty Ownership Certification1